HomeMy WebLinkAboutCO 37CHANGE ORDER Owner COR Form Architect retain an original) contractor (This form is to be executed in triplicate and each party is to Project Name: RENTON SENIOR HOUSING Date: February 26, 1993 Projezt Address: 3151 NE 16th Street Change Order No.: Thirty-seven (37) Contractor Name: KIRTLEY-COLE_ ASSOCIATES ORB Project No.: 9007 ✓i Address 1002 - 10th Street COR Project No.: CAG 095-91 Snohomish, Washington 98290 Contract For., General Construction Contract Date: October 31, 1991 The Contract is hereby amended as follows: 1. Per ORB Proposal Request #39, 613192 and Kirtley-Cole Modification Proposal Subtract (42,245.80) #93R #3, 2/10193 (copies attached): "Delete snow melt pad installation.' 2. Per ORB Architect's Supplemental #39, 1129/93 and Kiriley-Cole Modification Proposal #136, 219193 (copies attached): 'Cover exposed exhause ducts in Add 320.31 Laundry Room 155." 3. Per Kirtley-Cole Modification Proposal #137, 219193 (copy attached): 'Provide Subtract (•239.94) credit for Owner-fumished Radon Monitors.' 4. Per COR Proposal Request #74R, 2110193 and Kirtley-Cole Modification Proposal #138, 2124193 (copies attached): 'Delete (3) site roadway speed bumps.' Subtract (-272.00) TOTAL CONSTRUCTION CC ST IMPACT OF THIS CH NNGE ORDER:.......,..,...........................Subtract 52,437.43 The Change Order shall include all Contractor(s) labor, material, overhead, profit, and all direct and/or indirect costs associated with the Change in Scope of Work. This Change Order is not valid unless signed by the Ovnter, Architect, and Contractor. ...... $4,620.765.00 Thi Original Contract Sum was............._................................................................................................. ......,.. ..705,095.10 ....................................................................... Nc! Change by previously authorized Change Order(s) was .,.5,325.,860.10 The Contract Sum prior to this Change Omer was........................................................................................... ........ (2,437.43) .................................................,... The Contract Sum will be revised by th;s Change Order in the amount a 22.67 The new Contract Sum incorporating this Change Order will be.............................................................................. 5,3.2323,4days The Contract Time will be changed by ........................................ The Substantial Completion Date including this Change Order is ..................................................... I ......... . February 9, 199 (See Change Orders #12, 18, 19, 33, 34 8 36 for TBD items.) NOTE: The above summary does not include any changes In the Contract Sum or Contract Time which have been approved by ORE Form 301 - Construction Change Directive or Owner's Field Directives. Pr THE ORB ORGANIZATION, INC 607 SW Gfady Way, Suite 210 liam, A1A Date KIRTLEY-COLE ASSOCIATES 1002 - 10th Street Snohomish, Washington 98290 Gordon Cole Date CITY OF RENTON. P 8 R DE 200 Mill Avenue South Renton, Washington 98055 Vincent Lee 3 -to Date z 0 -i 0 rn =4 ;fi Qm �d m �n 0r mm 0 2 r_1 in 0 _n m O� n Fn C N K0 �0 z z 0 1 0 m ~ MODIFICATION PROPOSAL NO- 93 KIRTLEY COLE a Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES, INC Fcbrva+ ro rg93 gencr, Date: contractors p.o. boa 1179 T0: THE ORB ORGANIZATION, INC. 1003 - 10th snobomish wash. 99290 Initiated by: ARCHITECT (206) 369-3175 Modification Proposal: Delete the SNOW MELD PAD Installation as per PR#39: Rob's Electric, Inc. 7,2V5' - Subtotal Z$• Subtotal..................... .... *.2,Z�S Cha Total ....... Sr so Reason for Modification::::fj J �7q Cost: Additional: S-0- Credits: Net: '— Change In Calendar Days: -0- Approved Reject Recommendation: for C.O. Architect ki ha General Contractor �r Owner hiodireation Proposal Incnrporated Into Change Order Number: 37 AttacluneMs: as per Rob's Electric Change Order tr2206, dated 8128!92. No action will be taken regarding this item until we rtceive written authorization directing us to do so. All contract warts will proceed on its normal schedule. PROPOSAL NO. z m am m m d C m O a► 0 mrn R fit rn z O n m -ko "-1ECTRKvELEGTRIGAt CONTRACTORS �c, H A N G E ORDER mipmoNE SU,69U TO Kirtl*y Cole Associates 1002 10th St. Snohomishr Ha. 98290 VYe hereby eg,se to marcs the Chen96(ill speclilad below: Alternate *7 Snow melt pad to be de1etad Credit as fcllous f 2305.00) 1 Snow Melt pad ( # 80.00) i 400' - 10/2 Romex .204 per ft. f; 284.00} 8 hours of labor 6► $35,00 per hour � S 69.20 4 _ 2 pole 30 amp breakers @r $17.30 s,a. fout)nstailed? S 350 10 hours of labor @ $35.00 per hour fLay S 1245.8 Total Credit + 4'950.00 Alternate 7 gid 4of NOTE: This Changs Order WOMAS Darl pf and in CanformanCa with the e>bling tpnlraCl. W& AaFtIN hereby To make the change(s) sPlIclfled above at this price 1 s PnviouS CONTRACT AMOUNT $ All ACC910T14 _ The above price, and sPeClllcalions o! 1t+le Chancre older are g iorrl&Cj0ry and are ned under ggmg Igrmf d I&A All work id be W - unless oihet• REVISFt) CONTRACT TOTAL 1$ oats al &cc*Planes Sipnelure �wNR�r cep eondrkone gg aDeCIlbd In original Con". _ wigs ,Ilpul,led. FagM UNIT$0 lLIC 252 3133 :. 3.t773 15 19 UNITED EUCTRIC SUPPLY PVNRILTT Phonal 9364310 MT, LAK* TI FIRACt Phone: TTI -4926 V. 1 Quix-OUOTE MUMt,R1110N o 2367 WO OAT�E• r TQt r PROJECT@.�— �. ...�. -�"r•"'w— ! YROT11k'IJ. coMTaACtOe �� •+ CLCOTMau t11a1M[!tl On ~ta0r L eifllUttae tICaCIIIFtiarl .w � . YMIt Toy" L A SG ;1A�y�Dr {. DeAvery schedules aro aaaa on nefeM1sl eondllfons. WO w1n not "sums napJnelblllly lot delays caused by atAltes, eealNnls, shortage of Materials, or acts of Oos. !. Unless otherwise gWMsd, .bars pr+a9a 111m ler .._ dsye aeoeplance. 11. WOMAN abM are 9119M n our beat hitarprelMhon of the epeilllaillons. Thle dace not guarantee final aMoptablity by the approving authority. Voltage: Ig 30 p►lltpht P.O.t. --- Tase Off By, �. /eltmiled omtvery _ days from resarpt.1 ardor. a9cwt(yl M PROPOSAL RCH� REQUEST U>� CO NiRl1C'0 R "�•K fli:LD A!A DOCUMENT 0709 OTHER PROJECT: RI"..`i'"%CN S2 11= HOUSLaG PROPOSAL REQUEST NO: 39 (ns�mt+ slddrsesll 3151 RE 16th Street Renton WA 98056 OWNER. City of Ringo DATE: .June 3, 1992 (Contncmd Ci is Contract No: CAG 095-91 f— —i ZlIEC1 PROIEGT NC:9007 1002 - 10Th St_eet CONTRACT FOR: General Construction. Snohomish, WA 96240 J CONTRA,:. DATED- October 31, 1992 Pleur submit an Itemized auctadon for changes in the COMIC Sum endlor Time incidental to proposed modifica- tions m the C^ntnc Documents eescnbed herein. THIS IS NOT A VANC£ ORDER NOR A DIREC710N TO PROCZED WITH THE WORK OESCRIBED HEREIN. Desclption; nv"M dwoww o+ r. —M Delete the SNOW MELT PAIL Installation (Raf: bid item Alternate 07) As requested by Renton Housing Authority. This is confirmation of original deletion notification circulated on May 21, 1992. Attltlsments: tun mamas s.a.+++a tti wwon "Omm" Copy of 5/21/92 FAX mos©age. OWNER: AEA oocUmvgT t:; v! ' IRO?CSAI REQVEIT • Ap%IL TM MMOM • AIAO • 611M • THI ONl PAGE AmUUCAN INSiTr= Of A1011TIC'3, MS NtW YORK AVL. N.W.. WASi1IMG:ON, O.G 2=& Y ltcl,.Il -- LI ARCHITECT'S Owner Q SUPPLEMENTAL INSTRUCTIONS Architect ❑ Consultant 13 Contractor ❑ Field ❑ AIA iaOCUMENr 0710 (instructions on reverse side) Other ❑ PROJECT: Renton Senior Housing ARCHITECT'S IRS RUCTIONS SUPPLEMENTAL (39) (name, address) OWNER: City of Renton DATE OF ISSUANCE: January 29, 1993 TO: ARCHITECT: The ORB Organization, Inc. (Contractor) Kirtley-Cole CONTRACT FOR: General Construction COR pITECT'S PROJECroject NO: T NO: 9007 AG 095-91 The Work shall be carried out in accordance with the following supplemental instructions issued in accord- ance with the Contract Documents without change in Contract Sum or Contract Time. Prior to proceeding I in accordance with these instrut.tions, indicate your acceptance of these instructions for minor change to the Work as consistent with the Contract Documents and return a copy to the Architect. i Description: In Laundry Room 155, install 2 x framing and MDO plywood panel to cover up exposed exhaust ducts between dryer and folding table. MDQ to be placed approxi,tately 12" from backwall and be approxilantely 3' wide by 61 high, and shall return 12" to wall of end of folding table. Paint to match adjoining MDQ soffit - Attachments: (Hi, In,rt rl,rinr of document, IAiI ,uppan drrcriplron 1 ISSUED: ACCEPTED: By Doug Pede Architect a BY Contractor Due AIA DoCUMENT C,71d ARCHITECT'S SUPPItMINTAI INSTRUCTIONS - MARCH 1979 EDITION • AIAO 01979 - THE AMIRICAN INSTITUTE OF ARCHITECTS, 1733 NEW YORK AVE., N.W,, WASHINGTON, D.C. 2DO06 G710 —1979 11�1 MODIFICATION MiPOSAL NO. 137 KIRTLEY Project: RENTON SENIOR HOUSING - JOB 9313 COLE • ASSOCIATES, INC Date: February 9, 1993 ren oontreatnn p.o. boa 1179 To: THE ORB ORGANIZATION, INC. 1042 - 10th Iaehomish wuh. 98290 Wtiated by: (206) SW3175 Modification Proposal: Credit for owner furntshad (32) Radon Monitors: (32) U. 0 6.93 WSST on materials (S-221.76 X 8.2%) Subtotal ....................... Total Reason for Modification: Cost: Additional: 50.04 Cradiu: $239.94 Nat: Chanp In Calendar Hare: -0- Approved Reject Recommendation: for C.O. Architect General Contractor Owner hlodll'cation Proposal Incorporated Into Change Order Number: 37 Attachments: City of Renton - P.O. 970208 No acdon will be takan regrrding this item until we receive wriae t sutwriration directing us to do to, Ail corurhrct work wi71 proceed on Wul schedule. PROPOSAL NO, ONE HUNDBED-M -221.76 .18.18 S-239.94 S -x39.94 $-239.94 fa':'. iZF gN PAPS' Z TEL No .27755:3........... -Feb' ..4 . Z' .1 :42 No .005r P .02 City of Renton 200 MITI Avenue South Renton, Washington 98065 200.277-5527 Vince Lee, Project Manager Purchase Order #74208 Cavelier Corporation 8820 44th Street Spokane, WA 99206 1-800-323-3853 (FAX 1-509-928-t3689) Qty; (32) 3 -Month Etched Trach Radon Monitors Price: $6.93 ea. plus sales tax Account #: 3191COOi20.596.91.65,01 U4/Zi/as UO! *d �p�unannrvta �•� ltChi�Cd aK llati �uulitil3 MODIFICATION PROPOSAL NO. 138 KIATLEY .� COLE • project: RENTON SENIOR HOUSING - )OB 1315 ASSOCIATES, INC gemal Date: February 24, 133 oontrteprs p.e. bo: 1179 To, THE ORD ORGANIZATION, INC. 1OC2 - I" jnohflnYllh with. 91290 Inidated by: Architaet (Iva) 568-3175 Madirleatiun Proposal: Deleio the requirement for Installation of roadway speed bumps as per Proposal Request #70 Revlted: rA.A. Segale, Inc. -172.00 Subtotal -5-272.0(} S-271.00 Total Reason for Modillemdon: o;ea/'o.pjrc. -V0eT7-* 70,e Cost: Additional: $0.00 Credlu: $272.170 Net: Change In Calendar Days: -0- Rowmmendation: Architect General Contractor Owner IModinLadlun Proposat 11"rparatcd Into Change Order Number: .37 AttrclanentV M.A. Seyaic, Inc. - Proposal dated 2115193 Nn arlicn will be Laken raaardinj dAS Ism until wo rucclva wriUm au:hori►Blinn directing uK Ln do an. All contract work will ivocobd on its normal schedule, •� PROP03AL NO. 9149 HU14-DBED S-272.00 ADDIT► RIVAL WORK AUTHUAIZATION M. A. SEGALE, INC. / ASPHALT DIVISION P.O. Box U050 • 18500 8outhce ! T Prrkwsy TukwI1M, Welhxnyton 011186 - {2061670.0150 OWNER'@ NA14" Kirtley - Cole Associates, Inc. OATxt February 161 1993 xTRSiT, PO Box 1179 J09NAMCI Panton SWor Housing CITY1tTATit Snohomish, SIA 48290 wMepTh 91.61 KE 16th. Street "'ON'1 558-3175 olty/VA.Ia Renton CIN-DATEt for NO.r 8301 You tare hwelQy outherixed to Neri'erm the fellevving specifltally dwerlbed imW109W ww6 PROPOSAL REQUEST 070 REVISED DELETE a SPEED RMS Labor*--+-�•-__.--__�.r«.............($119.00) Materials Ill Equipment—woo-----------($142.00) Tax w-rw--.1- --------------------------- ($ 12.00) ADDITIONAL CHARGE FOR ABOVE WORK IS $ (5272.00 PAYMENT WILL Bi MAPS AS FOLLOWS, ABOVC ADDITIONAL WORK TO be PCIRFORMED UNDER SAME CONDI rICNS AS SPECIFIED IN ORIGINAL CONTRACT UNLESS OTHERWISE STIPULATED, D111 110— Authotlilnts"Sturs MON N I9NI1!lMil WS HER[" AQA IRE Nk NOR A MATERIALI UTI I DANCE WITH THS AeOV6 9PECIFICATIONS, AT ABOVE GTATE RICO. Aumotlted Slpnitutl Olte 14 1Q HTRACT*A 23ONI HIREI THIS IS CHANGE ORDER NO. NOTE: "41 Rwnlsn Mtiynu ",I of, and 1n 4"Ief"wM with, Me 40411011 "mrov. T 10 PROPOSAL REM,; EST Omg+ct Name: RLNTON SENIOR HODS$ 3 PROPOSAL REGUEST NO.: 70 Rev. Pro]act Addreae: 3151 NE pith t;treel Renton, Washington 98050 OWNER: City of Renton DATE: February 5, 1693 Rnv. February 10, 1993 TO: {Contractor) K'RTLE-Y-COLE ASSOCIATES COR CON i PACT NO.: CAG 095-91 1002 - 10th Street ORB project No.: 9007 Snohomish, Washington 93290 Contract For. General Coristructicr, Contract Date: October 31, 19111 Please submit an Itemized quotation for changes In thrt Contract Surn andlor Time mcldental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Descriptiarr. (Written description of the work.) Delete the requirement for Installation of roadway speed bumps as listed below: e (2) speed bumps In parking lot area . see Exhibit'A Revised. speed bump In'ioop' road - see Exhibil'B' 0 Attachments: (Ust attached documents that support description.) Exhibit'A' - sketch [Revised) Exhibit 'B' - sketch OWNER. City of Renton BY: ...... • .. t 1J;• �,' ��r ;'• l' , ^fir^�.r..•. ' . • "�...�ht�.^•... - , •..p►..-.r....r,�; •,'fir- .. . ".""'�*"�+T7�"r''.'tT..t _"`�..�..... rn +LL plCDr'GGrlr�'t�i �T PW • ,t .� I FWCJK P'ih vN ., f 1 rTVmcno4 �.ur _„�,,• t-Cft�Yafw AI -vc GC )KM G fLAGKlrE DE5(—' KJI' OL C �°PasA�. ur av. 0 €r BY NI � I azo I �r v � 2014 .4 N !Adden. 036-93