Loading...
HomeMy WebLinkAboutCO 18RENTON PARKS TEL No.2775523 Rua 18.92 12:06 No -001 F'-02 CHANGE ORDER Owner COP Forrn 2 Per Kirtiey-Cole Modification Proposal 041, 6/23102, and RFI 160, " Architect (This fomr is to be executed In triplicate and each porly Is to retain an origlnol.) Conlrnclor Project Name: RENTON SENIOR HOUSING hole: August 12, 1992 Project Address: 5151 NE 161h &beet Change Order No.: Eighteen (16) Revised Contractor Name: KIRTLEY-COL E ASSOCIATES OR8 Project No.: COR Project No.: 0007 CAG 095.91 & Address 1002. 101h Street Snohomish, Washington 98290 Contract For. General Construction Contract Dote: October 31, 1991 The Conlract is heroby amended as follows: 1. Per Kidley-Cole Modiflcalion Proposal 039R, 7116192 and RFI 141, 8117192 (stlnched): 'Provide concrelo bases for PF bollard lights." Add $54G 27 2 Per Kirtiey-Cole Modification Proposal 041, 6/23102, and RFI 160, " Add $32281 6/22192 (attached): "Trim roof sheathing to allow for gutter Installation 3, Per ORB Proposal Request 035, 012192, and Kirlley Colo Moditicalion Proposal 045R, 7116192 (eltached): `Re-roiote exhaust dud from [levalm MIC Room 0163 Into Unit 128.' Acid $245.33 4, Per ORB Proposal Request 047, 5126102, Klrlley Cole Modification Proposnl #61, T/10192, and Field Directive No, 24, 7/22192 (Copfes attached): "Provide louvers at south end of east wing and south end Add $2,600.03 of west wing.' TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDE13:..................................... Add $3,915.24 T Ire Change Order shall Include all :'onlraclor(s) labor, melerial, overhead, profit, and all direct aridlor Indirect costs associated With the Change in Scope of Work. This Change Order Is not vend unless signed the Owner, ArzhlleCl, amend Contractor. TheOriginal Contract sum was .................. ................................... ................ .......... ........ ---- ...... — ...... ...... t4,620,765.00 Net Chnngn by previously authorized Change Ordor(s) was ... ...... ......... ......... ...................................................... 597,247.34 The Contract Sum prior to this Charwo Order was............................................................................................. 6,218,012.34 The Contract Sum will be revised by this Change Order In the amount of ....... ............................................. ............. 3,915.24 The new Contract Sum Inoorporallno this Change Order will be....................................................................... 3,221.927,58 The Coalroct Time will be Changed by......................................................................................... +2 days The Subslanllal Completion Data Including this Change Order Is.................................................................*January 9, 1993 'See Chongi Order 4112 and Item 4 above for TBD Items. NOTE: The above summary does not include any changes In the Contract Sum or Contract Time which hove been approved by ORB Form. 301 - Construction Change Directive or Ownor"a Field Diroctivos, THE OR13 ORGANITATION, INC 807 SW Grady Way, Suite 210 Renton, Washington 98055 f 1(r ' P De imam, AIA Bete KIRTLEY-COLE ASSOCIATE'1 t002. 10th Street Snohomish, Washington 08290 a —9� ordon Cole Date CITY OF RE=NION, P & R DEFT. 200 Mill Avenue South Renton, Washington 88055 A�--. Vincent lee ate z 0 rn N� M mN C: m�A �z 4 vN O� 0 i U) z O c� M MODMCATIOr4 PROPOSAL ICIItTLEY COLE O Project: RENTON SENIOR HOUSING -JOB 1315 ASSOCIATES, INC gCnam Date: July 15, 1992 eonulmrs p.o. box 1179 To: THE ORB ORGANIZATION 1002 • 10th onohomish wuh. 99190 Initiated by: {2206) 569-] 175 Modification Proposal: Provide concrete bases for "PF" bo''urd lights, not indicated on drawings: Matecial - concrete (I yard 0 50.00) Labor - 14 hours 0 28.00fhr. a $392.00 Small Tools Allowance ($392.00 X 5% - 19.60) WSST on mated alsiquipment (550.00 X 8.2%) Subtotal Overhead & Profit 0 15% Bonding a 2% Total • Reason for Modification: AcrY f f Coat: Additional: $546.2-1 Credits: $ Net: Change in Calendar Days: ONE (1) Approved Reject Recommendation: for C.O. Architect General Contractor Owner Modification proposal Incorporated Into Cl=Se Order Numbew 4 Attachments: No action will be taken regarding this item until we receive written atwwriution directing w to do w. AU contract work wiU proceed on its normaldine. PROPOSAL NO. 50.00 411.60 4.10 $465.70 569.86 S10.71 5546.27 $546.27 11 . ob I r, i u. -+as- 02. U I u I ux I rr*l.l 04be r'rb--kl i e:. w: R o ue re l 3S 4� O fz� �- -.�,VQO 133 /'F/ c" 1HIiI bW, yl cn Z 0 64C L1. r R F.T RZm%OL �t ALri—V-1992 10314 FROM THF ORB DTIANIZATIONN INC TO r r 523**9W7 P.02 MODMCATIOL14 PROPOSAL KIRTLEY COLE * project: RENTON SENIOR HOUSING -JOB X1313 ASSOCIATES, INC POW Hate: June 23, IM OMMUeo" p.o. box 1179 To: THE ORB ORGANIZATION 1004. 10tth mohoctkh wuh. "M initiated by: (200 X61-3175 Modlticadon Proporah Trio: roof sbeuhtng to allow for gutter tslatilladon., :191 Lab" - 8 boon @ 28.00lhr, - $224.00 - 235.20 0, Small Tools Allowance ($224.00 X 5% - $11.20) Su Wan - 1 hour 0 40.00/hr. 40,00 Subtotal ............................. $273.20 Ov"ead do Profit 0 1591 ... S41.28 S� � $6.33 Bo * 2% Total ...... ... $322.81 Reason for Mod lleallon: a per RFI NI50 Cotta Additional. 5322,81 I : 5-0- Not: Grad u $322.81 Change In {Calendar Dalai ONE (1) Approvad° Reocmu ndadon: for C.O. ArchhM '1 •t• +! L Ganeral Comer Owner Modiiiadon Proposal Inoorponatd into Cheage Order Numbs: Alalachwwft: No option will be taboo r+ptft d90 karn wdl ws reoelw wrlam au%arinfi n dkovdaS w to da 00 - All ocasrtet work WM Ptooeod oa iN no" so WUIC Pti0t+a9AL NO. PQA?Y-0NII t411 I� TOTAL P.02 JUI.-1G-'tW lrN 'M40f Iu.an,rrvv. awC-I -1 •. 01• - -- REQUEST FOR INFORMATION WD RENTON SENIOR HOUSING My int Raman. washinatan CURB Na 9007� wow �'�.f • Ca so !r'r�r1c �'(a>i�'' 1� +� rrr► M yyl��,rr�rw ww s.AD .w CURB Na 9007� wow �'�.f • Ca so !r'r�r1c �'(a>i�'' +� rrr► M yyl��,rr�rw ww s.AD .w . ' rtew Sa h Gni ft�f O CA Dam - AM" "Wodlem or�iMrr.■.,..,_ ��. w .� +r wrMwa� r 1++rrr +wr wrr rw+1hM MWrr.i.�r MiJ�1 � =mwmm=mmm M Nw*" w "M! Mmw M mvmu* If FAY �'"m do A my �Vt r M 9!; ca ow rnT..l c 0.1 m :I:fi ra� 0 m Z O 0 in MODIFICATION PROPOSAL KIRTLEY COLE • Project: RENTON SENIOR HOUSING - JOB 0315 ASSOCIATES, INC generaDate: July 15, 1992 cortractora p.o. hart 1179 To: THE ORB ORGANIZATION 1002 - loth snohomhh wuh. 98290 Initiated by: Architect (les) 564-3173 _ Modification Proposal: Re-route exhaust ductwork from Elevator Machine Room #163 into Unit 128 and discharge throuoh west exterior wall. Wrap ductwork with sound insulation to reduce sound transmission. .Ib* d04" - Smith Air Conditioning WSST on materials ($75.00 X 8.2% Subtotal .. Overhead & Profit ® 15 96 . • . • ` ` ' ' Bonding 0 2% .. ' ' • Total ..... Reason for hodification: as per PROPOSAL REQUEST #35 Cast; Additional: S245.33 Credits: $-0- Change In Calendar Days: -0- Approved Reject Recommendation: for C.O. Architect General Contractor Owner _. 203.00 6.15 i $209.15 S31.37 $4.81 $245.33 Net: $245.33 Modification Proposal Incorporated Into Change Order Number- Attachments: umberAttachments: Smith Air Conditioning, Inc. - propoul dated 6/15192 NO action will be taken regarding this item until we receive written authorization directing us to do so. All contract work will proceed on its normal schedule. PROPOSAL NO. N 4 JOR 1 LIEY"C©LE ASSOC1ri 1 ESS INC., )!6W 91290 1TUFAX mo "'PI 19 June 9, 1992 Lj'2 Uy�S T F o_R_ERS? L MAXM = TM last ony ,MIN +Q► SLTB/SiJPPLIER: SbJM A R C©NDMONNG, INC. 12439 Woodinville Drive WwdinviRe, WA 98M AMMON: project Esdmawc SENIOR HOUSING t. RENTON PROJECT-..� JOB NUMBER: 315 DESCRIPTION OF WORMAS PER PROPOSAL REQUEST #33, ATTA ,GRED R'1`S'POND BY: BY NO LATER '�N iVIONDA`Y, JUNE 15. 1992 i TOTAL A.tiiOGTiT -y(s) CONTR,r+►C'I"I'il1'LE REQUEST • TM3 oyWAL agnj 17 ALL OF TIM COM NVOLVta SNrWOC40 &4Y COM OF DY1 IYL DAWILACL! wHrCH �IAY OCCUR FROM D�1AY! M ► ANY Wats 91110±9 ar 1c:ca D[LAY71. A LITHO RIZ EI) IGNATUR r DATE: SIGNED.- L