Loading...
HomeMy WebLinkAboutCO 29CHANGE ORDER CITY OF RENTON Owner COR Form (This form is to be executed In triplicate and each party is 10)v?iirT,si� o�J 1410V 13 1992 Architect Contractor Project Name: RENTON SENIOR HOUSING ntnLsze:- %.vLL hLuElVED Change Order No.: Project Address: 3151 NE 18th Strert ,1Y CLERK'S OFFICE �1106vember 13, 1992 Twenty -Nine (29) Contractor Name: KIRTt.EY-COLE ASSOCIATES ORB Project No.: 9007 & Address 1002 -10th Street COR Project No.: CAG 095-91 Snohomish, Washington 98290 Contract For. Geueral Construction Contract Date: October 31, 1991 The Contract is hereby amended as follows: 1. Per ORB Proposal Request #60, 10113/92. and Kirtley-Cole Modification Proposal #109, 10127!92 (copies attached): 'Frame openings at Roof Vents in Common Area Add $1,15$.43 Ceilings." 2. Per Kirtley-Cole Modification Proposal #1104,10115192 (copy attached): Subtract (S108.10) 'Credit for water system fees." 3. Per Kirtley-Cole Modification Proposal 0113.11/4192 (copy attached): "Insulate Add 810.55 sprinkler pipes In attic.' TOTAL CONSTRUCTION COST IMPACT 4F THIS CHANGE ORDER : ................................ ...... Add $1,880.88 The Change Order shall include all Contraclor(s) labor, material, overhead, profit, and all direct and/or indirect costs associated with the Change in Scope of Work. This Change Omer Is not valid unless signed by the Owner, Architect, and Contractor. .$4,820,785.00 The Original Contract Sum was ....................... ............................................................................... .......................882.147.15 Net Change by previously authorized Change Ordcr(s) was.....................................................................5.282.912.15 The Contract Sum prior to this Change Order was........................................................................... this Change Order in the amount of 1'880.88 The Contract Sum will be revised by . ng.........................................................5.284.573.03 The new Contract Sum incorporating this Change Order will be............................................................ The Contract Time will be changed by .................................... ....(.......................................................,................... 0days The Substantial Completion Date Including this Change Order is............................................................ ..,.January 28, 1993 See Change Orders #12, 18 & 19 for TBD items.) NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by ORB Form 301 - Construction Change Directive or Owner's Field Directives. N PbRDFPT THE ORB ORGANIZATION. INC. 807 SW Grady Way, Suite 210 Renton, %l hinglon 98055 Illam, AIA Date KIRTLEY-COLE ASSOCIATES 1002 - 10th Street Snohomish, Washington 98290 J on Cole A/, L' 9 Dote CITY OF RENTO , - 200 Mill Avenue South Renton, Washington 98055 Vincent Lee Date � T r11 am M OC C �K rn O_ AZ r Q -n -n ;o Ds rnrn MODIFICATION PROPOSAL NO. 104 KIRTLEY COLE • Project: RENTON SENIOR HOUSING - 90811315 ASSOCIATES, INC tenceal Date: October 15, 1992 contr iaon p.o. box 1179 To: THE ORB ORGANIZATION. INC. tom_ -loth Snohomish W13h. 9II:90 Initiated by: Owner rabl 5610175 Modification Proposal: Credit for fees paid directly by owner (waterline connection/chlorinator pump rental): Subtotal . , . • . . Total ... .. .. ..... Reason for Modification: -106.10 If S-106.10 II S-106.10 I Cast: Additional: $0.00 Credits: $106.10 Net: S-106.10 Change In Calendar Days: -0- Recommendation: for u -u. Architect General Contractor Owner Modilitution Proposal Incorporated into Change Order Number. Attachments: Citic of Renton - Interfund Tnutsfer. dated MOM No uiion will be taken reprding this item until we receive wrinen authorisation d4=609 us to do so. All contrsct work will proceed on its normal schedule. ONE HUNDRED- FOUR (191LPROPOSAL NO. n f INTERFUND TRANSFER Treader Number: Dabs„., General Descripdoa: ao 070 Qwrrnrt n � }P 4lnfarl'++�$fyg�S1.II� p Departtent To Be C>arged (Transfer (hit - Frons) Department Authorization: DtpCartlne W To Be C ej&ed (Transfer In -To) ' 1 ' v Desai tion Account Number WO/Function Amount Q o 87240 5530 1386.10 Less Deposit 401/500/00.364.90.00 87Z40 [1440.00) Ant icnn/nn 'sAA_90.00 57240./5534 160.00 at.ro.dw WNW room Dqww" Ya,w. DepeeapW to be Cb"W raik Depwn.m 0 ba Orod W .• MODIFICATION PROPOSAL NO. 109 1URTLEY COLE i 1?rojWc REMN SEMOR HOUSING - JOB 11315 ASSOCIATES, INC Dale: OcuAw 27, 1992 oonuamn p.o. box 1179 To: THE ORB ORGANIZAnON, INC. IOO2. 10th snoboaush w.sh. 98M Initiated by: Architect MM) 568-3175 Modilicatinet Proposal: Frame openings at roof vents in Comma Area ceilings: 1V[ateriala - 2 X B (150) l.f. 0 .5&1f = $84.00 2 X 8 hangers (32) ea. o .38/ea = $12.00 Labor - framing (30 hours 0 28.00) = S840.00 Small Tools Allowance ($840.00 X 5%) = $42.00 WSST on materials (596.00 X 8.2%) --- Sub-Ad .. Overhead dt: Profit 0 15% Bonding 0 2% Total ... Resew for Modlliration: as per PROPOSAL RMUES1i /60 coffl; Additional: $(,156.43 Credits: S'0" Chmp in Caietld*r Days: -0- lterommepdation: Architect General Coatracor Owner 96.00 $985.87 $147.86 527..68 $1.156.43 Net: $1.156.43 1 1 IHodif (kation proposal Inwrporated Into Change Order Narnbc: 21 Auachrttents: No action will be taken mprdin8 this item trach we-006rts —if"b"hmfoadkccting us to do so. Ali eantrad work will pttuaad an its normal seho&de- PROPOSAL NO. ONENUNi7