Loading...
HomeMy WebLinkAboutCO 07CJ1a.•II,e34c' Avts.�•'r•�. CHANGE ORDER Owner— ORB Form 300 Architect MIs form Is to be executed In triplicate and each party Is to retain an original) Contractor Project Name: R.ENTON SENIOR HOUSING Date: Change Omer No.: April 15: 1991 7 Project Address: 3151 NE 16th Street Renton, Washington 98056 ORB Project No.: 9007 Contractor Name City of Renton No.: CAG #095.91 do Address: Klrtley-Cole Associates, Inc. Contract For Contract Date: General Construction October 31, 1991 1002 - 10th Street Snohomish, Washington 98290 The Contract Is hereby amended as foilows: 1) Per VJrdey-Colo Modification Proposal No, 15 dated March 31, 1992 (attached), ADD S 193.96 add 3-1/2 x 13 Glu -lam at east side of 11" concrete wall a: Rooms 208, 228 ......... .• .. . 2) Per Kiriley-Cola Modification Proposal No. 17 dated April 6, 1992 (attached), ledgers at elevators rejected, Provide metal grate covers with exposed bolts ADD 295.60 at elevator pit dry sumps. . . ................. ................................. I .......... 3) Per Kirtley-Coln Modification Proposal No. 16 (attached), modify column bauADD 323,7 plates at pipe columns at doors 58 and 61 .................................. ....... SUBTOTAL. S 815.91 4) Delete the addition of six (6) apartments as described In Change Order No. 6 (payment for work done for this change shall be paid for under a subsequent Change Order) DEDUCT 89.353f� TOTAL. CONSTRUCTION COST IMPACT OF THIS CHANGE ORDER: DEDUCT <S188,538f3 The Change Order shall Include all Contractors) labor, material, overhead, profit, and all direct and/or indirect costa associated with the Change In Scope of Work. This Cbanp Ordtj Is not vs ld unless sl ped by the O eT Architect, and Co hector. ,This Change Order shall include the correction to the price discrepancy between Change Orders 5 and 6 for $29.00.. The Original Contract Sum was ............................... • . • • • • • • • • • • • ....... I I I S4,620,765.00 Net Change by previously authorized Change Ordct(s) was ............. I ...................... ...659,046.71 The Contract Sum prior to this Change Order was ................................... I ....... , .. 5,279,811.71 The Contract Sum will be decreased by this Change Order In the amount of ........ I .. • .. <188,538.62> The new Contract Sum incorporating this Change Order will be ...................................... 1 5.091,273.09 The Contract Time will be decreased by 30 days. The Substantial Completion Date including this Change Ord ci la November 26,1942. THE ORS ORGANIZA�Tfi6N, INCL, Architect Kirtloy-ColtsAssociates, 607 SW Grady Way, 9(4t*4 �! 1002 JO IyStr�r_t _^ .' i I ////l'" N L Date Date C/ L ractot City of Renton, Parka and Recruttion, Owner 200 Mill Avenue South Renton, WashluSton 98055 Vincent C, Lw 23 die Page IofI 0 N O 0 M MODIFICATION eROPOSAL KIRTLEY COLE • Project: RENTON SENIOR DOUSING - JOB #315 1 ASSOCIATES, INC genera Date: April 2, 1992 contmeton p.o, boa L179 To: THE ORB ORGANIZATION 1002 - 101h tnohomish wash. 98290 Initiated by: t206) 565J 17S Modification Proposal: Add 4 X 10 ledgers at either side of elevator shaft walls at sill height. Add expanded metal to cover dry sump, bolted to concrete. 4 X 10 ledgers to be solid blocked from top of wall to floor sheathing: (2) Metal grates/(B) concrete lags 112.00_ Labor - pick up materialsllnstall grates (5 hours a 28•00/hr.) 140.00 —t,�B9-99a Subtotal • • • • 's Overhead do Profit Q 15% • • .. • :5'7 9 3 _3244-B9 Bonding 0 2% .. . , ...... , .... .......... -637.5 Total ... ? 4 Reason for Modification: required by Sound Elevator, not on drawings Cost: Additional:-t1,9t+}+t' CreaiW, $-0• Change In Calendar Days: ONE (1) Approved Reject Recommendation: for C,O, Architect General Contractor Owner hiodifiication Proposal Incorporated Into Chunge Order Nurnher: Attachments: No action will be taken regarding this item until we receive written authoritstion directing a to do to. All contmer work will proceed on its normal tchedule. PROPOSAL NO., I MODIFICATION 1 OPOSAL KIRTLEY COLE • Project: RENTON SENIOR HOUSING -10B +315 ASSOCIATES, INC genera Date: April 2, 1992 contactors p.o. box 1179 To: THE ORB ORGANIZATION 1002 - loth snohornish wash.. 98290 Initiated by: t-06) 568.3175 Modification Proposal: Doors #58 and X61 Interfere with the column base plates. RFI addresses this interference. Bill Chan has approved the corrective measures shown on RFI 49. Approval to proceed with this work and for the additional costs associated with changing the column plates is requested: Welder - 6 hours 0 46.001hr. 276.00 Subtotal . ... .... .. $276.00 Overhead & Profit * 15% .. . , . • • S41.40 56.35 Bonding tin 2%--- .......... Total .. 5323.75 Reason for Modification: Cost: Additional' $323 75 Credits: S-0- Net: S323.75 Change in Calendar Days: -0- Approved Reject Recommendation: for CA Architect General Contractor Own!r t Modircntion Proposal Incorporated Into Change Order Nvmber: Attachments: No action will be taken regarding this item until we receive written authoriution directing us to do so. All contract work will proceed on its normal schedule, PROPOSAL NO. t1. MODIFICATION PROPOSAL KIRTLEY COLE • Project: RENTON SENIOR HOUSING - JOB #315 ASSOCIATES, INC gena Date: March 31, 1992 contractors p.o, boa 1179 toax •tout To: THE ORB ORGANIZATION snohomiih wash. 98290 Initiated by: (706) 568-3175 ModIncation Proposal: RFIp60: Bill Chan has indicated that 3.118 X 13-112 glu-lam ledgers are needed along the concrete wall at Units #208 and 9228 to support the TII"s. Ills will result In an add of 16 I.f. of GLB and (8) T1I hangers: GLB - 16 I.f. 0 8.0011f T11 hangers - (8) ea. 0 3.30le3 WSST a 8.2% of materials (S154,40) Subtotal ..................... Overhead & Profit 0 15% Banding a 2% .. • • • Total • Reason for Modincatlon: Cost: Addltionai: $195.96 Credits: $- Ner. Change in Calzndar Days: -0- Approved Reject Recommendation: for C,O, Architect General Contractor Owner Modification Proposal Incorporated Into Change Order Nu mher: i Attachments: No action will be taken regarding this itcm until we receive written authorisation us to do to, All contract work will proceed on its normal schedule. PROPOSAL NO. 128.00 26.40 12.66 $167.06 $25.06 $3.84 S195.96 $195.96 m