Loading...
HomeMy WebLinkAboutCO 23I,Gl„LiVL1) -; 1992 CHANGE ORDER Cwner COR Form ORB Architect (This form is to be executed In triplicate and each party is to retain an original,) Contractor Project Name: RENTON SENIOR HOUSING Date: September 1, 1992 Project Addross: 3151 NE 18th Street Change Order No.: 23 Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Pmjoct No.: COR Project No.: 9007 CAG 095.91 d Address 1002 - 10th Street Snohomish, Washington 98290 Contract For, General Constructio Contract Date: October 31 1991 The Contract is hereby amonded as follows: 1, Per ORB Proposal Request #42, 8!25/92, and Klrtley-Colo Modllicatlon Proposal #81, 8114192 (copies attached): "Provide door changes per Proposal Request Subtract C $74.75) #42 (Refile doors).' 2. Per ORB Proposal Request 048, 7121192 and Klriley-Cole Modification Proposal #82, 8/14192 (copies attached); "Lower catch basin #38 and delete (2) rockery walls south of building at emergency drive and walkway Subtract ($1,183.30) to patio." 3. Per Kirtley-Cole Modification Proposal #83, 8114/92 (copy attached): "Install Add $722.01 hand dryers In mstrooms (not Indicated on electrical drawings.' 4. Per ORB Proposal Request 052, 8113192 and Kirtley-Cole Modiflcatlon Proposal #85, 8118192 (copies attached). 'Provide screws at awning windows Add $702,41 to stop opening at 5' at corridor windows only.' TOTAL CONSTRUCTION COST IMPACT OF THIS CriANGE ORDER: .................................... - Add $180.37 The Change Order shall Include all Contraetor(s) labor, material, overhead, profit, and all direct and/or Indirect costs assoclat Work. This Chan a Order Isnot of valid unless signed b the Owner, Architect, and Contractor. n ' 54,020,785.00 ... The Original Contract Sum was ... ................................................... ...................... ............. ............................,... 025,533,88 Net Change by previously authorized Change Orders) was....................................................I"................,... Tho Contract Sum prior to this Change Order was .1.................................................................I.......,.............,.5,248,298,80 ......... A ....................................... The Contract Sum will be revised by Ibis Change Order 6n the amount of ........................ The new Contract Sum Incorporating this Change Order will be ....,.,^^�.rlt5,248,485.23 Contract Time will be changed by gG...L.• 0 days The Con �Rzl ...,..,The Substantial Completion Dato including this Change Order Is ...................: ,......'1a A ' 1Z,_19 gee Change Orders 61J. 18 b 19 for TBD Items, MOTE: The above summary does not Include any changes In the Contract Sum or Contract Time which have been approved Construction Change Directive or Owner's Field Olrectivas. THE ORB ORGANIZATION, INC. 807 SW Grady Way, Suite 210 Renton Washington 98055 of P. eWilliam, AIA 41 A/. / `" Date KIRTLEY-COLE ASSOCIATES 1002 -10th Street Snohomistl, Washington 98290 Gordon Cote rrl);V Z Date CITY OF RENTON, P b R DEPT. 200 Mill Avenue South Renton, Washington 98055 Vincent Lee _-_----24 ate 2 6 d 9 MODIFICATION. PROPOSAL KIRTLEY COLE a Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES, INC III gwet, Date: August 14, 1x192 contractors p.o. 179 torn -stout To: THE ORB ORGAF:ZATION, INC. snohomuh wash. 95290 Initiated by: (206) 586-3175 Modiflcatlon Proposal: Provide door changes as per Proposal Request #42: General Storefronts Henry Bacon Building Materials Subtotal ............................ - - Total .......... .. .. Re.Lson ror Modlilcationt as per PROPOSAL REQUEST #42 Cost: Additional: $0.00 Credits: $74.75 Change In Calendar Days: -0- Approved Recommendation: Architect General Contractor Owner Modification Proposal Incorporated Into Change Order Number: ' Attachments: -28.75 -46.00 1 S-74.75 i S-74.75 Net: S-74.75 No action wiU be tak_n resir&I this item until we receive written authorization directing us to do W. AU contract work will Proceed on its normal schedule. PROPOSAL NO. - 1 A