Loading...
HomeMy WebLinkAboutCO 27CHANGE ORDER Owner COR Form (This form is to be executed in triplicate and each party is to retain an original.) Architect Contractor Project Name: RENTON SENIOR HOUSING Date: Change Order No.: October 5, 1992 Twenty -Seven (27) Project Address: 3151 NE 18th Street Contractor Project No.: Name: KIRTI.EY-COLE ASSOCIATES j COR Project No.: 9007or CAG 095-91 d Address 1002 - 10th Street Snohomish, Washington 98290 Contract For: General Construction Contract Late: October 31, 1991 The Contract is hereby amended as follows: 1. Per Kirtley-Cale Modification Proposal 992, 918192 (copy attached): Add $956.59 "Provide 4" crushed gravel under curb and gutter.' 2. Per COR Proposal Request #54, 8125192, and Kirtley-Cole Modification 994, 918192 (copies attached): 'Change door opening #45 per PR #54.' Add $1,219 14 Proposal 3. Per Kidley-Cole Modification Proposal #95, 9115192 (copy attached): Add 586.27 `Retocate fresh air vents at 3rd floor, east vnng, to clear lintel.' 4. Per Kirtley-Cole Modification Proposal 998. 8/24192 (copies attached): `Furnish and install a 20 amp 4 wire 20 i r711bf'(i) in—Abinet Add 'tt 52,922 fl9 unit heater locations' OCT 0 9 1992 NRTLEY • COLE � A { i ! p TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: ................. ........... ....... .Add $5.384.09 The Change Orde shall include all Contrador(s) labor, material, overhead, profit, and all direct and/or indirect costs associated with the Change in Scope of Work. This Change Order is not valid unless signed by the Owner. Architect, and Contractor. al Contract Sum was....................................................54,620,765.40 TheOrigin.................................................................. Net Change by previously authorized Change Order(s) was............................................................................ ....849,496.7a 5,270,261.74 The Conlract Sum prior to this Change Order was.............................................................................................. 5,384.09 Order in the amount of ....................................................... The Contract Sum will be revised by this Change Or ........, . .................. The new Contract Sum incorporating this Change Order will be..............................................5,275,645.83 SEE * BELOW .........................................+ 2 days The Contract Time will be changed by .................................................... Order is January 23, 1993 The Substantial Completion Date including this Change .... ............................................... rSee Change Orders 012, 18 & 19 for TBD items.) NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by ORB Form 301 - Construction Change Directive or Owner's Field Directives. EPT THE ORB ORGANIZATION, INC. 607 SW Grady Way, Suite 210 Renton,l Ashington 98055 P. a illiam, AIA Date KIRTLEY-COLE ASSOCIATES 1002 - 10th Street Snohomish, Washington 98290 lu_t5-9Z Date CITY OF RENTON, P ch R D 200 Mill Avenue South Renton, Washington 98055 L Vincent Lee /cZ�2 z T Date( *NOTE: Acceptance of the aWilional days on this Change Order is conditional pending receipt of K.C.'s critical path method schedule review. fr< ��/�'� f•G l4,/ '�% �'r•� v .. ,"`!�+ 1. -4-n rn Cm m0 -40 On m M to nz 1Z �v 4� mm dN [007 Fn 0 O h M MOIDIFICATIOI. PROPOSAL KIRTLEY COLE • Project: RENTON SENIOR HOUSING - JOB 1315 ASSOCIATES, INC tener Date: September 8, 1992 contractor pm. box 1179 To: THE ORB ORGANIZATION, INC. 1002 , 10th siwhomuh Wash. 99290 Initiated by: (206) 569-3175 Modification Proposal: Provide 4' crushed gravel under curb & gutter. As required by STeve Pinkham. Public Work inspector. =1 1% $330.13 97'.50 352.80 35.07 $815.50 S122.33 ae S 18.76 $956.59 5956.59 1� ao m 9 MATERIALS: EQUIPMENT: Bobcat Loader 21brs 0 535.001hr = $70.00 Compactor = $27.50 LABOR: 121hrs 0 S28-00/hr - SS336.00 Small Tools Allowance ($336.00 x 5%) = S16.80 W.S.S.T. on Materials/Equipment (5427.63 x 9.2%) Subtotal ...... .. .. ... . Overhead do Profit 0 15% .. ... , .... • . . Bonding ® 2% .... ... .. . . Total.................. .. ... React ror Modification: Cost: Additional: Change in Calendar Days: -0- Recontmendadon: Architect4�' General Contractor Owner S956.59I Credits: Approved Reject for C.O. S.o- 1 Net: Modification proposal Incorporated Into Change Order Number: 27 Attadunents: as per Stott way Concrete invoice 194521. dated 8112192. No action will be taken reprdinr this ium nttuil we recsi" wrimm smM cation ditsding w to do w. AU contract work wiU proceed on its normal schedule. PROPOSAL NO. i I ` ! -T" I, ST NEWAY INVOICE AC>vO(0MNG 762-2566 SAND a GRAVEL 226-14W 1915 MAPLE VALLEY HIGHWAY • RENTON. WA 98055 TOLL-FREE SEAT tLE 623.1414 C -f7 FAX (246)763-178 SCLD TC DELIVERED TO- SCLD TC EY -COLE ASSOC 3151 R. E. 16TH STREET - RENTON KIRp. O. BOK 1179 SHOHO"IS}ll VA 98290 PROJECT AGG DEL ,+vc CE yq ;•.17E l ACCOUNT NC 481611 12 41521 QN8 12 92 630365 TOP COARSE-DELV-SOLI) 26.41 12.50 MN 330.13 i i DELIVERED ON TICKET NUMBERS: 735381 735386 NET 3016 Reml1 To STONEWAY CONCWM WQ ~•` � 9125 10th A e" SmAh Searle. WA 9810H TAXABLE I y � G 2 0 19 92 1 Mi' ICOLE ASSOCIATES 1 5330. 13 SALES AA 827.08 0357.21 2 d m -1 it W -4 vm TC1 -a8 Oc: O_ O i Am 0 60 0 Fn CN 0 En Z a 0 m MODIFICATION PROPOSAL K,IRTLEY COLE • Project: RENTON SENIOR HOUSING -JOB 1315 - ASSOCIAM, INC tavef Date: September 8, 1992 contractors p.a. ba: 11 79 1002 -lotth To: THE ORB ORGANIZATION, INC. anohomish wuh' 98290 Initiated by: ARCHITECT (206) 568-3175 Modification Prod: Change door opening 145 as per PR 154: Henry Baron Building Materials - Matwials ($492.00) $532.00 Labor ($40.00) Labor - 5 hours 0 28.00lhr. = $140.00 147.00 Small Tools Allowance (S140.00 X5%),-- $7.00 320.00 Supervision - 8 hours 0 40.001hr. WSST on materials (S492.00 X 8.2%) 40.34 Subtotal . , .... .. .. S1,039.34 $155.90 Overhead do Profit a 15% ................................ 296 S23.90 Bonding 0 .... .... . Total ... .... ...... $1,219.14 Reason for Modification: Cost: Additional: $1,219.14 Credits: S-0- Net: 51,219.14 Change in Calendar Days: TWO (2) Approved Reject Recommendation: for C.O. Architect General Contractor Owner —W - Modification Proposal Incorporated Into Change Ordkr Nurnber. 27 Attae Wb: as per requm from Henry Barna dated 8128192. No axion will be taken reprdin= this item until we receive wrist o authotintion directing w to do +o. All eonuld work will proceed on iu normal schedule. PROPOSAL NO, N qoT BY 3- 4-32 :12.43F"i K I R'TM COLE KIItTLEY-COLE ASSOCIA.TES9 INC. 100] • 101h $U.ctlr.o. ftx 1179. soubmisk, WA 9#290 pho m C2156i.3175MAX (2061561-7919 August 28, 1992 O%RA ► usn TM roti+ omy wHm sosxrnm SUBISUI'PLIER: IESKRY BACON BUILDING MATERIAM, INC. P.O. Box 109 ILuquah, WA 9W27 AT'T'ENTION: Bey PROJECT; PENTON SENIOR HOUSING 1013 NUMBER: 30 DESCRIMON OF WORK: as per PROPOSAL REQUEST 134, itt2ched RESPOND $Y: 'TUESDAY, SEPTEMBER 1, 1992 RCCEM-W AUG 31IV TOTAL AMOUNT CONTRACT TIME REQUEST s's v DAY(S) :. 2I • V= moroUL lZsn.1M ALL orT[nc com rnvoLV= IXC LVMQ AKy - of lsUAYl. DAKAM ro MM 4'AV 'Yl A?M AMT UMS E11 it.'Yy of /vcs DVAYl . AUTHORIZED SIGNATURE: DATE: z 0 0 m -4-n Fn� cm rn 0 iC mm wv _ �z �CA 0 -n n mm 0a )F C ur irs