HomeMy WebLinkAboutCO 046
CHANGE _ OWNER
ARCHITECT
ORDER CONTRACTOR
FIELD
A 1 DOCUhfrN7`G701 OTHER
PROJECT: Renton Senior Housing
(name, address)
TO CONTRACTOR: Kirtley-Coln
(name, address} 1002 10th St
Snohomish WA 96290
The Contact M changed as follows:
:AG -095-91, Adden. 04--92
❑
0
❑
❑
CHANGE ORDER NUMBER: 4
DATE: February 19, 1992
ARCHITECT'S PROJECT NO' 9007
CONTRACT DATE: October 31, 1991
CONTRACT FOR: General Construction
CAC?' --7x'91
Add work to the Contract as described in Kirtley Cole Modification Proposal
7R enclosed herein.
Add to Contract Sun, ............ ................. 5101,964.00
Not Volld until signed by the Owner, Architect and Contrector.
The original(Contract Sum) (GHVMXA14i 9xXRR1W-)wn . • ................... • . i 4, 620, 765.00
Net change by prevtou,ly authorized Change Orden ............... I .............. = 3OXYXM 362,133.76
The (Contract Sum) (Glrptsr(HtA b►�1rRtl(xRNot) pnor to this Change Order wu.......... I 4,X3 )oom }= 4,982,89B.76
The (Contract Sum) 6Cg"pAKRdtiltNtiFti WkftX) -LU be (incrcised) (IWAM&
(}tRjh}g by this Change Order to the unount of ............................ f 101, 964.00
The new (Contract Sum) (4 W0 j j lndudl ;t this Chiang Order will be . ,1 = 5, 064, 862.76
The Cuntract Tlme will he (Increased) (decreased) (unchanged) b,,' ( 0
ase
The date of Substantial Completion as of the date of this Change Order therefore b
NOTE: This sumrrury dod not reflect changes in the Oinuxi Sum, Contact Ttme or Guaranteed MIUMum Prue w,hlch have been authorised by
Grnstrucuon Change Dtrectivc.
THE ORB ORGANIZATION, INC. KIRTLEY - CULE ASSOC., INC. CITY OF RENTON, P&A
ARtiCrECT CONTRACTOR OBER
1002 - 10th 5trse': 2Or7 :dill Avenue South
607 SW Grady Wey, #210 --�—�— Address
Address Addrem nto
rr O 9
ef� �.nnhn�mtqhY
BY By C® LYrf�
e
f�a iam, AIA G r LZ
1!5172 DAi� r
t
nu oot UMVfr =1 • MANCE ORDER 'e7 Epmorr � AiA• � 01"7 •rats G701-1887
Amu,jw INS1TnM or AmcKrrEcn, t'n7 KW YORK AVL 14V, TA5MGTON. Dr- zom
WARNING: Unllcent•d 1he'ecbVV"9 vro4ta U.S. capynght IrWl xnd 18 wbl"I 10 IeQ�I ptmrcvtFpn.
MODIFICATION PROPOSAL
KIRTLEY
COLE i Project: RENTON SENIOR HOUSING - JOB #315
ASSOCIATES, INC
general Date: Feonuary 14, 1992
contractors
P.C. baa 1179
1002 •loh tTo: THE ORB ORGANIZATION
anchomuh
wish. 98290 Initiates! by: Architect
(206) 366.3175
Modification Proposal:
1, Add six apartment units to the number taken at contract signing (Alternate Bi. 2, in lieu of S89,964.00
Alternate Bid 4) _
2. VOID _
3. Add "Walk 1" and "Walk 2" Into contract work (Alternate Bid 8) 1 012,000.00
ADDITION OF SIDEWALK DOES NOT INCLUDE COSTS TO REMOVE STOCK
PILED EXCAVATION `.JATERJIAL AT WALK LOCATION.
THIS PiLUPOSA.L DOES NOT INCLUDE WSST, WILL BE FORWARDED AS SOON AS
COST INFORMATION IS AVAILABLE
Subtotal
$101,464.00
TOW .. . f, $101,964.00
leason for Modificatlon: as per PROPOSQ REQUrSl N6
Cost: Additional: $101,964,00 Credits: S-0- Net: $101,964.00
Chrnge in Calendar Days: -0-