HomeMy WebLinkAboutCO 20m 1-14 l U11 1 f11�.t J
CHANGE ORDER Owner
COR Form
Architect
(This fowl Is to bo executed
in triplicale and each party Is to rolaln an original.)
Contractor
Projocl Name:
RENTON SENIOR HOUSING
Dale,
August 12, 1992
Project Address:
3151 NE 161h Street
Change Order No.:
Twenty (20) Revised
Contractor Namo:
KIRTLEY-COLE ASSOCIATES
ORB Project No.:
9007
6 Address
1002.10th Street
COR Project No.:
CAG 095.91
Snohomish, Washington 98200
Contract For:
General Construction
Conlract Date:
Odot)er 31, 1991_
The Contract Is hereby amended as follows
1. per KlrtleyColu Modification proposal 059, 7115192, RFI 1078, 7113192
and Martens -Chun Field Report, 0/30192 (copies attached): 'Retrofit
an additional hooder, lintel and HDdA at Opening 035.` Add $039.00
2, per Kiriloy-Cole Modilicallon Proposal 080, 7115192 and ORD
Proposal Request 023, 4110192 (copies attached): 'Credit for
sidewalk work and partlal deletion of fence relocation at Kirkland Avenue NE.' subtract $(651,75)
3, per KlrrleyColo Modification Proposal 064, 7126192 (copy attached).
'Provide additional required structural f1tl' Add $3,636.77
TOTAL. CONS1 RUCTION COLT IMPACT OF THIS CHANGE ORDER .....................................Add $3,824,02
The Change Order shall Include all Canlractor(s) labor, material, overhead, profit, and all direct and/or Indirect costs associate
of Work
This Change Order Is not valid unless signed by the Owner Archlted, and Conlraclor.
TheOriginal Contract Sum was.......................................................................................................................!114,620,705.00
Net Change by previously aulhodxed Change Order(s) was ............................................................................ -$002,152.40
The Contract Sum prior to this Change Order was ..................................................................................... $5,722,917.46
Tho Centrad Sum will be revised by this Change Order In the amount of .... .............................. ....33,824.02
.......... .
Thn now
..........
Order will be ..... _................ .............................. $5,226,741.48
ing this Change
The Contract Time will be changed by g ..� ............................... + 1 day (fleet 1)
The Substantial Comontract pletion Date lInclud ng this Change Order Is ............ ......... ......................................... liar,uary 11, 1992
' See Change Order Nos. 12, 18 and 19 for TBD items.
NOTE: The above summary does not Include any Changes In the Contract Sum or Contract Time which have been approved
Construction Change Directive or Owner's Field Dlrecilves.
1HE ORF! ORGANIZATION, INC,
807 SW Grady Way. tulle 110
Renton, VVoshington 98055
ar a 111tem, AIA
x/")-/11
—�� Date
WO dm
KIRTLEY•COLE ASSOCIATES
1002. 10th Street
Snohomish Wash glon 98290
,r
ordon Cole
CITY OF RL-"NTON, P d R DEBT.
20D Milt Avenue South
Renton, Washington 08055�d
Vincent Lee
8/rg/9 2
DoleT'
6
a75
Ci
O
i
MODIFICATIC PROPOSAL
KIRTLE Y
COLE • Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
genera Date, July 15, 1992 3
contractors
p.o. box 1179To. THE ORB ORGANIZA
1002 - 10th
mohomish f�
wash. 98290 Initiated by:
(206) 568-1175
Modlflcation Proposal: As per Field Report dated 6130192, retrofit an additional header in Opening #39, drill and
install lintel as shown and provide HD5A as indicated:
Materials - (1) ea. 14 ft. 6 X to = $53.20
86, f t)
(13) ea. 518" lag bolts 0 .921ea. 511,96
(1) ea. HD5A hold down p 5934
(2) ea, kwik bolts = $11.60
Labor - retrofit 6 X 10 leader (6 hours Q 28.001hr) $168.00
411.60
drill and place lintel (7 hours 0 28.00mr) a $196.00
instill HD5A (1 hour 0 28.001hr) ® $28.00
Small Tools Allowance ($392.00 X 5`.r6) - $19.60
Supervision - t hour a 40.00fhr.
40'00
WSST on materlais (586.10 X 8,2%)
7.06
Subtotal ...
$544.76
i Overhead do Profit 0 15% .................................
$81.71
512.53
Bonding a 2`�+
'
Total ......... I .....................
$639.00
Reason for Modification:
Cost: Additional; $639.00 Credits
Change In Calendar Days: ONE (1)
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
Modification Prroposal Incorporated Into Change Order Number: �U
Attachments:
$-0- 1 Net: $639.00
No action will be taken rogarding this Item until we receive wrilttn authoritarion directing us to do sn.
All contract work will proceod on iu normal schedule.
PROPOSAL NO,
z
m
.
.
L
me
w
l67 5
r- REQUEST FOR INFORMATION (RFD
RENTON SENIOR HOUSING
City of Renton, Washington
ORB No, 900�7
� y'f
mine
R" WIL Or
�}
sArft "w S 3� Z
15,1 4� 1 7 , f
A 4�
D.rRli.e Noi
Ag itadd,
1AZ 4.4
r�aklrl !JI �✓
M
MOM
LTrr A ,t ��yy MMwwd �� pwls
01 MIM
Dam JwWwad 8r, t�wc
Aedo�
Am "$dud= n.is LalM� fin
. ism TWO
ye No
NCJitti 'Ilii V,we r P°�'r v4d► wvk WOWVM; mw �i! w
11 spy r.rpaw muter my dWMW
ORDW
bdi 09/19/91.5 I i4�GC�
w
fill
M t
AC-' 00 THU 21114 I D 1 BR1 MHALL 21627?9650 TEL N01 MM P03
C,-02
/��.+r+� .UW30"''si 17th - 01t9pRT'i?ds�i. INC--
i
• Kartans/cChau, Ira.
*maul": awinsers
•aatI le,
�xar.>a asso�lr
Tot The 03M Organisation Job Na. 91051
Attt DaR49 Pedersen .lob Names Renton Senior Housing
ryt Hill Chen Oetes ,Tuna 30, lora
at
0"IRT ►IM
Ce+ar Doug 1
visited the job site todayp (6/30/93) and the 90110winl are ay
observations and remandationsl
1. The nailing along the horizontal panel sdgeo for the gypsum
wall board on both sides at the US stud wall shown on section
7I83.1 are missing or incorrectly spaced. l suggest the oontraatoc
check the nailinq of all gypsue wall board for conforaity to the
nailing schs"Is an section 1/83.1.
3. The Gula header bean over the 13'-S" opening on the mouth wall
of the ctoluion area needs to be lower, or, add a new header at the
lower level, sea attached dsrtails.
.mom
.y
14
3
00 Tic 2110 1 D I BR I "-PLL 206277965-0 TEL NO:
iW i*iw -iDen*Te4,O4*i INC TEL HOO *-33-,2146
10
. 0
0
6.ts A -.A
#9M M4
mm 42
Vii' K �w«� '�' �'�
Ox
now
a.
ve I $To
WOW
w/
orb
MAX
Op6h4O4
MODIFICATIO. PROPOSAL
KIRTLEY
COLE • Project; RENTON SENIOR HOUSING -JOB A313
ASSOCIATES, INC
genera Date: July 15, 1992
oontractora
P.O. box 1179
1002 • lOth To: THE ORB ORGANIZATION, INC.
_
snohomish
wash. 96270 initiated by: Architect
(206) Sbb-3173
Modlflcution Proposal: Credit for cost changes associated with sidewalk work and partial deletion of fence
relocation at Kirkland Avenue, change 34 I.f. storm from PVC to concrete:
Delete 25 l.f, fencing - labor (4 hours 0 28.001hr.) - S-112.00
materials (25 If 0 3,0611f) = $-76.50
Delete derno and hauling of 100 sf sidewalk - per Roadrunner Excavating
Delete 25 If curb do gutter/150 sf new sidewalk - per Brookshire Concrete
(3) yds concrete (-126.75)
Delete 6" PVC, add 6" cone pipe - per A.L. Reicon, Inc.
Subtotal .. . .
Total ... , .. .. .. ...... .
Reason for Modification: as per PROPOSAL REQUEST #26
Cost: Additional: $0.001 Credits: S651.75
Change in Calendar hays: -0-
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
-188.50
-125.00
-399.25
61.00
$-651.75
S-651.75
Net: 6-651.75 II
Modincatlon Proposal incorporated Into Change Order Number: 40
Attachments: Subcontractor prtaposala
No action will be taken regarding this item until we receive written sulhorisation directing us to do so.
All contract work will proceed on its normal schedule. PROPOSAL NO. _EMI 4L
r+J
c�
R
IU R.TLEY-COLE ASSOCIATES, INC.
Ift ArPO4,0, bit 117r, 50hMi.h, WA MM
! wm (," U&I 17"AX 50.7! 10
June 23, 1992
$,RQIJES,T ,FOA PROPOSAL
SIJB/SUPPLIER: ROADRUNNER F.XCAVATING, INC,
22845 NE 8th, Suite 174
Rodmond, WA 98053
ATTENTION: ;Mike
PROJECT; RENTON SENIOR HOUSING
JOB NUMBER: • 315
DESCRIPTION OF
WORK; a1 per PROPOSAL RXQUEST N26, attached
(DELE'T'E DEMO ! HAULING OF 100 S.F. SIDEWALK)
"RESPOND BY FRIDAY, JUNE 161 1992
ITEM
NUMBER
OFACRwnoN
(DIDAKDOWN BY LABOR / MATERIALS)
HSTIMATED
QUANTITY
UNIT
UMI"
PRICE
UT}MATED
AMOUNT
n-EFqIjF WORK!
MATERIALJEQUIPMENT(DUMP FEE)
(100.00)
( 25.00)
..�L
-I
L
TOTAL AMOUNT
CONTRACT TIME REQUEST
05 (125.00)
^o DAY(S)
• =g !QOM U. NKI'W"Au CI x11K Corn WVOLV W jKLU l M ANY COM OF i1i{IAY& DAMACiit wl I1Cp MAY OCCUN nO4 MAY@ AKU
AKY aj1Y1« IvnC7{ o/ X= MAW
O
AUTHORIZED SIGNATUREI
DATE:
cclrvr,n. nrovvvr r. o-rm
KIRML Y -COLE ASSOCIATES, INC.
IW2 . I tt ftmWF-O. seg ! l70, S"b*&M, IPA "M
Them OM JW3175MAX Me ld1.7fl f
June 23, 1942
cnL"A tna Tm rotor O&Y arm. Amurm"
SUB/SUPPLIER; BRaOKSFIIRH CONCRETE r6 r ; N �= 1 n, c '�
ATTENTION: Dennis
AL a ., 1n�
PROJECT: RBNTON SENIOR HOUSING NRTLE, •COLE ASSQCIATE:
JOB MGM 315
DESCRIPnON OF
WORK; as per PROPOSAL REQUEST M, attached
(DELETE 23 L.F. CURB & GUr= / 134 S.F. NEW SIDEWALK)
RESPOND BY: FRIDAY, JUNE 26, 1942
S8M
NLOOn
DESCA,IP'i'igN
(8 MAKDOWN BY LABOR /MATMUAi.S)
MWATED
QUAN lTY
U?QT
UNrr
Fl=AMOUNT
=TPAATBD
fs o S.,4 kA/i, • 90
,'7p
/3 s. 00
GORDY
_. .. _.___.__=PERINTENDENT
cOIiN11NG
�- _- OEBEIE �
DIANE
NTS
VEST DAY(S) ..�
• TW N MOPML s MX= AM OF TM COM WvQLV= MCUMMO ANY 0► MAY%Wocu mint OCCIM IMM n um AND
ANY 11"U WP%C'i7 OWSUM SIXA .
7
AUTIIOlUZ1" S "NATUlM ,
DATFA'��
SIGNED: DEBBIE SAGER
r.
RIRTL EY -COLE ASSO MATES, INC.
IOM - lOth 5tr*00.0. BOX 1179, Snohomish. WA 99290
Phone 0-061 1 61-3 1 7 3 /FA.'(( 06} 569-7919
IF M DATE: ��17,
BY 40
DATE-6--f-f7, R L- Q Tj ES 1---F 0 R H Q P 0 S -LL
(ptrAJE
ATE.G f-7-
(PLL'AJE USI! r..{IS FORM ONLY WHLTI SUTIMMINO)
SUBISUPPLIE-R: ./ .�i_Qel 11 'A el _ N' .vim.
ATTENTION:
PROJECT:i,r,=,c% �t�,c/rte iriSrrrG
JOB NUMBER:
DESCRIPTION OF
WORK:
RESPOND BY:
DFaCRn ION
MIMATED
UNIT
UNIT
F.5iTIIIATRD
QUANTITY
PRICE
AMOUNT
yG
,D
�l
TOTAL AMOUNT q '!�;ny
CONTRACT TIME REQUEST 0 DAY(S)
T1flS MtOPOSAL RDUCiS ALL OY T716 CObTS INVOLVED INCLUDINC ANY COTM O DELA S. DA 91 1 CII htAY OCCUR MOhI nMAY9 O
,MY Rl. fLi UFXM OF SUCH OUAYS.
AUTHORIZED SIGNATURE:
DATE:3�Z
SIGNED: DE'RUTE SArzEB
n
in
F!"