HomeMy WebLinkAboutCO 27CHANGE ORDER
Owner
COR Form
(This form is to be executed in triplicate and each party is to retain an original.)
Architect
Contractor
Project Name: RENTON SENIOR HOUSING Date:
Change Order No.:
October 5, 1992
Twenty -Seven (27)
Project Address: 3151 NE 18th Street
Contractor Project No.:
Name: KIRTI.EY-COLE ASSOCIATES j
COR Project No.:
9007or
CAG 095-91
d Address 1002 - 10th Street
Snohomish, Washington 98290 Contract For:
General Construction
Contract Late:
October 31, 1991
The Contract is hereby amended as follows:
1. Per Kirtley-Cale Modification Proposal 992, 918192 (copy attached): Add
$956.59
"Provide 4" crushed gravel under curb and gutter.'
2. Per COR Proposal Request #54, 8125192, and Kirtley-Cole Modification
994, 918192 (copies attached): 'Change door opening #45 per PR #54.' Add
$1,219 14
Proposal
3. Per Kidley-Cole Modification Proposal #95, 9115192 (copy attached): Add
586.27
`Retocate fresh air vents at 3rd floor, east vnng, to clear lintel.'
4. Per Kirtley-Cole Modification Proposal 998. 8/24192 (copies attached):
`Furnish and install a 20 amp 4 wire 20 i r711bf'(i) in—Abinet Add
'tt
52,922 fl9
unit heater locations'
OCT 0 9 1992
NRTLEY • COLE
� A
{
i ! p TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: ................. ........... ....... .Add
$5.384.09
The Change Orde shall include all Contrador(s) labor, material, overhead, profit, and all direct and/or indirect costs associated
with the Change in Scope of Work.
This Change Order is not valid unless signed by the Owner. Architect, and Contractor.
al Contract Sum was....................................................54,620,765.40
TheOrigin..................................................................
Net Change by previously authorized Change Order(s) was............................................................................
....849,496.7a
5,270,261.74
The Conlract Sum prior to this Change Order was..............................................................................................
5,384.09
Order in the amount of .......................................................
The Contract Sum will be revised by this Change Or ........,
. ..................
The new Contract Sum incorporating this Change Order will be..............................................5,275,645.83
SEE * BELOW .........................................+
2 days
The Contract Time will be changed by ....................................................
Order is
January 23, 1993
The Substantial Completion Date including this Change .... ...............................................
rSee Change Orders 012, 18 & 19 for
TBD items.)
NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which
have been approved
by ORB Form 301 - Construction Change Directive or Owner's Field Directives.
EPT
THE ORB ORGANIZATION, INC.
607 SW Grady Way, Suite 210
Renton,l Ashington 98055
P. a illiam, AIA
Date
KIRTLEY-COLE ASSOCIATES
1002 - 10th Street
Snohomish, Washington 98290
lu_t5-9Z
Date
CITY OF RENTON, P ch R D
200 Mill Avenue South
Renton, Washington 98055
L
Vincent Lee
/cZ�2 z
T Date(
*NOTE: Acceptance of the aWilional days on this Change Order is conditional pending receipt of K.C.'s critical path method
schedule review. fr< ��/�'� f•G l4,/ '�% �'r•� v .. ,"`!�+
1.
-4-n
rn
Cm
m0
-40
On
m
M
to
nz
1Z
�v
4�
mm
dN
[007 Fn
0
O
h
M
MOIDIFICATIOI. PROPOSAL
KIRTLEY
COLE • Project: RENTON SENIOR HOUSING - JOB 1315
ASSOCIATES, INC
tener Date: September 8, 1992
contractor
pm. box 1179 To: THE ORB ORGANIZATION, INC.
1002 , 10th
siwhomuh
Wash. 99290 Initiated by:
(206) 569-3175
Modification Proposal: Provide 4' crushed gravel under curb & gutter. As required by STeve Pinkham. Public
Work inspector.
=1 1%
$330.13
97'.50
352.80
35.07
$815.50
S122.33
ae
S 18.76
$956.59
5956.59 1�
ao
m
9
MATERIALS:
EQUIPMENT:
Bobcat Loader 21brs 0 535.001hr = $70.00
Compactor = $27.50
LABOR: 121hrs 0 S28-00/hr - SS336.00
Small Tools Allowance ($336.00 x 5%) = S16.80
W.S.S.T. on Materials/Equipment (5427.63 x 9.2%)
Subtotal ...... .. .. ... .
Overhead do Profit 0 15% .. ... , .... • . .
Bonding ® 2% .... ... .. . .
Total.................. .. ...
React ror Modification:
Cost: Additional:
Change in Calendar Days: -0-
Recontmendadon:
Architect4�'
General Contractor
Owner
S956.59I Credits:
Approved Reject
for C.O.
S.o- 1 Net:
Modification proposal Incorporated Into Change Order Number: 27
Attadunents: as per Stott way Concrete invoice 194521. dated 8112192.
No action will be taken reprdinr this ium nttuil we recsi" wrimm smM cation ditsding w to do w.
AU contract work wiU proceed on its normal schedule. PROPOSAL NO. i
I `
!
-T" I,
ST NEWAY INVOICE
AC>vO(0MNG 762-2566
SAND a GRAVEL 226-14W
1915 MAPLE VALLEY HIGHWAY • RENTON. WA 98055 TOLL-FREE SEAT tLE 623.1414
C -f7 FAX (246)763-178
SCLD
TC DELIVERED TO-
SCLD TC EY -COLE ASSOC 3151 R. E. 16TH STREET - RENTON
KIRp. O. BOK 1179
SHOHO"IS}ll VA 98290 PROJECT AGG DEL
,+vc CE yq ;•.17E l
ACCOUNT NC
481611 12 41521 QN8 12 92
630365 TOP COARSE-DELV-SOLI) 26.41 12.50 MN 330.13
i
i
DELIVERED ON TICKET NUMBERS:
735381 735386
NET 3016
Reml1 To STONEWAY CONCWM WQ ~•` �
9125 10th A e" SmAh
Searle. WA 9810H
TAXABLE
I
y
� G 2 0 19 92
1
Mi' ICOLE ASSOCIATES
1
5330. 13 SALES AA 827.08
0357.21
2
d
m
-1 it
W -4
vm
TC1
-a8
Oc:
O_
O i
Am
0 60
0 Fn
CN
0
En
Z
a
0
m
MODIFICATION PROPOSAL
K,IRTLEY
COLE • Project: RENTON SENIOR HOUSING -JOB 1315 -
ASSOCIAM, INC
tavef Date: September 8, 1992
contractors
p.a. ba: 11 79
1002 -lotth To: THE ORB ORGANIZATION, INC.
anohomish
wuh' 98290 Initiated by: ARCHITECT
(206) 568-3175
Modification Prod: Change door opening 145 as per PR 154:
Henry Baron Building Materials - Matwials ($492.00)
$532.00
Labor ($40.00)
Labor - 5 hours 0 28.00lhr. = $140.00
147.00
Small Tools Allowance (S140.00 X5%),-- $7.00
320.00
Supervision - 8 hours 0 40.001hr.
WSST on materials (S492.00 X 8.2%)
40.34
Subtotal . , .... .. ..
S1,039.34
$155.90
Overhead do Profit a 15% ................................
296 S23.90
Bonding 0 .... .... .
Total ... .... ...... $1,219.14
Reason for Modification:
Cost: Additional: $1,219.14 Credits: S-0- Net: 51,219.14
Change in Calendar Days: TWO (2)
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner —W -
Modification Proposal Incorporated Into Change Ordkr Nurnber. 27
Attae Wb: as per requm from Henry Barna dated 8128192.
No axion will be taken reprdin= this item until we receive wrist o authotintion directing w to do +o.
All eonuld work will proceed on iu normal schedule. PROPOSAL NO, N
qoT BY
3- 4-32 :12.43F"i
K I R'TM COLE
KIItTLEY-COLE ASSOCIA.TES9 INC.
100] • 101h $U.ctlr.o. ftx 1179. soubmisk, WA 9#290
pho m C2156i.3175MAX (2061561-7919
August 28, 1992
O%RA ► usn TM roti+ omy wHm sosxrnm
SUBISUI'PLIER: IESKRY BACON BUILDING MATERIAM, INC.
P.O. Box 109
ILuquah, WA 9W27
AT'T'ENTION: Bey
PROJECT; PENTON SENIOR HOUSING
1013 NUMBER: 30
DESCRIMON OF
WORK: as per PROPOSAL REQUEST 134, itt2ched
RESPOND $Y: 'TUESDAY, SEPTEMBER 1, 1992
RCCEM-W
AUG 31IV
TOTAL AMOUNT
CONTRACT TIME REQUEST
s's v
DAY(S)
:. 2I
• V= moroUL lZsn.1M ALL orT[nc com rnvoLV= IXC LVMQ AKy - of lsUAYl. DAKAM ro MM 4'AV 'Yl A?M
AMT UMS E11 it.'Yy of /vcs DVAYl .
AUTHORIZED SIGNATURE:
DATE:
z
0
0
m
-4-n
Fn�
cm
rn
0
iC
mm
wv _
�z
�CA
0 -n
n
mm
0a
)F
C ur
irs