HomeMy WebLinkAboutCO 17CHANGE ORDER owner
COR Form Architect
(This form is to be executed In triplicate and each party is to retain an original,) Contractor
Project Name:
RENTON SENIOR HOUSING
Date: July 13,
1997
Project Address:
3151 NE 18th Street
Change Order No.:
Seventeen (17 )
Contractor Name:
KIRTLEY-COLE ASSOCIATES
ORB Project No.:
9007
d, Address
1002 -10th Street
COR Project No,:
CAG 095-91
Add ;l, 165.49
Snohomish, Washington 98290
Contract For
General Construction
3) Per ORB Proposal Request No. 33, 6/2/92 and Kirtley-Cale
Contract Date:
October 31, 1991
The Contract is hereby amended as follows:
O
1) Per ORB Proposal Request No. 27 (partial), 6/2/92 and
Kirtley-Cole Modification Proposal No. 38R (attached):
Add $2,330.99
""Stick frame (2) dormers at 2 -hour area separation wall."
2) Per ORB Proposal Request No. 46, 6/25/92 and Kirtley-Cole
Modification Proposal No. 56, 7/2/92 (attached): "Stick
Add ;l, 165.49
frame (L) additional dormer at south end of east wing."
3) Per ORB Proposal Request No. 33, 6/2/92 and Kirtley-Cale
Q
Modification Proposal Vo. 51, 6/30/92 (attached): Provide
.
Add i309Q08
changes."
plumbing and architectural,
i
4) Per ORB Proposal Request No. 37, 6/2192 and Kirtley-Cole
Modification Proposal No. 52, 6/30/92 (attached): Delete
155).""
Delete ( -L36.00)
door louvres at Doors #162 b 465 (laundry room
rh
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: ......................................
Add $6,450.56
s labor, material, overhead, profit, and all direct
The Change Order shall include all Contracton)
and/or Indirect costs associated
with the Change In Scope of Work.
to
This Change Order Is not valid unless signed by the Owner, Architect, and Contractor.
$4,620.765.00
The Original Contract Sum was.................................................................................................
590,796,77
Net Change by previously authorized Change Order(s) was .........................................................
5,211,561.78
The Contract Sum prior to this Change Order was 6.450.56
The Contract Sum wilt be revised by this Change Order in the amount of ....................................
012.34
5,2Lt3,4
The new Contract Sum Incorporating this Change Ordorwlll be
+ 4 days
days
TheContract Time will be changed by .....................................................................................
The Substantial Completion Date Including this Change Order Is ................................................"January
7, 1993
_
*See Change Odrer 112 for TBD items.
NOTE: The above summary does not Include any changes in the Contract Sum or Contract Time whAh have been approved
N
by ORB Farm 301 - ConstrucUon Change Directive or Owners Field Directives.
THE ORB ORGANIZATION, INC,
807 SW Grady Way, Suite 210
Renton, Washington 98055
t3oAar . Dev
Date
KIRTLEY-COLE ASSOCIATES
1002. 10th Street
Snohomish, Washington 98290
7'\Pbrdon Cote
/ ai^j rf
Date
CITY OF RENTON. P ri R DEPT.
200 Mill Avenue South
Renton, Washington 98055
1lincent Lea
MODIYr'ICA IONx. -WPOSAL
KM71.FsY Prn'w, RENI'ON SENIOR HOUSING - JOB 1315
COLE 0
ASSOCIATES, INC
W1111111111111111 sonom Date: July 2, 1992
oorauwta
P.O. �a �79 H1: To: TORB ORGANIZATION
utobcmish
wu6. 914.90 Initiated by: Archiltu
(2061561.3115
ModIllt2tlon Propusal: Stick frame (2) dormers 10c3t0d at dormers at 2 -hour area separatlan walla:
Murs Constructl0a
NOTE: I,M11t)1iDIATE ApPRovAL IS NECESSARY TO AVOID DELAY IN SCHEDULE
Subtotal • .
Overhead & PrO It 0 15 % ... .. .
Bonding ® 2% .. ... . .
TOW .
Rersnrt ror Moditleatlont as per PROPOSAL RUQUESi' #27 (PARTIAL ITEM #4 ONLY)
Cost:Additional: 52,330,99 Credit,: 5-0- Net:
Chance in Calendar Dabs: TWO (2)
Iteeommendatlont
Architect
(General Contractor
Owner
Modincatiun Prnpoeal Inco puruted Into Chanttc Order Numbort 17 ,r
Atuehmenv: Murs C=nntrwiun Coatpany ptvposrd dated 611702
No a stmt wrll bat trkcn regardlnj this item until we rjcaive wry Ruutoewlen d+rwint us M do "a -
AO ooarnd wurlc will pr000ed on iu "O (whodulc
PROPOSAL NO. _UlJBn41Si11
1.987.20
$1,987.20
$298.08
545.71
52.330.99
$2,330.99
«.. CITY OF RWON la 00g;peF;
ILI
t
HIM$ C0143Z'RUCTIom COMPANY 06/13/92
4713 CLa1 WCft AV'R
revised 06/17/!2
XV=W=, *&. 98303
=1 306-481-89$4
• lA7Cr206-621-0940 Q � � � � u
]FATLY -=LB
1002 10Th STREET JUN 7 S9gZ
P.O. BOX 1179
BUDD i3A, WA. 982.90
M1206-568-317'3 !JORW•COLE AS$OCrIAT S
PAX1206-568-79 .9
rat proposal 127 Regtiest
Revised 6/17/92
GMNMJE is
1.Rslocate 2 -hour separation gall, 90 ainute double agrees.
NOT WHIM OUR SCOPE OF / M/A.
2.INSTAM add. layer 6/8 qxb
1f/�►
3.Instsll 2- layars qwb
N/A
4. Install 2 -hour separation galla through Dormers,add additions].
layer 3/8" 0W and delete strip vent at underside of soffit
at 1 -hour wall locations.
IS 3NEW Y 9=3X.3is-00� - $864.00
' 129.60
$993.60 mi DOAIt
PasT MxMG - 1 DORS
2 DORMERa X $993.61
TOTAL MU23T $ 1,967.20
8+001Mdary request not an this proposal request is for the
reconstruction of and Dormer that xaorn as shad rmgt
Ea +
st wing .. Y y doz$ 993.60
Total request for both issues
AUPACTF=Y
KIRTLEY MODIFICATION . ROFOSAL,
COLE • project: RENTON SENIOR HOUSING - JOB 0315
ASSOCIATES, INC
�T Data: July 2, 1992
onntrAwn!
P.O, bntt 1179
1041 • 10th To: THE ORB ORGANIZATION, INC.
uwhmikh
wqh. 9tt290 Initiated hy: Architect
1206) 563-3175
Modification Proposal: Stick frame (1) additional dormer located A 304 and of E. wing:
Muts Construction Company
NOTE: IMMEDIATE APPROVAL IS NECESSARY TO AVOID DELAY IN SCHEDULE
Suluntal .. . ,
Overhead & Profit ® 13 %................. ............
Bonding 0 2% ... .
Total .............. .. ...
Ramon for Modification: tut per PROPOSAL, REQUEST' 046
Cal: Additiunal: $1,165.49 Credits: 5.0- Not:
Change In Cakndar Dalm ONE (1)
Recommendation:
Architect
Genoral Contractus
Owner
t
Mudiflestion Pruponal Tncarpornted into CNqo Order Dumber: /7 , r�elyd (i✓ Y /
Attat:ltments: Mure Conarmliun Company - proposal dxtud 6117/92
No action "I be seken ngardiva thi+ kan until we Twelve wrk tw mAlwnuttun dtreaing us to do to.
All unrrreut work will PrOCOW On i1a narrnal tahodula.
rltorosAt. NO,
993.60
$993.60
$149.04
$22.85
$1,165.49
$1,165.49
. 7� .
CONSTRUCTION COMPA2tY 06/ls/9Z �
1 GLENWOOD AVE revised 06/17/92
,KA. 98103
8206-481-3933
i2ti6-621-03Cs Q L�
1 10TH S7%ZXT JUN 17 1ca�
WX 117'9
im'WA. 98290 KIR(.COLE ,ASSOCIATES
1106-348--3179
iZ04-968-7919 z
O
Proposal 127 2Aquast
Revised 6/17/92
1.RelocAte 2 -hour separation wall, 9a minute double pig•
HOT WX=X OUR SCOPE OP WORK/ X/A. Sin
2.VSTALL add. layer 5/8 gwb�4
N/A 0C
3.1notall 2-14y*" gwb
R/aM
4.Inntall 1 -hour separation walls through Dormars,xdd additions:. Q
layer s/a" Crib and delete strip vent at underside of soffit `_ r
nt 3 -hour wall locations.
Cn
ADDITIONAL MAN HOURS PER DOREZR! �
3NEN X g S X $33.00/HR $464.00
i P60 ls% 1129.60
$993.60 PER DOW=
�n
EAST WING - 1 DORMERS Erin
WEST WIXG - 1 DORS
2 �DORMEAS X $993.60 y* $ 1, 967.20 t;;
To'iiLL RSCCJ T $ 1,987.20
zy request not on this proposal request is for the �
ction of and Dormer that.was-shy as sh*d roofs �^
Lust wing 1 dox r # 993. 60 `1i } O
n
request for both issuets $ 2,980-80 in