HomeMy WebLinkAboutCO 01CHANGE
ORDER
A 1 DOCUMEAT 6701
PROJECT: penton Senior dousing
(name, addresr.)
TO CONTRACTOR:
(nacre, add,ess)
ICirtley - Cale
1002 IOLh St
Snuhomish, WA 95290
The Contract is changed aA follows:
�. CIG -095-91, Adden. 11-921
OWNER 0
ARCHITECT ❑
CONTRACTOR ❑
FIELD G
OTHER
CIIANGE ORDER NUMBER: 1
DATE: January 8, 1992
ARCHITECT'S PROJECT NO: 9007
CONTRACT DATE: October 31, 1991
CONTRACT FOR! General Construction
CAG 1095-91
Add estimated Washington State Sales Tax into Contract Sum
as described in Modification Proposal (11.
ADD TO CORTRI= SUM .................. ...•...$208,772.50
Enclos,are: Modification Proposal No. 1, 1 page.
Not valid until slgned by the Owner, Archilod rand COntract0r.
Tho_ onginal(Cont ractSum) 1'j�ttlaVli. . ......... i 4,620,765.00
Net Change by previously authorized Change Orden ........ ... ! 0.00
The (Contract Sum) rt ipftlJlh cc+ltxx) prior to this Change Order was—.. 1 4,620,765.00
The (Contract Sure) (%tlffAds;44k ln19Nft9Prif iSd %W be (Increased) (4ffiW $V
a4Yf *fflBtopy this Clangt Order uh the amount of .. I ............ . ....1-1—.1
208,772.50
The new (Contract Sum) i ►jEftlJ if3E !'1ifc�[1f11} ltsrluding this Change Order wdi be .. $ 4,829,537.50
The Contract Time will be (Ij�};��jfS�) (
unchanged)by ( 0 )days.
The date of Substantial Complet,on As Of the date of this Change Order therefore is October 14, 1992
NOT1:. This summary does not rrflerl Oungm In rhe COnlrart Sum, Cunrrad Time of Guaranleed MIlUmum PM which haMe been ourhntlted by
Conslrualon Change Direru+'e.
Kirtle -Cole Assoc. Inc. City of Renton. P&R
The ORS Organization CANTRAC�R OWNER
200 Mill Ave S
AHCIiITEGT
607 SW Grady Way, Ste. 210 1002 10th St
Addree AddrcY
AddrarsBnoho h t1� 8290 Renton, WA 98055
Re 4A-nt 98055
/ ej, BY
BY BY ?
A anuary , 1992 DATE DATE -1.4
uu► ooallrxr anon E;uu+rI. ORDM • 1967 tvrnoN Al 1s 01967. TNI (3701-1987
Ma111CAN UGTtTIM 6F ARLjln CT$. 1711 N[W YOKK AT, Nw. WAsH04GTON, nC. 70066
WARMNO: Unrrum•d pholocopying 00111M U.S. snpYAght W a and Is R16ilid to Ispat prosscu,Fon.
MODIFICATION PROPOSAL
KIRTLEY
COLE i Project: RENTON SENIOR HOUSING -JOB N315
ASSOCIATES, INC
p,,cra Date: December 16, 1991
contractors
p.o. box 1179
1002 - 10th To: THE ORB ORGANIZATION
Snohomish
wuh. 93290 Initiated by:
(206) 563-3175
Modification Proposal: Additional estimated costs for Washington State Sales Tax (8.2%) -
on -Site Materlals/Equipment - $2,509,435.45
Off She Materials/Equipment - 36,570.70
TOTAL $2,546,006.15 x 8.2%
NOTE: AN ACTUAL TAX ACCOUNTING WILL BE COMPLETED AT END OF JOB,
ANY NECESSARY ADJUSTMENTS WILL BE DONE AT THAT TIME.
Subtotal .. ... .. .
Total.................. I.......... .
208,772.50
$208,772.50
$208,777.50
Reuson for Modification:
Cost: Additional: +208.772.50 Credits: S-0. Net: 5:08.772.50
Chunge In Calendar Days: -0-
Approved Reject
Recommendation: for C.O.
Architect
General Contractor
Owner
Modification Proposal Incorporated Into Change Order Number:
Attachments:
No action will be taken regarding this item until we receive written authorindon directing us to do to,
Ail contract worts will proceed on its normal schedule, PROPOSAL NO.