HomeMy WebLinkAboutCO 23I,Gl„LiVL1)
-; 1992
CHANGE ORDER
Cwner
COR Form ORB
Architect
(This form is to be executed In triplicate and each party is to retain an original,)
Contractor
Project Name: RENTON SENIOR HOUSING Date:
September 1, 1992
Project Addross: 3151 NE 18th Street Change Order No.:
23
Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Pmjoct No.:
COR Project No.:
9007
CAG 095.91
d Address 1002 - 10th Street
Snohomish, Washington 98290 Contract For,
General Constructio
Contract Date:
October 31 1991
The Contract is hereby amonded as follows:
1, Per ORB Proposal Request #42, 8!25/92, and Klrtley-Colo Modllicatlon Proposal
#81, 8114192 (copies attached): "Provide door changes per Proposal Request Subtract C $74.75)
#42 (Refile doors).'
2. Per ORB Proposal Request 048, 7121192 and Klriley-Cole Modification
Proposal #82, 8/14192 (copies attached); "Lower catch basin #38 and
delete (2) rockery walls south of building at emergency drive and walkway Subtract ($1,183.30)
to patio."
3. Per Kirtley-Cole Modification Proposal #83, 8114/92 (copy attached): "Install
Add
$722.01
hand dryers In mstrooms (not Indicated on electrical drawings.'
4. Per ORB Proposal Request 052, 8113192 and Kirtley-Cole Modiflcatlon
Proposal #85, 8118192 (copies attached). 'Provide screws at awning windows Add
$702,41
to stop opening at 5' at corridor windows only.'
TOTAL CONSTRUCTION COST IMPACT OF THIS CriANGE ORDER: .................................... - Add
$180.37
The Change Order shall Include all Contraetor(s) labor, material, overhead, profit, and all direct and/or Indirect costs assoclat
Work.
This Chan a Order Isnot of valid unless signed b the Owner, Architect, and Contractor.
n '
54,020,785.00
...
The Original Contract Sum was ... ................................................... ......................
.............
............................,... 025,533,88
Net Change by previously authorized Change Orders) was....................................................I"................,...
Tho Contract Sum prior to this Change Order was .1.................................................................I.......,.............,.5,248,298,80
......... A ....................................... The Contract Sum will be revised by Ibis Change Order 6n the amount of ........................
The new Contract Sum Incorporating this Change Order will be ....,.,^^�.rlt5,248,485.23
Contract Time will be changed by gG...L.• 0 days
The Con �Rzl
...,..,The Substantial Completion Dato including this Change Order Is ...................: ,......'1a A ' 1Z,_19
gee Change Orders 61J. 18 b 19 for TBD Items,
MOTE: The above summary does not Include any changes In the Contract Sum or Contract Time which have been approved
Construction Change Directive or Owner's Field Olrectivas.
THE ORB ORGANIZATION, INC.
807 SW Grady Way, Suite 210
Renton Washington 98055
of P. eWilliam, AIA
41 A/. / `"
Date
KIRTLEY-COLE ASSOCIATES
1002 -10th Street
Snohomistl, Washington 98290
Gordon Cote
rrl);V Z
Date
CITY OF RENTON, P b R DEPT.
200 Mill Avenue South
Renton, Washington 98055
Vincent Lee
_-_----24 ate 2
6
d
9
MODIFICATION. PROPOSAL
KIRTLEY
COLE a Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
III gwet, Date: August 14, 1x192
contractors
p.o. 179
torn -stout To: THE ORB ORGAF:ZATION, INC.
snohomuh
wash. 95290 Initiated by:
(206) 586-3175
Modiflcatlon Proposal: Provide door changes as per Proposal Request #42:
General Storefronts
Henry Bacon Building Materials
Subtotal ............................ -
-
Total .......... .. ..
Re.Lson ror Modlilcationt as per PROPOSAL REQUEST #42
Cost: Additional: $0.00 Credits: $74.75
Change In Calendar Days: -0-
Approved
Recommendation:
Architect
General Contractor
Owner
Modification Proposal Incorporated Into Change Order Number: '
Attachments:
-28.75
-46.00
1
S-74.75
i
S-74.75
Net: S-74.75
No action wiU be tak_n resir&I this item until we receive written authorization directing us to do W.
AU contract work will Proceed on its normal schedule. PROPOSAL NO. -
1
A