Loading...
HomeMy WebLinkAboutCO 21CHANGE ORDER Owner COR Form Architect (This form Is to be executed In triplicate and each party Is to retain an original,) Contractor -- Project Name: RENTON SENIOR HOUSING Date: September 1, 1992 Project Address: 3151 NE 10th Street Change Order No.: 21 Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.: COR Project No.: 9007 CAG 095.91 d. Address 1002 - 10th Street Snohomish, Washington 98290 Contract For. General Construcilo Contract Date: October 31, 1991 The Contract is hereby amended as follows: 1. Per Kirtiey-Cole Modlficatlon Proposal 043132, 8125192, (copy attached): 'Relocate $797.02 electrical panel In managers unit." Add 2. Per ORB Proposal Request #27 (partial), 0127192, and Kirtlay-Cale Modification Proposal #49112, 8/14192, (copies attached): 'Provide area separation wall Add $10,005.88 changes (except door, hardware and framing)." 3. Per ORB Proposal Request #45, 0125/92, and Klrtlay-Cole Modification Proposal #5882, 7118192, (copies attached): 'Provide cantilovered blocking at gabled ends Add $2,357.24 of common area root," 4, Per Klrlloy-Cole McdIncatlon Proposal 074R, 8114192, (copy attached): 'Provide Add $4,445.15 ' Installation of Insulation on attic ductwork In east and west wings." TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE O''ODER:...................................... Add $18,205.30 The Change Order shall Include all Contractors) labor, material, overhead, profit, and all dirnct and/or indirect costs assoclat Worts. This Change Order is not valid unless s: ned by the Owner, Architect, and Contractor. TheOriginal. Contract Sum was ....................................................................................I.......................;......,.4,020,705.00 Not Change by previously authorized Change Orders) was......................................•....11.....11................ ... • 805,978,48 The Contract Sum prior to this Change Order was................................................. ................ ..5,220,741.48 The Contract Sum will be revised by this Change Order in the amount of 18,205.30 The now Contract Sum incorporating this Change Order will be .... ....Ot'.t ............................ $5,244,046.78 The Contract Time wi11 be changed by f """"""""""' The Substantial Completion Date Including this Change Order Is +denui;ry29 t94►3 `See Chante Orders 012, 18 & 19 for TBD Hums. NOTE: The above summary does not Include any changes In the Contract Sum or Contract Time which have bben approved Construction Change Directive or Owner's Field Dfrectives, THE ORB ORGANIZATION, INC, 807 SW Gragy Way, Suite 210 Renton, Washington 98055 1' AW •Cor1nl P. illiam, AIA Date KIRTLEY-COLE ASSOCIATES 1002 - 10th Street Snohomish YVashington 9tj290 Garcon Cale 7 YC' gate CITY OF RENTON, P A R DEPT. 200 Mill Avenue South Renton, Washington 98055 00, Vincent Lee E ate 5 O 3r] • MODIFICATM . PROPOSAL KIRTI-EY COLE • Project: RENTON SENIOR HOUSING -!OB +X315 ASSOCIATES, INC Date: August 25, 1992 s contractors p.c. box 1179 To: THE ORB ORGANIZATION 1002 - 10th anobomish wash. 98290 Initiated by: (206) 268.3179 Modification Proposal: Additional costs for moving the electrical panel in the manager's unit: Materials/equipment - jackhammer (1 day 0 48.00) concrete mix (3 bags ® 14.50 ® $43.50) Labor - demo (4 hours a 28.001hr.. $112.00) patch (2 hours a 28.00fhr. - $56.00) mise - demo 3r rebuild end wall of closet (2 hours a 28, )4lhr m $16.00) Small Tools Allowance ($224.00 X 5% - $11.20) Supervision (N1C) Rob's Electric, Inc. WSST on materials/equipment ($110.39 X 8.2%) Subtotal Overhead do Profit ® 1596 Bonding a 296 Total ............... Reason for Modincatlon: Cost: Additional: Change In Calendar Days: ONE (1) Recommendation,. Architect General Contractor Owner $797.02 1 Credits: Approved for C.O. 161f Igo 5-0. 1 Net: Modification Proposal Incorporated Into Change Order Number: Attachments. Rob's Electric, Inc. - Change Order 92193 No action will be taken regarding this item undi we receive written authorization directing us to do so. All contract work will proceed on to normal schedule. PROPOSAL No. 91.50 235.20 343.72 9.05 $679.47 5101.92 $15.63 5797.02 $797.02 R0P'S ELECTRIC INC. TEL:206-334-7056 Aug 19-92 8:58 No.002 R.02 TRICTIMA a� Ufa CHANGE ORDER NUM1.911 TO xirtley Cole *"8-19-92 1003 10th Street 70_KW +toc+►rwM Snohomish, WA 98290 Revised from Co 0 2161 5 - We hereby "m to maks the chengsfs> specillsd beaow: Relocate panel to closet rayl near the light switch. 10' - 1% PVC • .674 per ft. 1 - 1k 45 4 $1.99 ga- 1 - 14 90 R $1.99 aa. 6 - 1% couplings • .664 ga- 1 - Pint of glue i $4.25 ea. 8 hours of labor ! $35.00 per hour Subtotal Pius 15% OH Total Mount DUO 6.70 1.99 1.99 3.96 4.25 "g-1-001 298.99 $ 44.83 i 343.72 ssssssss♦s NOTA: This Chame cider bsoomse pen Of and In oonlermanoe wilh the arlstlnp oontmat WE AORRE hereby to maks the change(:) Specified above at this price 1> _ PREVIOUS CONTRACT AMOUNT S AVNOIWID&OhmAEVISID CONTRACT TOTAL ! Ap,tEpp .,- The above prtaea and apeolf ballon: of pale o1 acceptance this Chang* order era sallslaOtM and era hereby aa• copied. All work to be performed under same leans end Signature as @willed In original ocntrsal unless other wl" stipulated. MODIFICATIO1. PROPOSAL KIRTLEY COLE • Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES, INC yencra Date: August Id, 1992 contractors p,o, box 1179 To: THE ORIS ORGANIZATION 1002 - 1 nth Snohomish wash. 96290 Initiated by: Architect (1.06) 568.3175 Modiftcalion Proposal: Provide changes as outlined in Proposal Request #27: Kirtley-Cole cost breakdown, attached WSST on materials (52,501.00 X 8.2'x) NOTE: HARDWARE AND DOOR CHANGES EXCLUDED, PENDING FURTHER REVIEW Subtotal ... , . .. ..... ........ . . Overhead & Profit 0 15% . .. .. .... . 8,836.60 205,08 59,041.68 $1,356.25 Bonding ® 2% ................. 5207.96 Total ... .. .. ....................... $10,605,89 Reason for Modification: as per PROPOSAL REQUEST #27 (EXCLUDING MURS CONSTRUCTION COSTS) Cost: Additional: 510,605.89 Credits: S -O- Net: $10,605.89 Chrnite in Calendar Days: SEVEN (7) Recommendation: Architect General Contractor Owner C.O.Approved for RM K 14 �+NilLM � jFA� Modification Proposal Incorporated Into Change Order Number: C►% Attachments: Sttbcontmclor proposals No action will be taken regarding this item until we receive written authorilldon directing us to do ao. All contract work will proceed on its normal schedule, PROPOSAL NO. FgRTY•NINE REV[SED 1511f.= #315 RENTON SENIOR ROUSING MODIFICATION PROPOSAL #49 REVISED (SECOND REVISION) Kkau-Cole 1. Demo and rebuild corridor walls as required to accommodate re -design of double doors: Labor - demolition (36 hours a 28.00/hr.) ........ $1,008.00 framing (84 hours Q 28.00/hr.) .......... 2,352.00 Materials - (70) ca. 2 X 3 fire treated studs @ 4.501ea . 315.00 (96) If 6 X 8 header materials a 2.89/If ... 277.00 (24) ca. 2 X 4 X 8 sheets @ 2.24 ....... 54.00 2. Demo and patch concrete slab to accommodate new door location at thresholds and plumbing clean out: Labor - demolition (12 hours a 28.00/hr.) ........ 336.00 patch slab ( 1 2 hours Q 28.00/hr.) ..... 336.00 Materials - (9) bags patch compound @ 14.50/bag ... 131.00 Equipment - jackhammer (4 hours Q 28.00/hr.) ..... 112.00 3. Provide a 4" X 8" support beam for 2 -hour wall through dormer: Labor - (2) ca. Q 3 hours (6 hours 0 28.00/hr.) .... 168.00 Materials - (2) ea. ® 17.34 ................. 35.00 (4) ca. hangers 0 2.65/ea. ........... 11.00 4. Additional materials for re -designed closets: Materials - (50) ca. 2 X 4 X 8' studs @ 2.24/ea. 112.00 (198) If 2 X 4 plate @ .28/If .......... 55.00 Demo and rebuild (2) closets at East wing: Labor - (2) ea. Q 6 hours (12 hours 0 28.00/hr.) .... 336.00 5. Provide solid blocking in 2 -hour wall at location where lower roof intersects gable: Labor - 2 ca. p 7 hours (14 hours Q 28.00/hr.) .... 392.00 Materials - (210) If 2 X 12 @ .76/if ............ 160.00 6. Install (2) access doors in 2 -hour wall in attic: 112.00 Labor - (2) ea. @ 2 hours (4 hours Q28.00/hr.) ... . 7. Materials for (2) dormers at 2 -hour wall; 6X6- GDF (44)If01.89/If................ 83.00 Gyp sheathing (6) sheets Q 4.00/sheet ........... 24.00 2X6(288)If0.3911f 112.00 ay. 0 9 S. Provide 1,601 I.f. fire caulking at 2 -hour walls: Labor - 32 hours 0 28.001hr. ................ 896.00 Materials - (40) tubes fire caulk @ 15.00lea. ....... 600.00 Supervision - 8 hours 0 40.001hr. ............. 320.00 Small Tools Allowance ($5,936.00 X 5%) ........ 296.80 ................*EXCLUDED Sunrise Ply' Labor............ I... 100.00 Materials ........ . ........ 30.00 L Labor ......I.......... - .20 Materials ............... 22 -1122 . . .00 Materials ......... I ....... 512.00 Subtotal ............ $8,836.60 NEED FURTHER REVIEW FOR HARDWARE AND DOOR CHANGES a-" 0 0 F e; 4