HomeMy WebLinkAboutCO 34F�EtIT0I`I F WF
CHANGE ORDER
TEL rio .2 ; 552 -
Feb !1. i '. 4 1, No.001 P.03
Owner
COR Form
Architect _
(This form Is to be executed In triplicate and each party is to retain an original,)
Conlractor
Project Name:
RENTON SENIOR HOUSING
Date:
February 10, 1993
Project Address:
3151 NE 18th Street
Change Omer No,:
Thirty-four (34)
Contractor Name:
KIRTLEY-COLE ASSOCIATES
ORB Project No.:
9007
d Address
1002. 10th Street
COR Project No.:
CAG 095-91
Snohomish, Washington 98290
Contract For:
General Construction
Contract Date:
October 31, 1991
The Contract Is hereby amended as follows:
I . Per KlrtleyCole Modification Proposal 0798, 1218192 (copy attached):
'Provide additional blocking due to ceiling elevation change.' Add $3,847.17
2. Per ORIS Proposal Request 031, 6IM2 and Virlley-Cole Modirlcalion
Proposal N98R, 1017192 (copies attached - see conditional approval note on M.P.):
'Change 20' long light fixtures to 18'. Provide hanger brackets for suspended
lights In common area. Revise corridor lights at relocated double.egress doors.' Add 3,487.25
3. Per COR Proposal Request 045, 1212192 and Field Directive 038, 1113193
and Kbrtley-Cole Modification Proposal 0117, 12/22/92 (copies attached):
"Provide (1) Front Load Washer per ADA Regulations." Add 2,199.21
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: .. ................................Add $9.278,63
The Change Order shall include all Contractor(s) labor, material, overhead, profit. and all direct and/or Indirect costs associated
with the Change in Scope of Work.
This Change Order Is not valid unless signed by the Owner. Archltecl, and Contractor.
The Original Contract Sum was......................................................•...............................................•..............$4,820,785.00
Nei Change by previously authorized Change Orders) was ............................. ................................ ..................... 878,989,77
TheContras Sum prtorio this Change Order was ................................•........ ,.... .... ... I ................. I ...... ............... 5.299,734.77
The Contract Sum will be revised by this Change Order In the amount of................................................................ 9,276.83
The new Contract Sum Incorporating this Change Order will be ..... ................................................................... 5,309,013.40
The Contract Time will be changed by ............................ ...•................ SEE ' BELOW........................................ , .T.B.D.
The Substantial Complellnn Date including this Change Order Is................................................................January 31, 1993
(See Cheo ge orders 012, 18, 19, 33 8 34 for TBD Items.)
NOTE. The above summary does not Include any changes In the Contract Sum or ConlraG Time which have been approved
by ORB Form 301 - Construction Change Directive or Owners Field Directives.
THE ORB ORGANIZATION. INC.
607 SW Grady Way, Suite 210
Renton, Washington 98055
'I
/tNeWifllam, AIA
J1 i,
Date
KIRTLEY-COLE ASSOCIATES
1002 - 101h Street
Snohomish, Washington 98290
" r- i
ordon Colo
93
Date
CITY OF RENTON. P & R DEPT
200 Mill Avenue South
Renton. Washington 98055
Vincent Leo
Date
'jf OT[. Acceptance of the additional days on this Change Order, if and when idenlif od, is conditional pending recnipi of KC'a
critical path schedule review,
.I
rn
m
MODIFICATION PROPC ILL NO. 79 REVISED
KIRTLEY
* COLE • Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
genera Date: December 8, 1992
contruto"
P.O. box 1179
1002 - 10tth To: THE ORB ORGANIZATION, INC.
snohorniuh
wauh. 99,290 Initiated by:
(206) 568-3175
Modincallon Proposal: Provide additional blocking required due to change in ceiling elevation:
Labor - 75 hours ® 28.00/hr. = $2,100.00
Small Tools Allowance ($2,100.00 X 5%) = $105.00
Materials
Subtotal
Overhead do Profit 0 1546 ........... .
' Bonding 0 2% ....
Total.........................
Reason for Modification:
Coat: Additional:.
Change in Calendar Days: -0-
Recommendation:
Architect
General Contractor
Owner
2.205.00
900.00
$3,105.00
$465.75
$71.42
$3,642.17
$3,642.17 I
Credits: 5 -0 - Net: $3,642,17
rw � �1 I1000_m�
Modification Proposal Incorporated Into Change Order Number
Attachments:
No action will be taken reprding Alii item until we receive written suthoriution directing ue to do so.
All contract work will Proceed on its nonnepROPOSAt NO. SEVF?NTY
4u kit)z
MOVIFICATION PROPOSAL NO,961R
KIRTLEY
COLE • Project: RENTON SENIOR HOUSING -!OB #315
ASSOCIATES, INC.
prom Date: October 7, 1992
aontnaon
p.o, bait t I14 To: THE ORES ORGANIZATION, INC.
1002 • ioth
tnohom4h
wash. 98290 Initiated by: ARCHITECT
12061 369.3175
Modi(icutiun Proposal: Per RFI No. 101 - Change length of all 20' light tlxtures to 16'. Center betweea door
openings. Per RF1 Nu,72 - Provide hanger brackets for community area suspended linear lighting fixtures. Revise
corridor lighting at relueuted douhlc-egress doors.
*NOTE: ADDITIONAL COSTS DUE TO PROJECT DELAY MAY OF. INCURRED DUE TO THIS CHANGE
AND WILL BE FORWARDED AS APPROPRIATE
52,738.38
Rob's Elftiric
57.50
WSST on Materials (701.20 x 8.246}
160.00
Supervision - 4 hours 0 $40.00/hr
Subtotal .. °
Overhead do Protlt 0 15% . .. ...... • • • • .
Bonding 02 ..
Reason for Modincuiiun: as per PROPOSAL REQUEST NO -31
F►eMb A rREM-1/C-� Z
Cost: Additional: $3,467.23 Credits: S-0-
Chanae in Calendar Days: -ADDITIONAL. DAYS TO BE DETERMINED
Recommendation:
Ar0itect y�
General Contractor
Owner
Approved Reject
for C.O.
I A
S2,955.g8 { 'II
443.38 9
a
6
67.99 y
$3.467.23
1
Net $3,467.25
i
Propnull Int:urporat�InfoChurue Order Numb � ,dam
rr per o to cc ns
3 „ O,Q4
Nu poton will be taken regsrding this turn unlit we raeoive written ruthorisndon ditoctin{ w to do On.
All wntm t wurlc will proceed on M nurmrl ,aPN ul4m- AL No. V r
F
W
O
KIRTLE f -COLE ASSOCIATES, INC.
10x1. 101► Ur"M.0.11ur 1171.1"homish, WA 91.
W.wo CW) S4&11751PAX CAK) 56&7919
June 9, 1992
Qwa UU nW rows orn.r WMW rUWWrT"
SUB/SUPI'LlER: ROB'S Ei.F.CTRSC, INC.
4405 - 103rd Avenue SE V70! ';1- 0
Evmttx WA 98205
ATTENTION: Rob
PROJECT.: nXrON SENIOR HOUSING
JOB NUMBER: 315
DESCRU'TTON OF
WORK; AS PER PROPOSAL REQUEST #3I, ATTACHED
RESPOND BY: BY NO LATER THAN MONDAY, JUNE 13, 1992
TOTAL AMOUNT
CONTRACT TIME REQUEST
AUTHORIZED SIGNATURE:
DATF-t
SIGNED: '
DAY(S)
%w VVJ