HomeMy WebLinkAboutCO 25CHANGE ORDER Owner Architect COR Form (This form is to be executed in triplicate and each party is to retain an original.) Contractor Project Name: RENTON SENIOR HOUSING Date: Change Order No.: October 5, 1992 25 Project Addrrss: 3151 NE 16th Stree! Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.: COR Project No.: 9007 GAG 095.91 8 Address 1002 - 10th Street Snohomish, Washington 98290 Contract For: General Construction Contract Date: October 31. 1991 The Contract is hereby amended as follows: 1. Per ORB Proposal Request #14, dated 3130192, and Kirtley-Cole Modification Proposal #14R, 416192 (copies attached): 'Replace 3' double detector check Add $4,00327 valve assembly with 4' assembly.' 2. Per Kirtley-Cole Modification Proposal #70, dated 8!4192 (copy attached)- Add 5893.99 'Additicrial costs for sanitary sewer delays." CTO RECHECK SALES T_ 3. Per Kirtley-Cole Modification Proposal 071, dated 8!4192^ (copy attached): Add 51.787.97 'Additional costs ref, hidden conditions.' K -C TO RE -CHECK SALES TAX 4. Per Kirtley•Cole Modification Proposal #72.8!4192 (copy attached): 'Additional' Cost resulting from sequencing of water utility system, due to late UtilityAdd -C TO RE -CHECK SALES TAX S4,036.82 Permit issuance." S. Per Kirtley-Cole Modification Proposal #84, 8118192 (copy attached): 'Fury down 1A; add blocking and build soffil pipe chase.' Add $1,004 84 ceilings - room 155 and corridor i TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: ..................... ... ......... Add $11,726.89 I ^ The Change Order shall include all Contractor(s) labor, material, overhead, profit, and all direct andlor indirect costs associated with the Change in Scope of Work. This Change Order is not valid unless signed by the Owner. Architect, and Contractor. $4,620,765.00 The Original Contract Sum was................................................................................................................... . .....631,700.90 Net Change by previously authorized Change Order(s) was ............................................................................ prior to this Change Order was ................................................5:252,465.90 The Contract Sum g •••••••••'•'••' ............................... In the of .11,726.89 The Contract Sum will be revised by this Change Order amount .................................................. 264,152.79 The new Contract Sum Incorporating this Change Order will be.....................................................I......... .5 •••••••• � � The Contract Time will be changed by ......................................... SEE BELOW ........................................+ 6 days 20, 1993 The Substantial Completion Date including this Change Order is ............................................. ................January Change Orders 012, 18 619 for TBD items.) (See does not include any changes in the Contract Sum or Contract Time which have been approved NOTE: The above summary by ORB Form 301 - Construction Change Directive or Owner's Field Directives. R DEPT THE ORB ORGANIZATION, INC. 607 SW Grady Way, Suite 210 Renton. Washq ton 98055 ! P* DeWilliam, ACA Date KIRTLEY-COLE ASSOCIATES 1002 - 101h Street Snohomish, Washington 98290 CITY OF RENTON. P 8 200 Mill Avenue South Renton, Washington 98055 Vincent Lee i�Date io ✓? -*NOTE: Acceptance of the additional days on this Change Order is conditional pendingreceiptof K.C. critical path method i schedule review.. 'i r+C- z O 1 0 m z� Orn mQ --46 0C: m7 C) -i Cz r� rn n Mm b to 0 Fn CZ c rn N r? x z 0 0 m NIODIFICATIOt PROPOSAL KIR TLEY COLE • Project: RENTON SENIOR HOUSING - JOS x315 ASSOCIATES, INC generaDate: April 6, 1992 contractors p.o. box Il 1002 - 10th To: THE ORS ORGANIZATION snohornish wash. 98290 Initiated by: Architect (206) 568.3175 Modification Proposal: Replace '3' double detector check assembly with 4' assembly: A.L. Reicon, Inc. WSST ® 8.2% of materials ($2,766.03) Subtotal f Overhead & Profit 0 15% .... .... ...... ..... . Bonding ® 2% ...... .. .. .... . Total ...................... Reason for Modification: as per PROPOSAL REQUEST #14 Cost: Additional: S4,003.27 L Credits: S-0. Net: Change in Calendar Days: FIVE (5) FROM DATE OF ACCEPTANCE Recommendation: Architect General Contractor Owner 3,186.03 226.81 $3,412.84 S511.93 S78.50 $4,003.27 54,003.27 Modification Proposal Incorporated Into Change Order Ntunher: G7 Attachments: A.L. Reicon, Inc. revised proposal dated 4/3192 No action will be taken regarding this item until we receive written authorization directing us to do so. All contract work will proceed on its normsl schedule. PROPOSAL NO. RTEEt! REVULDIUML MS — n m I NLEY-COLE ASSOCIATES, INC. 1008 - Ift Su*N O Sox 1171. Uohom", WA 9t"I Phom M%) MW 1'73 DATE: FAXMITTAL h C206) 277 -Ml FAX TO: P, L. ATTN: Va _ FROM: FA"- ! 4q - S / 35 RF: PAGES: ^, i (Inducting Covert Sheet) If you do not receive all pages please call (206) 277-900. I COMMENTS: i1L 4 C��tr�. Ad --d L'�.�f4�'!dr..,' ? f+=-� be UAB -Pb d `.at dro `,.1-c Coir• L P Inter - JfYES N© Reply Expected - NO z 0 0 m :45i N Gm m§ 0 m ro 0 cz 0 m �m CG K8 O N z O 9 m VIZATM5823 238TH S.E., WOODINVILLE, WA o6072 MAW FAX NO.: (tae) 468-0281 Vila fumrmmyc corwx sir" 1!17 TELECOMMUNICATION COVER SHEET DATE: TO: �- 1 r 41 j) FAX OPERATOR: THE FOLLOWING DOCUMEW INCLUDING THIS COVER SHEET IS. _ _ PAGES. MESSAGE OF ANY): kemurn-0 rr],c -_ )azj�L...._ ._ ._.. _ �.�., _•__ _. �_�.... e.)l.Y`...r...._.. IF ANY OF THESE^PAGES ARE NOT LEGIBLE, OR YOU DO NOT RECEIVE ALL PAGES AS INDICATED ABOVE. PLEASE CALL THE TELECOMMUNICATION OPERATOR AT THE PHONE NUMBER SHOWN BELOW. (206) 483.2724 OR TOLL FREE IN WASHINGTON 1 (800) 422.3081 bELUNGi•" SEATTLE TACOAAA 8016E LAKE OSWEGO PASCO VAMC WER PHONE r (201) 771.1210 (208) Z*4400 MM 363.4W (" 325-0M (50 8240123 ON) 547.2+110 (20!!x ""155 FAX I (20M 734.47t2 (208) 882.1811 Com) 2724367 42011 375.0834 15001 681.7213 !3001 547.231!7 (206) 238-5r5 z O m Fn cm mo 0 0 zm m D _ cz r� m m v in O o FnM zr z N z O n t EIRTLE Y -COLE ASSOCLATES, INC. 1003 - 101b St wjp.O. Rax 1179, Saabomiab, WA 91.90 pbom (206) 56l-71731FAX (2106)36>1-7919 DATE: REQJIEST FOR- PR-OPQSA T [�TT�TfT (tl VASE IISC THIS MKM ONLY NYITSI sunurrTNG7 ♦ p S lJBIS 4J i- PL MR: LGT,C, � 2 L //_7—. i PROJECT: - JOB NUMBER: e DESCRIPTION OF - WORK: ��E �'` f�d7i�SCc� ��iZK"�% C.(�' ,SSS c/• Gi< RESPOND BY: TOTAL AMOUNT CO1rMU T TIME REQUEST �? DAY(S) T'ILIS MOlOSAL 0.M.EI.-7'S ALL OFTILL C45TS INYd'.YED INCLUDING ANY COSTS d FLAYS -0 1YIDCII b1AY dCCVA MOM DlaAYS AJ4t oy xtrrtZ c>FlMM Or SiJCII DELAYS. AVlia0R.i.LED SIGNATURE: DATE' . SIGNED: UMC SAGER z O m om m© -40 0-�C rnpid ca 0 -I m 0 `" o 0 z 0 d 0 m 04,-03/92 12.03 FAX 7948935 A.lr REICON Z RTLEI -COLE ASSOCIATES, LNC. 100_ • loth S;rrn/P.O. Be& 11-19, Sppham4h. WA 91290 rhonc (_06) 3(1.3175/Fkx {1-06) s6s-"19 DATE:'If F2 REQUEST FOR -PROPOSAL_ aj.rAsC triC nim PoRm ONLY -14L4 surmr rimc) SUB/SUPPLTER: � �2�1'�c .� rrrtr�it ,41- Q rfL =7Z ATTENTION: r7�srF TlEru -- PROJECT: JOB NUMBER: DESCRIPTION OF WORK: RESPOND BY: Z, Oil �74/5'SO' 389< 6z0.Q0 2770.4 1� ,$-7 R TOTAL AMOUNT CONTRACT TIME REQU ST 1 7 DAY(S) I Jill$ 11101'05AL Rn-1,IX- SALLOV1111: CO i lS INv0LvVv INC lArDING ANY COM OF wittCtl mAY ocam ni(.*t ncLxvs.LW My ulrrla: M- TL" OF !;VC11 rr..l.AY9. AUTHORIZED SIGNATURE; DATE: SIGNED: 17F-. S A C. r R _+ -n vm m m8 0C mm DZ C� �ca 0 -n mrn aFA Fn r.N coz 0 d 0 m .ESMATED QUANTITY r i' r Z, Oil �74/5'SO' 389< 6z0.Q0 2770.4 1� ,$-7 R TOTAL AMOUNT CONTRACT TIME REQU ST 1 7 DAY(S) I Jill$ 11101'05AL Rn-1,IX- SALLOV1111: CO i lS INv0LvVv INC lArDING ANY COM OF wittCtl mAY ocam ni(.*t ncLxvs.LW My ulrrla: M- TL" OF !;VC11 rr..l.AY9. AUTHORIZED SIGNATURE; DATE: SIGNED: 17F-. S A C. r R _+ -n vm m m8 0C mm DZ C� �ca 0 -n mrn aFA Fn r.N coz 0 d 0 m MAR -30-1992 14:56 FROM T►C ORB ORGANIZATION INC TO 2755239007 8.03/88 KIRTL.EY MODIFICATION PROPOSAL COLE 0 ASSOCIATES PROJECT; DATE:ccricrectom p.mbox 0= TO:—e099 Z " wowl% 282@0- � 1�1 �-3'17713 MODIFICATION PROPOSAL A1,6 Wj 3r' Am,& REASON FOR MCDIRCAnc +t 4044Z�r� 0* 40 SV7 42:;4 7tv ��' pi(/��c�► sort I �'� cost: ADDMO04At��- CHAND£ IN CALF . ' R DAYS _ RECOURIMAT10#9 AMmvvd for C.O. ROOM ARCHITECT GENERAL CONTRACTOR OVINER MODIFICATION PROPOSAL INCORPORATED INTO CHANGE ORDER NUMBER_.—._ ATTAC##M E NTS: NO action win be =ken rep ronp Chia item until we M"M writW 2uttwdzu0on dkocting us 10 do 30. AE contract wotic'A p meed on b nixm23 tcRadulb. FAOPOSAL NO. � z O d 0 rn q =n Fn� c "' rn0 -i n �r. MT 0-4 O -n c7 6 cco M x v rn MEMORANDUM TO: GREG BR nUMU FROM: DALE REINER RE: RENTON SENIOR HOUSING C-Ct,nr3rn� - U SEP n 51992 KIRTLEY-COLE ASSOCIATES 4 SUBJECT: PRICE TO DELETE 3" DOUBLE DECTOR CHECK ASSUBLY AND REPLACE WITH 4" ASSEMBLY The owner's problem with this change order is the pricing structure they are comparing. I have submitted two separate prices$ 1. per bid prices (Based on the estimates used to win the contract) 2. per actual prices (Based on prices negotiated with the supplier when purchasing the materials, taking other jobs and projects into account) The Owner wants to use the high, "bid pricing" for their credit and the lower, "actual pricing" for the addition to the contract. This is in error. our Change order Request 01135-3 dated March 27, 1992, was based on "bid pricing" and resulted in an increase of $3,667.88 (this was rejected by owner) our second Change order Request for this Item, /1135-8, dated Juin* 4, 1991, was based on "actual pricing" and the resulting increase bscas $3,186.03 The current proposal the Owner has made per Memo dated August 14, 1992, (Copy Attached) is a Hybrid price showing an increase to A.L. Reicon, Inc. of only $2,157.47. This is unacceptable to us. EMMA1OR McHrMCT ACMWMNG DWIE DUNE rl FAX 18 COM A.O,BDx 936 MaNRGrEMENDSWa, 96278 < 1 -1 re 9