HomeMy WebLinkAboutCO 39 revisedCHANGE ORDER
Owner
Architect
COR Farm
(This form is to be executed in triplicate and each party is to retain an original.)
Contractor
Project Name:
RENTON SENIOR HOUSING
Date:
Change Order Na.:
March 19, 1993
Thirty-nine (39) Revised
Project Address:
3151 NE 16th Street
Contractor Name:
KIRTLEY-COLE ASSOCIATES
ORB Project. No.:
COR Project Ido.:
9007
CAG 095-91
& Address
1002 - 1 Oth Street
Snohomish, Washington 98294
Contract For.
General Construction
Contract Date:
October 31, 1991
The Contract is hereby amended as follows:
1. Per COR Proposal Request #72, 2125193 and Kirtley-Cote Modification Proposal
0144, 312193 (copies attached): 'Credit for installation of (2) non-standard street Subtract (-$1,000.00)
light poles '
2. Per COR Field Directive #43, 2119193 and Kiriley-Cole Modification Proposal #146,
312193 (copies attached): 'Provide replacement sign at common area kitchen range.' Add 81.95
I
TOTAL CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: I ..................................... Subtract $918.05
4
t The Change Order shall include all Contfactor(s) labor, material, overhead, profit, and all direct andlor indirect costs associated
with the Change in Scope of Work.
This Change Order is not valid unless signed by the Owner, Architect, and Contractor.
$4,620,765.00
The Original Contract Sllm was.............................................................................................................................710.239.27
Net Change by previously authorized Change Order(s) was ......................................................... ..................5,331.004.27
The Contract Sum prior to this Change Order was........................................................................... ...........3 1, 08.05)
The Contract Sum wil' by revised by this Change Order In lfha amount o1 ................................................ .$5.33-918. 22
The new Contract Sum incorporating this Change Order will be...................................................................... $5.3 .0 days
The Contract Time will be changed by.................................................................................
....................
..............................................February 13, 199
The Substantial Completion Dale including this Change Order is ce Change Orders #12, 18, 19. 33, 34 8.36 for TBD items.)
NOTE: The above summary does not include any changes in the Contract Sum or Contract Time which have been approved
by ORB Form 301 - Construction Change Directive or OrNner"s Field Directives.
R DEPT
THE ORB ORGANIZATION, INC.
607 SW Grady Way, Suite 210
Renton, 7Washington 98055
�•F
IC at William, AIA
f
Date
KIRTLEY-COLE ASSOCIATES
1002 - 10th Street
Snohomish, Washington 98290
rdon Cole
=� !
CLZ
Date
CITY OF REN I UN, P rl
200 Md! Avenue South
Renton, Washington 98055
Vincent Lee
Z
Q
n
m
-=1 'Tr
NM
vm
C
M
On
c
m
mm
�Z
C
O -n
M
ou'
C o
K COP
{7
-1
Z
O
0
m
KIRTLEY f NIODIMATION PkiPOSAL NO. 144
COLE • Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
scr,cr,i Date: March 2, 1993
contractors
p.o. box 1179 To: THE ORB ORGANIZATION. INC.
1002 - 10th
snobomish
wash. 9e"90 Initiated by: Owner
(206) SW3175
Modification Proposal: Credit for installation of (2) incorrect non-standard street light poles as agreed by City of
Ren.on Public Works:
Rob's Electric, Inc.
.1.'000.04
y
Subtotal , . ........ .. , ... .. S-1,400.00
4S
Total 54.000.00
Reason for blodifieation: as per PROPOSAL REQUEST 172
Cost: Additional: SO.00 Credits: 51,000.00 Net: 5400.00
Change In Calendar Days: -0-
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
lilodincltlon Proposal Incorporated Into Change Order Number: 39
Attachments: Rob's Electric - proposal
No action will be taken regarding this item until we r0ccive Written suthoriation directing us to do to.
All contract work will pra:ced on its normal ALule.
aP05ONE NUNDREI
L
KIRTLEY-COLE ASSOCIATES, INC.
1001. 101h Str##VP.O. fox 1179, Saabocnlrh, WA 99290
)'fine• (;G6) 561.3173/FAX (106) 5447919
Febru>iry 25, 1993
RIF -QUEST FOR 229 -P -0S A i._
RAY
SUB/SUPPUER: R08'S ELECTRIC, INC. GORDY
ESTIMATOR
ARCHITECT
ATTENTION: Rob SUPERINTENDENT
ACCOUNTING
PROJECT: RfiNTON SENIOR HOUSING DEBBIE
30B NUMBER: 315 DIANE
DESCRIPTION OF FAX TO COMME`ITS
WORK: 9)i per PROPOSAL REQUEST #72, attAched
RESPOND BY: AS SOON AS POSSIBLE
TOTAL AMOUNT (.it 10m.00
CONTRACT TliufE REQUEST DAY(S)
MSR1lt1 MAX txrMvx /►lcf u rix! AYx ADtt�
0 IM �Oy*/AL XXYtXCTf ALL Or TIM M011 t�vllt.Vt:1t 11.0 VYIt1f1. ANY CAM nr 1,t 1�v1, 1, ►�R+ GCJi
AMY lUp" ti*`F.CTt RSC turn MAW.
AUTHORIZED SIGNATURE;
DATE:
SIGNEDI R