HomeMy WebLinkAboutCO 22TOTAL CONSTRUCTION CAST IMPACT OF THIS CHANGE ORDER: ...................... ............... Add ;1,352.08 The Change Order shall Include all Contraclor(s) labor, material, overhead, profit, and all direct and/or Indirect costs nssociat Work This Change order Is not valid unlecs signed by the Owner. Architect, and Contractor. ............................. $4,620,705-00 The Original Contract Sum was....................................................................................624,181.78 Not Change by previously authorized Change Order(s) was.......................................,.......................................................... .5,244,946,78 The Contract Sum prior to this Change Order was ..,. ............................................... *..- .......................1,352.08 Tho Contract Sum will bri revisod by this Chango Omer In the amount of .,,........ 298.86 rating this Change Order will be .5,246,Tho naw Contract Sum incorpo ..............�'�/�`.,,_, ...,,�.The Contract Time will be changed by 3 r ✓ �...............The Substantial Completion Delo Incduding this Change Order is ..., il��tr:•T{�•f•�1� 'See Change'Orders 012, 18 & 19 for TBD Items, NOTE: The above summary does not Include any changes in the Contract Sum or Contract Time which have been approved Construction Change Directive or Owner's Field Directives, THE ORB ORGANIZATION, INC. KIRTLEY-COLE ASSOCIATES CIT MillRENTOvenue N, P & R DEPT 607 SW Grady Way, Suite 210 1002 - 10th Street Renton, Washington 96055 Snohomish, Washingtorl 98290 Renton, Washington 98055 I C p Iliam, AIA Gordon Cole Vincont Lea 21 Date Date Date O L 0 CHANGE ORDER srF� - 1992 Ower COR Farre ORB (This form is to be executed in triplicate and each party I.; to retain an original.) Architect ctor contractor Project Name: RENTON SENIOR HOUSING Date: September 1, 1992 Project Address: 3151 PIE 1 Mth Street Change Order No.: 22 Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.: COR Project No., 9007 CAG 095-91 b Address 1002 - 10th Street Snohomish, Washington 98290 Cor.,ract For. General Constnactlo Contract Date: October 31 1991 The Contract Is hereby amended as follows: J. Per Klrtley-Cole Modification Proposal 077, 8114192 (copy attached): "Add ralsed Add $1,112.86 upper case letters and braille to room signs (ADA compliance)." 2. Per Kirl,ey-Cola Mod!ficallon Proposal 075, 8114192 (copy attached): "Delete Subtract ($760.00) non -removable pin al all in -swing hinges." 3. Per Kirtley-Cale Modification proposal 078, 8114192 (copy attached): "Provide grout between plates at 2 -hour wails on 2nd and 3rd floors of both wings - per Add $692.54 R, Martin, building Inspector." 4. Per Kirtley-Cole RFI 0183, X.0/92 and Modificalion Proposal #80, 8114/92 Add 411{3(6,88 (copies attached): "Provide attic access hatch In manager's unit.' TOTAL CONSTRUCTION CAST IMPACT OF THIS CHANGE ORDER: ...................... ............... Add ;1,352.08 The Change Order shall Include all Contraclor(s) labor, material, overhead, profit, and all direct and/or Indirect costs nssociat Work This Change order Is not valid unlecs signed by the Owner. Architect, and Contractor. ............................. $4,620,705-00 The Original Contract Sum was....................................................................................624,181.78 Not Change by previously authorized Change Order(s) was.......................................,.......................................................... .5,244,946,78 The Contract Sum prior to this Change Order was ..,. ............................................... *..- .......................1,352.08 Tho Contract Sum will bri revisod by this Chango Omer In the amount of .,,........ 298.86 rating this Change Order will be .5,246,Tho naw Contract Sum incorpo ..............�'�/�`.,,_, ...,,�.The Contract Time will be changed by 3 r ✓ �...............The Substantial Completion Delo Incduding this Change Order is ..., il��tr:•T{�•f•�1� 'See Change'Orders 012, 18 & 19 for TBD Items, NOTE: The above summary does not Include any changes in the Contract Sum or Contract Time which have been approved Construction Change Directive or Owner's Field Directives, THE ORB ORGANIZATION, INC. KIRTLEY-COLE ASSOCIATES CIT MillRENTOvenue N, P & R DEPT 607 SW Grady Way, Suite 210 1002 - 10th Street Renton, Washington 96055 Snohomish, Washingtorl 98290 Renton, Washington 98055 I C p Iliam, AIA Gordon Cole Vincont Lea 21 Date Date Date O L 0 MODIFICATIO, PROPOSAL KIRTLEY COLE + Project: RENTON SENIOR MOUSING - JOB #315 ASSOCIATES, INC ,genera Date: August 14, 1992 contras.tors P.O. box 1179 1002 - 10thTo: THE ORD ORGANIZATION, INC. anohomiah wash. 99290 initiated by: Architect (206) 369-3175 I ModIncation Proposal: Add raised upper case letters and braille to room signs to comply with ADA: Messenger Slgn3 WSST on materials ($876.67 X 8.2%) Subtotal . . Overhead & Profit 0 154 . • . ..... . Bonding 0 2% ... .. Total Reason for Mod{fIcailon: Cost: Additional: $1,112.66 Credits: Change In Calendar Days: -0- Recommendation: 876.67 71.89 $948.56 S142.2a S21.82 S1,112.66 $1.112.66 II Architect II General Contractor Owner I Modification Proposal Incorporated into Change Order Number. Attachments: Messenger Signa - proposal dated 815/92 No action will be taken regarding this item until we receive wtiaea authorization directins us to do so. All contract work will proceed on its normal schrlule.PROPOSAL No . 3EVENTY-SEYEN f,771 /i IMI YIId• 4++'1 r--%Amm rl 4Y va 61 —1 --- &-- 14r ow. 1sa17UVANOOIbM"M X"WFAX 22 2804 99. -0 TOi FROMi Barbara Fonth e C le DATE= August 5 —0 1 Yi pROJSCT# Renton Senior Housing QUANTITY DESCRIPTION UNIT PRICE TOTAL Add raised upper case letters and brai le 876.87 to room signs to comply with ADA (tor all signs applicable - see shop raxings) M1 I I XPLEASS BIS ATTACHSD DRAWINGS SPECIFIC PROVISIONS ESTIMATED DRLIVERY=B,� WORKING DAYS AFTEV RECHIPT OF ORDER QUOTATIONS DO NOT INCLUDE SALES TAX OR PERMIT FEES QUOTATIONS ARE GOOD FOR 60 DAYS pprove ate P.O. ' MODIFICATIOt . PROPOSAL KIRTLEY COLE • Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES. INC genets Date: August 14, 1992 contractors P.O. box 1179 To: THE ORIS ORGANIZATION, INC. 1002 - loth Snohomish wash. 99290 Initlatcd by: (206) 568-7177 Nlodiflentlon Proposal: Delete non -removable pin at all ire -swing hinges. The only hinges that will now bo supplied with "NRP" will be doors that are reverse level or "out -swing" doors:. Henry Bacon Building Materials. Inc. Subtotal ... ..... .. .. . Total . Rmon for Modification: -760.00 II S-760.00 II S-760.00 II Cost: Additional: $0.00 Credits: $760.00 Net: S-760.00 Change in Calendar Days: -0- Approved Reject Recommendation: for C.O. Architect General Contractor Owner Modification Proposal Incorporated into Change Order Number: ZZ Attachments: Henry Sawn Building Materials, Inc. - proposal dated 7121192 No action will be taken regarding this item until we receive written authorization directing us to do so. All ewntnct %writ will proceed on its normal schedule. PROPOSAL NO. ALB -2G-100 TIDE 00 s S 1 I D s BR I hHFLL 2062779650 TEL N01 o s 0 � ., Its July 21, 1992 Kirtlev - Cola Associates FAX #: 277-9691 POGO Attn: 8re6 Rel Ngp 4 inswins hinges Per svbaittals we have deleted non-removaable pin at all inswinz hinges ith ,NRp- doorsnthatiares roverseilevelwore"M ewins"plied xdoors# will be Delete 1760.00 for this changes Regards, ["Z aetay huson W ><INTOH MRI $iATTbl MIN 111 SUN AV& $'TORI 1130 K Cawsl In* ISSAQUAH 9RM 4310 Li WA � II N NO FI�+�1s Am $ W. R�larrr WA "061 fwd. WA 98119 Xv.4 WA 1301) mom �rw WA 11006 468A mm uo%" MODIFICATIOt PROPOSAL KIitTLEY COLS • Project: RENTON SENIOR HOUS;NG - JOB #315 ASSOCIATES, INC 9&Mw Date: August 14, 1992 contractors p.o. box 1179 To: THE Ogg ORGANIZATION. INC. 1002 - loth snohomlth wash. 98240 Initiated by: (206) JW3173 Modification Proposal: Provide grout between plates at 2 -hour walls at tad and 3rd floors (both wings) as per Randy Martin, Building Inspector: Labor - 16 flours Q 28.001hr.. $08.06 470.40 Small Tools Allowance (5448.00 X 5%) - $22.40 —' Materials - S20.00/ea- floor 80.00 Sunmislon - I hour a 40.001u. 40.00 r Subtotal 5590.40 Overhead do Profit 0 15 6 588.56 $13.58 Bonding 8 296 $692.54 Tota! Reason for Modification: Cat: Additional: $692.54 Credits: S-0• Net: $692.54 Change In Calendar Days: ONE (1) Recommendation: Architect General Contractor Owner Modification Proposal Incorporated Into Change Order Number: 22 Attachments: No action will be taken regarding this item until we receive written atmorintion 44veting us to do so. All contract wort will proceed on its normal schedule. PROPOSAL NO - .W MODIFICATIOi. PROPOSAL • KIRTLEY COLE • Project: RENTON SEN'011 HOUSING - )OB #315 ASSOCIATES, INC Dam:: August 14, 1992 amen oontracwre p.o. box 1179 To: THE ORB ORGANIZATION, r.NC. 1002 - loth anohomsh wash. 41:P0 Initiated by: (206) S6a•O1'7. Modification Proposal: Provide attic access hatch in manager's unit: Frame opening - labor (I hour ftp 28,001hr.) - 528.00 install door - labor (1 hour m 2.8.00lhr.) . x28.00 Small Tools Allowance (S56.00 X 5%) . $2.80 (1) 20" X 30" fire rated access door Paint door WSST on rrrterials (S 132.00 X 8.291) _ Subtotal Overhead do Profit 0 15 % Bonding $0 296 Total................ Reasonro M ifici tion: as ,per RFI #183 Cost: Additional: $306.88 Credits: S-0- Net: Change In Calendar Days: -0- Recommendation: Architect General Contractor Owner C.O.Approved for � r t Modirication Proposal Incorporated into Change Order Number: 2 Attachments: No action will be tskon retarding thla Item ur" we receive written authorLIAtion d6vatina us to do w. Ali contract work will proceed on its normal schedule. PROPOSAL NO. 58.80 132.00 60.00 10.82 $261.62 $39.24 $6.02 $306.88 S306.88 ORB 7W V/ z v n' rn am rn ac m c� 0 O n I m mrn SF �N 0 W z