Loading...
HomeMy WebLinkAboutCO 34F�EtIT0I`I F WF CHANGE ORDER TEL rio .2 ; 552 - Feb !1. i '. 4 1, No.001 P.03 Owner COR Form Architect _ (This form Is to be executed In triplicate and each party is to retain an original,) Conlractor Project Name: RENTON SENIOR HOUSING Date: February 10, 1993 Project Address: 3151 NE 18th Street Change Omer No,: Thirty-four (34) Contractor Name: KIRTLEY-COLE ASSOCIATES ORB Project No.: 9007 d Address 1002. 10th Street COR Project No.: CAG 095-91 Snohomish, Washington 98290 Contract For: General Construction Contract Date: October 31, 1991 The Contract Is hereby amended as follows: I . Per KlrtleyCole Modification Proposal 0798, 1218192 (copy attached): 'Provide additional blocking due to ceiling elevation change.' Add $3,847.17 2. Per ORIS Proposal Request 031, 6IM2 and Virlley-Cole Modirlcalion Proposal N98R, 1017192 (copies attached - see conditional approval note on M.P.): 'Change 20' long light fixtures to 18'. Provide hanger brackets for suspended lights In common area. Revise corridor lights at relocated double.egress doors.' Add 3,487.25 3. Per COR Proposal Request 045, 1212192 and Field Directive 038, 1113193 and Kbrtley-Cole Modification Proposal 0117, 12/22/92 (copies attached): "Provide (1) Front Load Washer per ADA Regulations." Add 2,199.21 TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: .. ................................Add $9.278,63 The Change Order shall include all Contractor(s) labor, material, overhead, profit. and all direct and/or Indirect costs associated with the Change in Scope of Work. This Change Order Is not valid unless signed by the Owner. Archltecl, and Contractor. The Original Contract Sum was......................................................•...............................................•..............$4,820,785.00 Nei Change by previously authorized Change Orders) was ............................. ................................ ..................... 878,989,77 TheContras Sum prtorio this Change Order was ................................•........ ,.... .... ... I ................. I ...... ............... 5.299,734.77 The Contract Sum will be revised by this Change Order In the amount of................................................................ 9,276.83 The new Contract Sum Incorporating this Change Order will be ..... ................................................................... 5,309,013.40 The Contract Time will be changed by ............................ ...•................ SEE ' BELOW........................................ , .T.B.D. The Substantial Complellnn Date including this Change Order Is................................................................January 31, 1993 (See Cheo ge orders 012, 18, 19, 33 8 34 for TBD Items.) NOTE. The above summary does not Include any changes In the Contract Sum or ConlraG Time which have been approved by ORB Form 301 - Construction Change Directive or Owners Field Directives. THE ORB ORGANIZATION. INC. 607 SW Grady Way, Suite 210 Renton, Washington 98055 'I /tNeWifllam, AIA J1 i, Date KIRTLEY-COLE ASSOCIATES 1002 - 101h Street Snohomish, Washington 98290 " r- i ordon Colo 93 Date CITY OF RENTON. P & R DEPT 200 Mill Avenue South Renton. Washington 98055 Vincent Leo Date 'jf OT[. Acceptance of the additional days on this Change Order, if and when idenlif od, is conditional pending recnipi of KC'a critical path schedule review, .I rn m MODIFICATION PROPC ILL NO. 79 REVISED KIRTLEY * COLE • Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES, INC genera Date: December 8, 1992 contruto" P.O. box 1179 1002 - 10tth To: THE ORB ORGANIZATION, INC. snohorniuh wauh. 99,290 Initiated by: (206) 568-3175 Modincallon Proposal: Provide additional blocking required due to change in ceiling elevation: Labor - 75 hours ® 28.00/hr. = $2,100.00 Small Tools Allowance ($2,100.00 X 5%) = $105.00 Materials Subtotal Overhead do Profit 0 1546 ........... . ' Bonding 0 2% .... Total......................... Reason for Modification: Coat: Additional:. Change in Calendar Days: -0- Recommendation: Architect General Contractor Owner 2.205.00 900.00 $3,105.00 $465.75 $71.42 $3,642.17 $3,642.17 I Credits: 5 -0 - Net: $3,642,17 rw � �1 I1000_m� Modification Proposal Incorporated Into Change Order Number Attachments: No action will be taken reprding Alii item until we receive written suthoriution directing ue to do so. All contract work will Proceed on its nonnepROPOSAt NO. SEVF?NTY 4u kit)z MOVIFICATION PROPOSAL NO,961R KIRTLEY COLE • Project: RENTON SENIOR HOUSING -!OB #315 ASSOCIATES, INC. prom Date: October 7, 1992 aontnaon p.o, bait t I14 To: THE ORES ORGANIZATION, INC. 1002 • ioth tnohom4h wash. 98290 Initiated by: ARCHITECT 12061 369.3175 Modi(icutiun Proposal: Per RFI No. 101 - Change length of all 20' light tlxtures to 16'. Center betweea door openings. Per RF1 Nu,72 - Provide hanger brackets for community area suspended linear lighting fixtures. Revise corridor lighting at relueuted douhlc-egress doors. *NOTE: ADDITIONAL COSTS DUE TO PROJECT DELAY MAY OF. INCURRED DUE TO THIS CHANGE AND WILL BE FORWARDED AS APPROPRIATE 52,738.38 Rob's Elftiric 57.50 WSST on Materials (701.20 x 8.246} 160.00 Supervision - 4 hours 0 $40.00/hr Subtotal .. ° Overhead do Protlt 0 15% . .. ...... • • • • . Bonding 02 .. Reason for Modincuiiun: as per PROPOSAL REQUEST NO -31 F►eMb A rREM-1/C-� Z Cost: Additional: $3,467.23 Credits: S-0- Chanae in Calendar Days: -ADDITIONAL. DAYS TO BE DETERMINED Recommendation: Ar0itect y� General Contractor Owner Approved Reject for C.O. I A S2,955.g8 { 'II 443.38 9 a 6 67.99 y $3.467.23 1 Net $3,467.25 i Propnull Int:urporat�InfoChurue Order Numb � ,dam rr per o to cc ns 3 „ O,Q4 Nu poton will be taken regsrding this turn unlit we raeoive written ruthorisndon ditoctin{ w to do On. All wntm t wurlc will proceed on M nurmrl ,aPN ul4m- AL No. V r F W O KIRTLE f -COLE ASSOCIATES, INC. 10x1. 101► Ur"M.0.11ur 1171.1"homish, WA 91. W.wo CW) S4&11751PAX CAK) 56&7919 June 9, 1992 Qwa UU nW rows orn.r WMW rUWWrT" SUB/SUPI'LlER: ROB'S Ei.F.CTRSC, INC. 4405 - 103rd Avenue SE V70! ';1- 0 Evmttx WA 98205 ATTENTION: Rob PROJECT.: nXrON SENIOR HOUSING JOB NUMBER: 315 DESCRU'TTON OF WORK; AS PER PROPOSAL REQUEST #3I, ATTACHED RESPOND BY: BY NO LATER THAN MONDAY, JUNE 13, 1992 TOTAL AMOUNT CONTRACT TIME REQUEST AUTHORIZED SIGNATURE: DATF-t SIGNED: ' DAY(S) %w VVJ