Loading...
HomeMy WebLinkAboutCO 28CHANGE ORDER CITY OF RENTON COR Form (This form is to be executed in triplicate and each party i5 tap l + J Owner DIM 110V 1 e31992 Architect al.) Contractor Project Name: RENTON SENIOR HOUSING KIRTRY&COLE A55Ul,IF11 tNovember 13, 1992 Project Address: 3151 NE 16th Street RECEIVED Change Order No.: Twenty -Eight (28) TY CLERK'S OFFICE Contractor Name: KIRTLEY-COLE ASSOCIATES ORS Project No.: 07 & Address 1002 - 10th Street COR Project No.: AG 095-91 CAG Snohomish, Washington 98290 Contract For. General Construction Contract Date: October 31, 1991 The Contract is hereby amended as follows: 1. Per ORS Proposal Request #51, 9!2592, and Kirtley-Cole Modification Proposal #67R 03, 1116192 (copies attached): 'Add disconnects for a l apartment water heaters, at heater closets.' Add $8.865 83 2. Per KirtleyCole Modification Proposal #1018, 1114192 (copy attached): Subtract (52.210.77) 'Modify procedure ref. landscape soil preparation." 3. Per ORB Proposal Request #59R, 1018192, and Kirtley-Cole Modification Proposal #1058, 11111192 (copies attached): 'Add sealant to Gyperete flooring and substitute 4' vinyl wall base in place of 6' at unit kitchens and bathrooms.' Add 865.29 4. Per Kirtley-Cole Modification Proposal #107, 10/27192 (copy attached): Subtract ($274.03) 'Credit for sales tax charges on MP #70, 071 and #72.' TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: . ............... ................. Add $7,266.32 The Change Order shall include all Contractors) la5or, material, overhead, profit, and all direct and/or indirect costs associated with the Change in Scope of Work. This Change Order is not valid unless signed by the Owner, Architect, and Contractor. TheOriginal Contract Sum was........................................................................................................................$4,620,765.00 Net Change by previously authorized Change Order(s) was..................................................................................654,880.83 The Contract Sum prior to this Change Order was........................................,.....................................................5,275.645.83 The Contract Sum will be revised by this Change Osier in the amount of ............................................................... 7,256.32 The new Contract Sum incorporating this Change Order will be.........................................................................5282,912.15 The Contract Time will be changed by .............................. SEE ' BELOW.........................................+ 3 days The Substantial Completion Date including this Change Order is ..... ..................... .................... I................. January 26, 1993 (See Change Orders #12, 18 b 19 for TBD items ) NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by ORB Form 301 - Construction Change Directive or Owners Field Directives. THE ORB ORGANIZATION, INC 607 SW Grady Way, Suite 210 Renton, Washln tan 98055 P. DeWilliam, AIA Date KIRTLEY-COLE ASSOCIATES 1002 -10th Street Snohomish, Washington 98290 J� V)idordon Cole GC'• //w Date CITY OF RENTON, P & R DEPT, 200 Mill Avenue South Renton, Washington 98055 4— . Vincent Lee 31e Date NOTE: Acceptance of the additional days on this Change Order is conditional pending receipt of K.C.'s critical path method schedule review. Z O d n m �n Cm m0 -4 {) OC 3: —4 J0 �Z OT mM 0 F") nFn 0 X Z Z O -a n M MODIFICATION PROPOSAL NO. 67 REVISED KIRTLEY COLE 0 Project: RENTON SENIOR HOUSING - DOB 1315 ASSOCIATES, INC Daze: November 4, 1992 corrtraaars p.a. hoz 1179 1002 - 10th To: THE 0R ORGANIZATION, INC. ppbomish wash. 99290 Initiates) by: Architect CZ06) 569-3175 Modification Proposal: Provide disconnect for hot water tank at water heater closet: Rob's Electric, Inc. WEST on materials (52,939.52 X 8.2%) Supervision - 3 hours ® 40.001hr. Subtotal .. ... .. .. .. ..... . Overhead do Profit a 15% .. .. .. . . Bonding a 2% .. .. .. .. .. ....... . Total .. .. . Reason for Modification: as per PROPOSAL REQUEST 151 Cost: Additional: $8,885.83 Credits: S -0 - [Change in Calendar Days: TWO (2) Recux-1 dation: Architect General Contractor Owner F -- Approved I�LFl.�w Net: Modification Proposal mcOrporated Into Cliange Otter N=ber.. 2'6 Attaelsments: Rob's Electric, Inc. - Change Old" + '11.237 No scorn wiH be taken regarding this item until we receive written authorization dirceting us to do so. AH contract work will ptnaxd an its nomW scthedule. MOPOSAI. NO. SOML-SEM REVISED - 1111R 7,214.26 241.04 120.00 4 57575.30 $1,136.30 $174.23 58.1185, 83 IIiV ..4r ri�� tivv rsr� i Vr.. �� � w � rry r rV4 r I "ON" 334-62U CHANGE ORDER TO mums" _ — _ 2275 Kirtlep Cole Associates PNOM n 1002 10th St. 10-14-92 Snohomish, Ha. 98290 rvarxar Renton Senior Housing 1PR 51 Revised from CO 2237 we ttarstry aw" to rnaaa the a+anQNs) •psctMo wow. Install disconnect for hot watatr tank in hot water tank closet. 104 - 4 aq. to single boxes • $5.28 ea. ; 549.12 104 - Rained switch covers • $2.50 ea. $ 260.00 104 - 2 pole 30 amp switches 0 $ 20.00 ea. i 2080.00 160" - #10 MIN !..250 ,per ft. $ 40.00 104 Red vire 'nuts % .100 ea. $ 10.40 95h hours of .labor • $35.00 per hour ---3333.75 Subtotal # 6273.27 15% profit and overhead Total Amount Due 940.99 $ 7214.26 .:=an=baa= t�oTt>rr TMS Chan" order bacorn" tart of and in C"WMaoa wtth the OXI I" contract. WE AOREN hereby to make the change(e) apecftfed above at this price *A" PREVIOUS CONMACT AMOUNT I ; REVISED CONTRACT TOTAL. 1$ ACC=rMp -- The above priori and speclftaatlons of B IN* Chang. Ordor am satlslactory Date of acceptance herby and are hey so. — —,-- cepNd All work la be pwformod under some terse and candttlons as apeOffled In ortpinal contract unless Other. afgnslure _ wise Stipulated.n+arr� — '� 0 W� z M u LL w EL FaM ML, HICT tIC.AI CONTRACTORS 4406 103RD AVE S.E. • EVERE1T. WA 98M. TELEF410ME QDQ 334."3. Tax 334-7066. . $1CSrK= TRAmmussm PLxASz DELXV IlQ=ZATZLY TO THE PRRSOU LISTED MELONS IAS:_ to- Is-�� TO _ i ft -•t-+2. ��7 �.D AT": MROKs T►n r,,n.2 Plains TO VOLLOx RPWZAL Man2oCTiolm: .t.1. t I! 'tom! YEItlR Alff PEOST, WM THIS TwmawaL PLnu cowAC9' OUR O"XCE. RAY �'�Gm TSl� YOU EMWAI Ni + TEPIW R f r 9 ACMtWM DEBBIE � DIANE FAX TO COMMEWS