HomeMy WebLinkAboutCO 26CHANGE ORDER Owner COR Ford! Architect (This form is to be executed in triplicate and each party is to retain an original.) Contractor Project Name: RENTON SENIOR HOUSING Date: Change Order No.: October 5, 1992 Twenty -Six (26) Project Address: 3151 NE 16th Street Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.: COR Project No.: 9007 CAG 095-91 3 Address 1002 - 10th Street Snohomish, Washington 98290 Contract For. General Construction Contract Date: October 31, 1991 The Contract is hereby amended as follows: 1. Per Kinley-Cole Modification Proposal 987, 911192 (ropy attached): 'Remove Add $126.22 tree near comer of Kirkland Avenue N.E. and N.E. 18th Street.' 2, Per COR Proposal Request 053, 8114192, and Kirtley-Cole Modification Proposal 088, 913!92 (copies attached): 'Provide additional control joints at Add $4,883.32 Brick Veneer.' 3. Per Kirtley-Cole Modification F posal 089, 918!92, anti RFI #203, 8121/92 413.83 (copies attached): 'Relocate door frames at stairwell to clear sprinkler valves.' Add 4. Per Kirtley-Cole Modification Proposal 091, 9/8192 (copy attached): 'Provide Add $844.8$ flashing which was not detailed on drawings.' TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER:_ ........................... ....... Add $6.068.95 The Change Order shall include all Contractor(s) labor, material, overhead, profit, and all direct andlor indirect costs associated with the Change in Scope of Work. This Change Order is not valid unless signed by the Owner. Architect, and Contractor. The Original Contract Sum was........................................$4.620,765.00 previously authorized Change Order(s) was ... ............... ..... .... .....•......................................643.427.79 Net Change by prey .................................. The Contract Sum prior to this Change Order was..............................................................................................5,264,192.796.068.95 The Contract Sum will be revised by this Change Osier in the amount of................................................................ The new Contract Sum incorporating this Change Osier will be ...... 5.270.261.74 ........ .... .. ................. . .... ........... ........... The Contract Time will be changed by ............................................. SEE > t3ELOW..............I..................... ry 2 , days The Substanlial Completion Dale including this Change Order is .... January 21, 1993 (See Change Orders 912. 18 b 19 for TBD items.) NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by ORB Form 301 - Construction Change Directive or Owners Field Dirrctives. THE ORB ORGANIZATION, INC 607 SW Grady Way, Suite 210 Renton, Washington 98055 f.; DeWilliam, AIA Date KIRTLEY-COLE ASSOCIATES 1002 - 10th Street Snohomish, Washington 98290 OP '!' s 1. r� CITY OF REN I ON, P c. R DEPT. 200 Mill Avenue South Renton, Washington 98055 Vincent Lee 3 NOTE: Acceptance of the #dditional days on this Change Order is conditional pending receipt of K.C.'s critical path method ., schedule review. 0 R1 47, 01 cm Ma -i OC �c mm O� �C, O -n "m OF C rn �O z O J 0 rn MODIFICATM j?ROPOSAL KIRTLEY COLE 0 Project: RENTON SENIOR HOUSING - JOB1315 ASSOCIATE -F, INC 9-4M Date: September 1, IM conmmn p.o. box 1179 To- THE ORB ORGANIZATION, INC. 1002 - IOLh %whwnM Wuh. "M Initiated by: (M) 351-3175 h4odiflegition Proposal: Remove tree near comer of 16th and Kirkland per OwntTs Direction: Johns Backhoe Service (2)hr% 0 $50-00thf WSST an materials/equipment (100.00 x 8.2%) Subtotal ......................... * * ' * Overhead & Profit 0 15% ................................ Bonding a 2% ... . .................................. Total........................ pteason, for Modiricntion: Cost: Additional: S12b.92 Credits: S -0 - Change In Calendar Day3,. -0- Approved Rej" ReWmmenftti0n: for C.O. Architect Gen" Contractor Owner 00. $100'00'W 8.20 5108.20 108.20 $16.23 $2.49 S126.92 Net: S126.92 MO(Hfkation proposal Incw"rated into Chante Or Ntffnbwer. 2A Attachments: No &ctkm wH be tlkcn mgmding this jLcM untilwecc6, wrkm &Wwdz� dkoctins us to do 50- All contra work will preewd 04 its normal V-Wul*. PROPOSAL NO. -Eh