HomeMy WebLinkAboutCO 21CHANGE ORDER
Owner
COR Form
Architect
(This form Is to be executed In triplicate and each party Is to retain an original,)
Contractor --
Project Name: RENTON SENIOR HOUSING Date:
September 1, 1992
Project Address: 3151 NE 10th Street Change Order No.:
21
Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.:
COR Project No.:
9007
CAG 095.91
d. Address 1002 - 10th Street
Snohomish, Washington 98290 Contract For.
General Construcilo
Contract Date:
October 31, 1991
The Contract is hereby amended as follows:
1. Per Kirtiey-Cole Modlficatlon Proposal 043132, 8125192, (copy attached): 'Relocate
$797.02
electrical panel In managers unit." Add
2. Per ORB Proposal Request #27 (partial), 0127192, and Kirtlay-Cale Modification
Proposal #49112, 8/14192, (copies attached): 'Provide area separation wall Add
$10,005.88
changes (except door, hardware and framing)."
3. Per ORB Proposal Request #45, 0125/92, and Klrtlay-Cole Modification Proposal
#5882, 7118192, (copies attached): 'Provide cantilovered blocking at gabled ends Add
$2,357.24
of common area root,"
4, Per Klrlloy-Cole McdIncatlon Proposal 074R, 8114192, (copy attached): 'Provide Add
$4,445.15 '
Installation of Insulation on attic ductwork In east and west wings."
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE O''ODER:...................................... Add $18,205.30
The Change Order shall Include all Contractors) labor, material, overhead, profit, and all dirnct and/or indirect costs assoclat
Worts.
This Change Order is not valid unless s: ned by the Owner, Architect, and Contractor.
TheOriginal. Contract Sum was ....................................................................................I.......................;......,.4,020,705.00
Not Change by previously authorized Change Orders) was......................................•....11.....11................ ... • 805,978,48
The Contract Sum prior to this Change Order was................................................. ................ ..5,220,741.48
The Contract Sum will be revised by this Change Order in the amount of 18,205.30
The now Contract Sum incorporating this Change Order will be .... ....Ot'.t ............................ $5,244,046.78
The Contract Time wi11 be changed by f """"""""""'
The Substantial Completion Date Including this Change Order Is +denui;ry29 t94►3
`See Chante Orders 012, 18 & 19 for TBD Hums.
NOTE: The above summary does not Include any changes In the Contract Sum or Contract Time which have bben approved
Construction Change Directive or Owner's Field Dfrectives,
THE ORB ORGANIZATION, INC,
807 SW Gragy Way, Suite 210
Renton, Washington 98055
1'
AW
•Cor1nl P. illiam, AIA
Date
KIRTLEY-COLE ASSOCIATES
1002 - 10th Street
Snohomish YVashington 9tj290
Garcon Cale
7 YC'
gate
CITY OF RENTON, P A R DEPT.
200 Mill Avenue South
Renton, Washington 98055
00,
Vincent Lee
E
ate
5
O
3r]
• MODIFICATM . PROPOSAL
KIRTI-EY
COLE • Project: RENTON SENIOR HOUSING -!OB +X315
ASSOCIATES, INC
Date: August 25, 1992
s
contractors
p.c. box 1179 To: THE ORB ORGANIZATION
1002 - 10th
anobomish
wash. 98290 Initiated by:
(206) 268.3179
Modification Proposal: Additional costs for moving the electrical panel in the manager's unit:
Materials/equipment - jackhammer (1 day 0 48.00)
concrete mix (3 bags ® 14.50 ® $43.50)
Labor - demo (4 hours a 28.001hr.. $112.00)
patch (2 hours a 28.00fhr. - $56.00)
mise - demo 3r rebuild end wall of closet (2 hours a 28, )4lhr m $16.00)
Small Tools Allowance ($224.00 X 5% - $11.20)
Supervision (N1C)
Rob's Electric, Inc.
WSST on materials/equipment ($110.39 X 8.2%)
Subtotal
Overhead do Profit ® 1596
Bonding a 296
Total ...............
Reason for Modincatlon:
Cost: Additional:
Change In Calendar Days: ONE (1)
Recommendation,.
Architect
General Contractor
Owner
$797.02 1 Credits:
Approved
for C.O.
161f Igo
5-0. 1 Net:
Modification Proposal Incorporated Into Change Order Number:
Attachments. Rob's Electric, Inc. - Change Order 92193
No action will be taken regarding this item undi we receive written authorization directing us to do so.
All contract work will proceed on to normal schedule.
PROPOSAL No.
91.50
235.20
343.72
9.05
$679.47
5101.92
$15.63
5797.02
$797.02
R0P'S ELECTRIC INC. TEL:206-334-7056 Aug 19-92 8:58 No.002 R.02
TRICTIMA a� Ufa CHANGE ORDER
NUM1.911
TO xirtley Cole *"8-19-92
1003 10th Street 70_KW +toc+►rwM
Snohomish, WA 98290
Revised from Co 0 2161 5 -
We hereby "m to maks the chengsfs> specillsd beaow:
Relocate panel to closet rayl near the light switch.
10' - 1% PVC • .674 per ft.
1 - 1k 45 4 $1.99 ga-
1 - 14 90 R $1.99 aa.
6 - 1% couplings • .664 ga-
1 - Pint of glue i $4.25 ea.
8 hours of labor ! $35.00 per hour
Subtotal
Pius 15% OH
Total Mount DUO
6.70
1.99
1.99
3.96
4.25
"g-1-001
298.99
$ 44.83
i
343.72
ssssssss♦s
NOTA: This Chame cider bsoomse pen Of and In oonlermanoe wilh the arlstlnp oontmat
WE AORRE hereby to maks the change(:) Specified above at this price 1> _
PREVIOUS CONTRACT AMOUNT S
AVNOIWID&OhmAEVISID CONTRACT TOTAL !
Ap,tEpp .,- The above prtaea and apeolf ballon: of pale o1 acceptance
this Chang* order era sallslaOtM and era hereby aa•
copied. All work to be performed under same leans end Signature
as @willed In original ocntrsal unless other
wl" stipulated.
MODIFICATIO1. PROPOSAL
KIRTLEY
COLE • Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
yencra
Date: August Id, 1992
contractors
p,o, box 1179 To: THE ORIS ORGANIZATION
1002 - 1 nth
Snohomish
wash. 96290 Initiated by: Architect
(1.06) 568.3175
Modiftcalion Proposal: Provide changes as outlined in Proposal Request #27:
Kirtley-Cole cost breakdown, attached
WSST on materials (52,501.00 X 8.2'x)
NOTE: HARDWARE AND DOOR CHANGES EXCLUDED, PENDING FURTHER
REVIEW Subtotal ... , . .. ..... ........ . .
Overhead & Profit 0 15% . .. .. .... .
8,836.60
205,08
59,041.68
$1,356.25
Bonding ® 2% ................. 5207.96
Total ... .. .. ....................... $10,605,89
Reason for Modification: as per PROPOSAL REQUEST #27 (EXCLUDING MURS CONSTRUCTION
COSTS)
Cost: Additional: 510,605.89 Credits: S -O- Net: $10,605.89
Chrnite in Calendar Days: SEVEN (7)
Recommendation:
Architect
General Contractor
Owner
C.O.Approved
for
RM
K 14
�+NilLM �
jFA�
Modification Proposal Incorporated Into Change Order Number: C►%
Attachments: Sttbcontmclor proposals
No action will be taken regarding this item until we receive written authorilldon directing us to do ao.
All contract work will proceed on its normal schedule,
PROPOSAL NO. FgRTY•NINE REV[SED 1511f.=
#315 RENTON SENIOR ROUSING
MODIFICATION PROPOSAL #49 REVISED (SECOND REVISION)
Kkau-Cole
1. Demo and rebuild corridor walls as required to accommodate re -design
of double doors:
Labor - demolition (36 hours a 28.00/hr.) ........ $1,008.00
framing (84 hours Q 28.00/hr.) .......... 2,352.00
Materials - (70) ca. 2 X 3 fire treated studs @ 4.501ea . 315.00
(96) If 6 X 8 header materials a 2.89/If ... 277.00
(24) ca. 2 X 4 X 8 sheets @ 2.24 ....... 54.00
2. Demo and patch concrete slab to accommodate new door location
at thresholds and plumbing clean out:
Labor - demolition (12 hours a 28.00/hr.) ........
336.00
patch slab ( 1 2 hours Q 28.00/hr.) .....
336.00
Materials - (9) bags patch compound @ 14.50/bag ...
131.00
Equipment - jackhammer (4 hours Q 28.00/hr.) .....
112.00
3. Provide a 4" X 8" support beam for 2 -hour wall through dormer:
Labor - (2) ca. Q 3 hours (6 hours 0 28.00/hr.) ....
168.00
Materials - (2) ea. ® 17.34 .................
35.00
(4) ca. hangers 0 2.65/ea. ...........
11.00
4. Additional materials for re -designed closets:
Materials - (50) ca. 2 X 4 X 8' studs @ 2.24/ea.
112.00
(198) If 2 X 4 plate @ .28/If ..........
55.00
Demo and rebuild (2) closets at East wing:
Labor - (2) ea. Q 6 hours (12 hours 0 28.00/hr.) ....
336.00
5. Provide solid blocking in 2 -hour wall at location where lower roof
intersects gable:
Labor - 2 ca. p 7 hours (14 hours Q 28.00/hr.) .... 392.00
Materials - (210) If 2 X 12 @ .76/if ............ 160.00
6. Install (2) access doors in 2 -hour wall in attic: 112.00
Labor - (2) ea. @ 2 hours (4 hours Q28.00/hr.) ... .
7. Materials for (2) dormers at 2 -hour wall;
6X6- GDF (44)If01.89/If................ 83.00
Gyp sheathing (6) sheets Q 4.00/sheet ........... 24.00
2X6(288)If0.3911f 112.00
ay.
0
9
S. Provide 1,601 I.f. fire caulking at 2 -hour walls:
Labor - 32 hours 0 28.001hr. ................
896.00
Materials - (40) tubes fire caulk @ 15.00lea. .......
600.00
Supervision - 8 hours 0 40.001hr. .............
320.00
Small Tools Allowance ($5,936.00 X 5%) ........
296.80
................*EXCLUDED
Sunrise Ply'
Labor............
I... 100.00
Materials ........ . ........
30.00
L
Labor ......I..........
- .20
Materials ...............
22
-1122
. . .00
Materials ......... I .......
512.00
Subtotal ............ $8,836.60
NEED FURTHER REVIEW FOR HARDWARE AND DOOR CHANGES
a-"
0
0
F
e; 4