Loading...
HomeMy WebLinkAboutCO 31CHANGE ORDER Owner_ Architect COR FormContractor (This form is to be executed in triplicate and each party is to retain an original.) Project Name: RENTON SENIOR HOUSING Date: December 18, 1992 Project Address: 3151 NE 18th Street Change Order No.: Thirty-one (31) Conlractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.: 9007 & Address 1002 - 101h Street COR Project No.: CAG 095-91 Snohomish, Washington 98290 Contract For. General Construction Contract Date: October 31, 1991 The Contract is hereby amended as follows: 1. Per ORB Proposal Request 957, 9118192, and Kirtley-Cale Modification Proposal #10BR, 1218192 (copies attached): 'Relocate (1) street light to location specified Add 5,853,55 by Owner's Rep.' 2. Per Kirtley-Cole Modification Proposal #115, 1218192 (copy attached): Add , 32$44 'Relocate magentic hold -opens at West Wing.' TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER:......................................Add $1,181.99 The Change Order shall include all Contractor(s) labor, material, overhead, profit, and all direct and/or indirect costs associated i tl with the Change in Scope of Work. i This Change Order is not valid unless signed by the Owner, Architect, and Contractor. - : The Original Contract Sum was........................................................................................................................$4,620,765.00... 665.940.25 Net :.barge by previously authorized Change Order(s) was .........................................,...........,.......,.....,.... The Contract Sum prior to this Change Order was ...................................... ........................................................ 286,705.25 5'... 1,181.99 The Contract Sum will be revised by this Change Order in the amount of ................. ........................................28787.24 .......................... The new Contract Sum incorporating this Change Order will be.............................................................................,...5,287,8days The Contract Time will be changed by ....... _ .................................................................. ' ry . The Substantial Completion Date including this Change Order is ........................................ ...... I ......... ........ Janus 27 19 93 (See Change Orders #12, 18 & 19 for TBD tems. NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved by ORB Form 301 - Construction Change Directive or Owner's Field Directives. THE ORB ORGANIZATION, INC. KIRTLEY-COLE ASSOCIATES CITY OF Renue So t b R DEPT. 807 SW rady Way, Suite 210 1002 -10th Street 200 Mill Avenue South Rento , aihington 98055 Snohomish Washington 98290 Renton. Washington £n�755 o P. a rlliam, AIA Gordon Cola Vincent Lee 3 /9 Date Date Dafel O n rn