HomeMy WebLinkAboutCO 35RENTON PARIK S CHANGE ORDER TE, Na.2775523 Fes-- 11,93 sial N0.001 P.04 Own or COR Form Architect (Phis form Is to be executed In triplicate and each party Is to retain an original } 2. Per ORB Field Directive 032 and Klrtloy.Cnlo Modlfleallon Proposal 0128, Contractor Project Name: RENTON SENIOR HOUSING Dale February 10, 1493 Project Address: 31511 NE 16Ih Street Change Order No.: Thllty-five (35) Contractor Name: KIRTLEY-COLE ASSOCIATES ORU Project No.: 9007 & Address IIN2 - 10th Street COR Project Nn,: CAG 095-01 'Provide MDO Ild whit access door above folding tabic In Laundry Room." Snohomish, Washington 98290 Contract For. General Construction Contract Date,, October 3l, 1491 The Contract Is hereby amended as follows: I . Per Klrtley-Cale Modification Proposal 11111125, 12129192 (copy attached): 'RAlse catch basins 018 and 017 by 8'." Add $275.80 2. Per ORB Field Directive 032 and Klrtloy.Cnlo Modlfleallon Proposal 0128, 115!93 (coples attacher!): 'Lower the conteriine intersection of detention pond gravel Access roads.' Add 655.36 a. Per Kirtley-Cole Modification Proposal 0129, 115143 (copy attached)- 293.25 'Relocate rockery at west Side of road at SW and of west wing." Add 4. Per Kirtley-Cole Mod9flcallon Proposal 0130, 115193 (copy attached): 'Provide MDO Ild whit access door above folding tabic In Laundry Room." Add 28$.37 5 fuer Klrtley-Cole Modifiatlon Proposal 0112, 1114192 and prior Change Order 032 ',Re -Instate 4' high concrete pads at un4 hot water tanks.' Add 'C" TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER.. .......... ..Add $1,000.88 Thn Change Order shall include all Contractor(&) labor, material, overhead, proal, and all direct andlor Indirect costs associated with the Chanpe in Scope of Work. This Change Order is not valid unless signed by rho Owner Architect. and Contractor. The Original Contract Sum was --- .......................... .......... - ................ .....................................................$4,620,705.00 Net Change by previously authorizes! Change Order(s) was .................................................................................866,248,40 Tho Contract sum prior to this Change Order was ............................ ........................ ...................................... 6,309,013,40 The Contract Sum will be revised by this Change Order in the amount of............................................................... 1,600.88 The new Contrast Sum Incorp6ratin0 this Change Order will be ............. SEE ' BELOW,,.,.. ............................ 5,310.704.28 The Contract Time will N changed by ........................................ .... SEE ' DELOW......................................... + 5 days The Substantial Completion Date Including this Change Order is ............... ............,, February 6, 1993 (See Changs O(dorS 012, 16, 19, 33 & 34 for TBD Items.) NOTE: The above summary does not include any changes In the Contract Sum or Contract Tlmo which have been approved by ORD Farm 301 - Construction Change Directive or Ownor's Fluid Directives. THE ORB ORGANIZATION, INC. 607 SW Grady Way, Suite 210 Renton,,Washington 98055 C ral , de illiia�ml. AIA / Dale KIRTLEY-COLE ASSOCIATES 1002 - 101h Street Snohomish, Washington 98290 Gordon Colo Date CITY OF RENTON, P S R DEPT. 200 MITI Avenue 5100h Renton, Washington 9h055 �fl', ` Vincent Lee -2115-I-q 3 DAI Acwplance of the additional days en MP's listed In this Change Ordur is, conditional pending receipt of K.C.'s crillcGI pith method schoduie review, one weather day hus been added ref 1120193 storm. Z 0 41 m q: -n rn 0 rn rn O C 2J ;nM O [Z O rn ON n�n 0 rn z O n M MODIFICATION PROPOSAL NO. 126 KIRTLEY COLE • Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES. INC gcnen Date: December 29, 1992 Contractor p.o. box 1179 ro: THE ORB ORGANIZATION, INC. 1002 • loth enohomiah wash. 95290 Initiated by: (206) 365.3175 Modification Proposal: Raise C.B. #16 and C.B. #17 6": Labor - 8 hours ® 28.00Ihr. = $224.00 Small Tools Allowance ($224.00 X 5%) = $11.20 Subtotal Overhead & Profit 0 15% , . , • • • Bonding 0 2% ... . . Total............................... Reason for Modification: Cost: Additional: $275.89 Credits: $-O-=Net, Change In Calendar Days: ONE (1) Approved Reject Recommendation: for C.O. Architect/ General Contractor Owner Modification Proposal Incorporated tntn Change Order Number: Attachments: No action will be taken regarding this item until we receive written authorisation directing ua to do so, All contract work will proceed on iu normal schedule. PROPOSAL NO. ONE HUNDRED T 235.20 $235.20 $35.28 $5.41 $275.89 $275.89 oil MODIFICATION PR%jPOSAL NO. 128 KIRTLEY _ COLE 0 Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES, INC genera Date: January 5, 1993 contractors p.o. boa 1179 To: THE ORB ORGANIZATION, INC. 1002 - 101h anohomirh .11h. 98290 Initiated by: (206) 5691115 Modification Proposal: Additional costs to lower the centerline intersection of the detention pond gravel access roads: John's Backhoe - 12 hours 0 50.00htr. 600.00 Supervision - 2 hours ® 40.00rhr. 8� WSST on equipment ($600.00 X 8.2%) 49.20 Subtotal .. .... ... .... $729.20 Overhead & Profit 0 15% . • $109'38 Bonding a 2%........... ................................. $16.77 Total . , ... .. .... ... ..855.35 Reason for Modincatlon: as per FIELD DIRECTIVE #32 Cost; Additional: S855.35Credits: $-0- Net: $855. 35 � 9 Change In Calendar Days: $: Approved Reject Re j Recommendation: for C.O. Architect Ala General Contractor Owner Modification Proposal Incorporated Into Change Order Number: 3 Attachments: No action will be taken regarding this item until we receive written authoriution directing us to do so. All contract work will proceed on its normal schedule. _ PROPOSAL. NO. ONE RUN dcma -- ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS AIA DOCUMENT 0770 (Instructions an reverse side) Owner ❑ Architect ❑ Consultant ❑ Contractor ❑ Field ❑ Other ❑ PROJECT: RENTON SM(IOR HOUSING ARCHITECT'S SUPPLEMENTAL (name, &ddress) INSTRUCTION NO: FIELD ORDER NO. 32 OWNER: CITY OF RENTON TO: (Contractor) KgTLET—COLE ASSOCIATES 1002 — 10TH STREET SNOHOMISH. WA, 98290 DATE OF ISSUANCE: NOVEMBER 10. 1992 ARCHITECT: THE ORB ORGANI7.ATION. INC. CONTRACT FOR: GENERAL. CONSTRUCTION ARCHITECT'S T'S PROJEJECT CT NO: 9 007CAG 0095-91 The Work shall be carried out in accordance with the following supplemental instructions issued in accord- ance with the Contract Documents without change in Contract Sum at Contract Time. Prior to proceeding in accordance with these instructions, Indicate your acceptance of these instructions for minor change to the Work as consistent with the Contract Documents and return a copy to the Architect. Description: Please lower the centerline intersection of the detention Pond gravel access roads from elevation 382 to elevation 381.5. Exhibit A shove the minor changes in location of contours 381 and 382 ,for your guidance. There are no changer in the existing curb cut or in the seeded slopes above the pond accesb road. Attachments: (Hon Tejon Ultinf or do-f"t"" tbq lummet dacr O"'t t Exhibit A ISSUED: ACCEPTED: BY�. BY Archllect t:ontrattor Date AIA DOCUMINT 0710 - ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS - MARCH 1979 EDITION + AIM !1979 a THE AMERICAN INSTITUTE Or ARCHITECTS, 1735 NEW YORK AVE., N.w., WASHINGTON, D.C. 1=6 G710 1979 ,�._.-. `' .. �l , f�"" �1 ' � +'• syr jr� 1 ���` • . Irk t. ��s �, �. � � .� � � fir"► � zf Wv— RL �r'� _� ..' ` � •- ,gip `'•� �t1�" �� v,��, will k jA N ~ .J ./ HN j +� to f �� owl _ . � �, -- --- �, __. � � •� �,,� � i IV, I I • r r �, -. _ _...... - - '1SN1 311SOdWOO ®� 'Q'I lIV81AO �� 't MODIFICATION PROPOSAL NO. 129 KIRTLEY COLE 0 Project: RENTON SENIOR HOUSING - JOA #315 ASSOCIATES, INC -11 genera Date: January 5, 1993 contractor P.O. box 1179 To: THE ORB ORGANIZATION, INC. 1002 - Ithh enohomish with. 98290 Initiated by: QDS) 568-3175 Modification Proposal: Additional casts to move rockery, rockery at West side of road at SW end of West Wing had to be move! as It obstructed tate Fire Lane: John's Backhoe - 5 hours a 50.001hr. _ 250.00 Subtotal .. .. .. $250.00 Overhead & Profit 0 15% .. $37.50 Bonding 0 2% $5.75 I Total $293.25 Beacon far Madllication: Coat: Additional: 5293.25 Credits: 5-0- Net: $293.25 Change in Calendar Days:- �... Approved Reject Recommendation: for C.O. Architect p1� General Contractor Owner Modification Proposal Incorporated Into Change Order Number: 3 Attachments: No action will be taken regarding this item until we receive written authorisation directing us to do so. All contract work will proceed an its normal schedule. PROPOSAL NO. Q, MODIFICATION PROPOSAL NO. 130 Recommendation: Architect General Contractor Owner Approved / Modification Proposal Incorporated Into Change Order Ntunber: -35 Attachments: No action will be taken regarding this item until we receive written authorization directing us to do to. All contract work will proceed on its normal schedule. PROPOSAL NO. „QJIL a0Rl1D • 1MWRTY t122L KIRTLEY COLE • Project: RENTON SENIOR HOUSING -108 y315 ' ASSOCIATES, INC genes Date: January 5, 1993 oontmcmn P.O. box 1179 To: THE ORB ORGANIZATION, INC. toot -toorn loth Snohomish wash. 98294 Initiated by: (206) 568.3175 Modification Proposal: Provide MDO lid with access door above folding table In Laundry Room: Materials - 112 MDO plywood ($22.75) 39.49 (1) pair hinges ($6.75) (1) latch (57.00) WSST on materials (536.50 X 8.2%) m $2.99 Labor - 4 hours 0 28.001hr. = 112.00 l 17.60 Small Tools Allowance ($112.00 X 5%) = $5.60 50.00 Painting Supervision - 112 hour a 40.00mr. 20.00 Subtotal .. $227.09 Overhead & Profit @ 15% . $34'06 $5.22 Bonding a 296 Total .. ' $266.37 Reason for Modification: ws per RF1#225 Cost: Additional: $266.37 Cmdits: $-0- Net: $266.37 Change in Calendar Days: * Recommendation: Architect General Contractor Owner Approved / Modification Proposal Incorporated Into Change Order Ntunber: -35 Attachments: No action will be taken regarding this item until we receive written authorization directing us to do to. All contract work will proceed on its normal schedule. PROPOSAL NO. „QJIL a0Rl1D • 1MWRTY t122L �m o m �z �cn o m cn cC4 ur -AF Z 0 0 m i Adden. 134-93