HomeMy WebLinkAboutCO 22TOTAL CONSTRUCTION CAST IMPACT OF THIS CHANGE ORDER: ......................
............... Add ;1,352.08
The Change Order shall Include all Contraclor(s) labor, material, overhead, profit, and all direct and/or Indirect costs nssociat
Work
This Change order Is not valid unlecs signed by the Owner. Architect, and Contractor.
............................. $4,620,705-00
The Original Contract Sum was....................................................................................624,181.78
Not Change by previously authorized Change Order(s) was.......................................,..........................................................
.5,244,946,78
The Contract Sum prior to this Change Order was ..,. ...............................................
*..-
.......................1,352.08
Tho Contract Sum will bri revisod by this Chango Omer In the amount of .,,........ 298.86
rating this Change Order will be .5,246,Tho naw Contract Sum incorpo ..............�'�/�`.,,_, ...,,�.The Contract Time will be changed by 3
r ✓ �...............The Substantial Completion Delo Incduding this Change Order is ..., il��tr:•T{�•f•�1�
'See Change'Orders 012, 18 & 19 for TBD Items,
NOTE: The above summary does not Include any changes in the Contract Sum or Contract Time which have been approved
Construction Change Directive or Owner's Field Directives,
THE ORB ORGANIZATION, INC. KIRTLEY-COLE ASSOCIATES CIT MillRENTOvenue N, P & R DEPT
607 SW Grady Way, Suite 210 1002 - 10th Street
Renton, Washington 96055 Snohomish, Washingtorl 98290 Renton, Washington 98055
I C p Iliam, AIA
Gordon Cole Vincont Lea
21
Date Date
Date
O
L
0
CHANGE ORDER srF� - 1992
Ower
COR Farre ORB
(This form is to be executed in triplicate and each party I.; to retain an original.)
Architect
ctor
contractor
Project Name: RENTON SENIOR HOUSING Date:
September 1, 1992
Project Address: 3151 PIE 1 Mth Street Change Order No.:
22
Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.:
COR Project No.,
9007
CAG 095-91
b Address 1002 - 10th Street
Snohomish, Washington 98290 Cor.,ract For.
General Constnactlo
Contract Date:
October 31 1991
The Contract Is hereby amended as follows:
J. Per Klrtley-Cole Modification Proposal 077, 8114192 (copy attached): "Add ralsed Add
$1,112.86
upper case letters and braille to room signs (ADA compliance)."
2. Per Kirl,ey-Cola Mod!ficallon Proposal 075, 8114192 (copy attached): "Delete Subtract
($760.00)
non -removable pin al all in -swing hinges."
3. Per Kirtley-Cale Modification proposal 078, 8114192 (copy attached): "Provide
grout between plates at 2 -hour wails on 2nd and 3rd floors of both wings - per Add
$692.54
R, Martin, building Inspector."
4. Per Kirtley-Cole RFI 0183, X.0/92 and Modificalion Proposal #80, 8114/92 Add
411{3(6,88
(copies attached): "Provide attic access hatch In manager's unit.'
TOTAL CONSTRUCTION CAST IMPACT OF THIS CHANGE ORDER: ......................
............... Add ;1,352.08
The Change Order shall Include all Contraclor(s) labor, material, overhead, profit, and all direct and/or Indirect costs nssociat
Work
This Change order Is not valid unlecs signed by the Owner. Architect, and Contractor.
............................. $4,620,705-00
The Original Contract Sum was....................................................................................624,181.78
Not Change by previously authorized Change Order(s) was.......................................,..........................................................
.5,244,946,78
The Contract Sum prior to this Change Order was ..,. ...............................................
*..-
.......................1,352.08
Tho Contract Sum will bri revisod by this Chango Omer In the amount of .,,........ 298.86
rating this Change Order will be .5,246,Tho naw Contract Sum incorpo ..............�'�/�`.,,_, ...,,�.The Contract Time will be changed by 3
r ✓ �...............The Substantial Completion Delo Incduding this Change Order is ..., il��tr:•T{�•f•�1�
'See Change'Orders 012, 18 & 19 for TBD Items,
NOTE: The above summary does not Include any changes in the Contract Sum or Contract Time which have been approved
Construction Change Directive or Owner's Field Directives,
THE ORB ORGANIZATION, INC. KIRTLEY-COLE ASSOCIATES CIT MillRENTOvenue N, P & R DEPT
607 SW Grady Way, Suite 210 1002 - 10th Street
Renton, Washington 96055 Snohomish, Washingtorl 98290 Renton, Washington 98055
I C p Iliam, AIA
Gordon Cole Vincont Lea
21
Date Date
Date
O
L
0
MODIFICATIO, PROPOSAL
KIRTLEY
COLE + Project: RENTON SENIOR MOUSING - JOB #315
ASSOCIATES, INC
,genera Date: August 14, 1992
contras.tors
P.O. box 1179
1002 - 10thTo: THE ORD ORGANIZATION, INC.
anohomiah
wash. 99290 initiated by: Architect
(206) 369-3175
I ModIncation Proposal: Add raised upper case letters and braille to room signs to comply with ADA:
Messenger Slgn3
WSST on materials ($876.67 X 8.2%)
Subtotal . .
Overhead & Profit 0 154 . • . ..... .
Bonding 0 2% ... ..
Total
Reason for Mod{fIcailon:
Cost: Additional: $1,112.66 Credits:
Change In Calendar Days: -0-
Recommendation:
876.67
71.89
$948.56
S142.2a
S21.82
S1,112.66
$1.112.66 II
Architect
II
General Contractor
Owner I
Modification Proposal Incorporated into Change Order Number.
Attachments: Messenger Signa - proposal dated 815/92
No action will be taken regarding this item until we receive wtiaea authorization directins us to do so.
All contract work will proceed on its normal schrlule.PROPOSAL No
. 3EVENTY-SEYEN f,771
/i IMI YIId• 4++'1 r--%Amm rl 4Y va 61 —1 --- &--
14r ow.
1sa17UVANOOIbM"M
X"WFAX 22 2804 99. -0
TOi FROMi Barbara Fonth
e C le DATE= August 5
—0 1 Yi
pROJSCT# Renton Senior Housing
QUANTITY DESCRIPTION UNIT PRICE TOTAL
Add raised upper case letters and brai le 876.87
to room signs to comply with ADA
(tor all signs applicable - see shop raxings)
M1
I
I
XPLEASS BIS ATTACHSD DRAWINGS
SPECIFIC PROVISIONS
ESTIMATED DRLIVERY=B,� WORKING DAYS AFTEV RECHIPT OF ORDER
QUOTATIONS DO NOT INCLUDE SALES TAX OR PERMIT FEES
QUOTATIONS ARE GOOD FOR 60 DAYS
pprove ate
P.O.
' MODIFICATIOt . PROPOSAL
KIRTLEY
COLE • Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES. INC
genets Date: August 14, 1992
contractors
P.O. box 1179 To: THE ORIS ORGANIZATION, INC.
1002 - loth
Snohomish
wash. 99290 Initlatcd by:
(206) 568-7177
Nlodiflentlon Proposal: Delete non -removable pin at all ire -swing hinges. The only hinges that will now bo
supplied with "NRP" will be doors that are reverse level or "out -swing" doors:.
Henry Bacon Building Materials. Inc.
Subtotal ... ..... .. .. .
Total .
Rmon for Modification:
-760.00 II
S-760.00 II
S-760.00 II
Cost: Additional: $0.00 Credits: $760.00 Net: S-760.00
Change in Calendar Days: -0-
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
Modification Proposal Incorporated into Change Order Number: ZZ
Attachments: Henry Sawn Building Materials, Inc. - proposal dated 7121192
No action will be taken regarding this item until we receive written authorization directing us to do so.
All ewntnct %writ will proceed on its normal schedule.
PROPOSAL NO.
ALB -2G-100 TIDE 00 s S 1 I D s BR I hHFLL 2062779650 TEL N01
o s 0 � .,
Its
July 21, 1992
Kirtlev - Cola Associates
FAX #: 277-9691
POGO
Attn: 8re6
Rel Ngp 4 inswins hinges
Per svbaittals we have deleted non-removaable pin at all
inswinz hinges
ith ,NRp-
doorsnthatiares
roverseilevelwore"M ewins"plied xdoors# will be
Delete 1760.00 for this changes
Regards,
["Z
aetay huson
W ><INTOH MRI
$iATTbl MIN
111 SUN AV&
$'TORI
1130 K Cawsl
In*
ISSAQUAH 9RM
4310 Li WA � II
N NO FI�+�1s Am $ W.
R�larrr WA "061
fwd. WA 98119
Xv.4 WA
1301) mom
�rw WA 11006
468A
mm uo%"
MODIFICATIOt PROPOSAL
KIitTLEY
COLS • Project: RENTON SENIOR HOUS;NG - JOB #315
ASSOCIATES, INC
9&Mw Date: August 14, 1992
contractors
p.o. box 1179 To: THE Ogg ORGANIZATION. INC.
1002 - loth
snohomlth
wash. 98240 Initiated by:
(206) JW3173
Modification Proposal: Provide grout between plates at 2 -hour walls at tad and 3rd floors (both wings) as per
Randy Martin, Building Inspector:
Labor - 16 flours Q 28.001hr.. $08.06 470.40
Small Tools Allowance (5448.00 X 5%) - $22.40
—'
Materials - S20.00/ea- floor 80.00
Sunmislon - I hour a 40.001u. 40.00
r Subtotal 5590.40
Overhead do Profit 0 15 6 588.56
$13.58
Bonding 8 296
$692.54
Tota!
Reason for Modification:
Cat: Additional: $692.54 Credits: S-0• Net: $692.54
Change In Calendar Days: ONE (1)
Recommendation:
Architect
General Contractor
Owner
Modification Proposal Incorporated Into Change Order Number: 22
Attachments:
No action will be taken regarding this item until we receive written atmorintion 44veting us to do so.
All contract wort will proceed on its normal schedule. PROPOSAL NO - .W
MODIFICATIOi. PROPOSAL
• KIRTLEY
COLE • Project: RENTON SEN'011 HOUSING - )OB #315
ASSOCIATES, INC
Dam:: August 14, 1992
amen
oontracwre
p.o. box 1179 To: THE ORB ORGANIZATION, r.NC.
1002 - loth
anohomsh
wash. 41:P0 Initiated by:
(206) S6a•O1'7.
Modification Proposal: Provide attic access hatch in manager's unit:
Frame opening - labor (I hour ftp 28,001hr.) - 528.00
install door - labor (1 hour m 2.8.00lhr.) . x28.00
Small Tools Allowance (S56.00 X 5%) . $2.80
(1) 20" X 30" fire rated access door
Paint door
WSST on rrrterials (S 132.00 X 8.291)
_ Subtotal
Overhead do Profit 0 15 %
Bonding $0 296
Total................
Reasonro M ifici tion: as ,per RFI #183
Cost: Additional: $306.88 Credits: S-0- Net:
Change In Calendar Days: -0-
Recommendation:
Architect
General Contractor
Owner
C.O.Approved
for
� r
t
Modirication Proposal Incorporated into Change Order Number: 2
Attachments:
No action will be tskon retarding thla Item ur" we receive written authorLIAtion d6vatina us to do w.
Ali contract work will proceed on its normal schedule. PROPOSAL NO.
58.80
132.00
60.00
10.82
$261.62
$39.24
$6.02
$306.88
S306.88
ORB 7W V/
z
v
n'
rn
am
rn
ac
m
c�
0
O n
I m
mrn
SF
�N
0
W
z