Loading...
HomeMy WebLinkAboutLUA 01-134_MISC.. ! / I c, -I :: ' I ( l{ . Renton Jiffy Lube King County, Washington Technical Information Reporl Prepared For: ADF Properties, LLC vVooilinYille, W ashlngton Prepared By: l\!Iaher Abed, P .E. Pacific Engme:ering Design, Inc. December 7, 2000 PEDI Job No. 97010 TECHNICAL INFOR.-i\1ATI0N REPORT For Renton Jiffy Lube Renton, Washington Project No. 97010 Prepared for: ADF Properties, LLC 15007 Woodinville-Redmond Road, NE Woodinville, WA 98072-6988 ,---... ·> .. ~c:.·' ' Prepared by: Pacific Engineering Design, Inc. 4800 S. 188th Street, Suite 360 Seattle, WA98188 (206) 431-7970 December 6, 2000 - SECTION 1.0 2.0 3.0 4.0 5.0 A B C D E F TABLE OF CONTENTS SUBJECT Proposed Project Description Existing Condition Off-site Analysis On-site Detention and Conveyance Analysis On-site Water Quality Analysis Appendices Vicinity Map Pre and post developed conditions map Existing Soil Condition Storm water Detention Calculation Water Quality Facility sizing Calculation Backwater Analysis Data 2 1.0 Proposed Project Description: The project site is a rectangular shaped parcel located in the Southwest Quarter of Section 3, Township 23, Range 5 East, W.M., King County, Washington. The parcel is 0.82 acres in size. This project is assessed via Sunset Highway. The project will consist of a combined 13,480 Square Feet of Commercial and multi-family space in two detached structures. Approximately 12,994 square feet of pavement and sidewalk surfaces will be created. The project v.ill generate a total of 45 parking spaces on the site. The development will utilize the existing frontage improvements along Sunset Highway. However, on-site improvements shall include looping a 10-inch water main from 12-inch Sunset Highway water main to 8-inch Anacortes Avenue water main, Installation of storm water detention and treatment facilities, parking lot paving and landscaping in accordance with City of Renton development standards. The storm run-off from new impervious surfaces will be collected and conveyed to a wet vault that will provide adequate detention per King County Drainage Manual-1998 Edition. From there, the metered release will be discharged into a grass-lined swale which will treat the 2-year 24- hour storm flow with adequate provisions to convey the 25-year 24-hour and the 100-year 24-hour storm events without overtopping. The treated storm water will be released into an existing wetland south of the site. The storm water will ultimately flow into the existing channel of Honey Creek. - 3 2.0 Existing Conditions: The parcel is 0.82 acres in size and generally slopes to the south. Grades are not very steep and they range from I to 5 % slopes. Existing vegetation includes large Fir trees and low laying shrubs. Other than an existing wetland (0.07 acres), a regional urban creek, which flows east to west, crosses the property in the southern portion of this site. The site exhibits good drainage with no apparent ponding problems observed. The soil on the site consists of mostly Alderwood Series predominately Everett gravelly sandy loam, which overlies consolidated glacial till layer. The site generally slopes in the southwesterly direction. The preponderance of the site drains via sheet low to the low area at Honey Creek southwest of the property. Any concentrated flow will ultimately drain into the existing wetland south the proposed development. Downstream Analysis: The flow from this site will be discharged from the grass-lined swale into the existing wetland south of the development. From there, it will drain into the existing 30-foot wide channel of Honey Creek, which drains a concentrated upstream storm flow from the Kinder care Building. This flow daylights into an 8-inch concrete storm pipe in the eastern comer of Honey Creek. Based on my field observation, the channel is well developed and it does not exhibit any signs of erosion. Our flow will then drain east to west into an existing 40-foot 71 "x47" CMP arch pipe. From there, the flow will then discharge into an open channel for approximately I 00 feet where it will be collected into a twin 58"x36" arch culverts underneath the Glencoe plat. From there, the flow will daylight into existing drainage ditch and it will ultimately drain into an existing culvert underneath Sunset Highway. The existing downstream system does not exhibit any visible signs of flow restriction in performing its drainage conveyance task. - 4 3.0 Off-site Analysis: The properties around the site have developed their own storm water control facilities and as such it does not discharge any surface run-off into this development. Field visits to the site did not reveal any surface flow entering the site and there were no visible signs of ponding. Additionally, the adjacent properties, similar to our development, tend to drain their surface run-off southerly following the general grade of the topography round the site. Therefore, no off-site flow was taken into consideration in the design of the storm water detention and water quality facilities. - 5 4.0 On-site Detention and Conveyance Analysis: The project is required to provide on-site storm water detention. Since the project lies in the Honey Creek watershed, the City staff had required the design to meet King County Drainage Manual-1998 Edition. Because of lack of available space on the site, the development will utilize a wet vault designed based on the above standards to provide the required detention. Using the KCRTS software for level 1 design standard, the vault size will be 20'xl OO'x3 '. It is designed to detain both the 2-year 24-hour and the 10- year 24 hour storm events to their pre-developed rates. The conveyance system has been designed in accordance with King County Drainage Manual, which requires the conveyance of the 25-year 24-hour storm event. The analysis has been completed using King County Backwater software. The upper Limits of the analysis are established as follows: 1. Minimum limit is based on the 25-year, 24-hour storm event, which is 0.50 cfs. 2. Maximum limit is based on the 100-year, 24-hour storm event, which is 0.58 cfs. Our analysis (see Appendix F) has shown that the project conveyance is adequately sized to handle both the 25-year, 24-hour and the 100-year, 24- hour storm events per King County Drainage Manual requirements. 6 5.0 On-site Water Quality Analysis: Using "Waterworks" hydrology software, which employs Santa Barbara Urban Hydrograph methodology and SCS type lA rainfall distributions, on- site storm flows for the development are modeled and the results are as follows: 1. Run-off for the 2-year 24-hour storm event= 0.27 cfs 2. Run-off for the 100-year 24-hour storm event = 0.58 cfs. Site run-off is treated using a bio-filter swale installed upstream of the existing wetland on the property. This facility consists of 150 lineal feet of grass-lined swale, which is designed to filter out pollutants from the 2-year storm flow. Additional capacity is provided to enable conveyance of up to the 100-year storm flow. "Civil Tools" software utility for man made channels was used for sizing a swale cross section which is trapezoidal in shape, has side slope of 3: 1 and a flow path slope of 1.0%. The utility determined that a 6.0-foot flat-bottomed swale with minimum depth of 1.25 feet is needed (Resultant 2-yr storm flow depth= 0.06' and 100-yr storm depth =0.09'). Therefore, depth required= 0.06'+ l.0'=1.06' say 1.25' minimum. 7 APPENDIX A - PRO..ECT NCL; 97010 DR.A~ SY: GMH ISSUE DATE: 12-07-00 EXHJBIT \ OR liAP \ w z w > I ~-----J z 0 z :::> "--,....__ -~St..' s~ _............., _, SITE w (/) !s' ~ L-------.- ~ I-co I"") .... VICINITY MAP N.T.S GI'~ Civil Engineering and Planning Consultants - MAIN a:HCE: 4800 S. 1331H ST., .SUITE JeO SE>, TilE, WA 98188 PHONE: (20ei) ..:51-7970 FAX: (206) -01-7975 - APPENDLXB ... ;;ii I ~ I" .... ..... i • I • is ... ~ ! ~ PRo...ECT NO.: 97010 ORAMil BY: GMH ISSUE DATE: 12-07-00 EXHIBIT 2 OR MAP 2 PfE DEi/ELOPED MAP --.:.aa • LO NV.=J76.7 J '---~SDMH R!M=J89.4 .... • .. ........ C: ~,~, ... , ~:~g ~~gn,Inc. Civil Engineering and Planning Consul'"""' MAfl OFFICE: 4800 S. 115811-1 ST_ SUITE 360 S£AT1l£. 'IIJ. 98188 PHONE: (:206) 01-7970 FAX: (2Dl!i) "'4'1-7975 20MH PRo..ECT NO.: 97010 ORA~ BY: CMH ISSUE DA TE: 12-07-00 EXHIBIT 1 OR MAP 2 . ...,._ __ .c:;0MH RIM=389 4 .-. ~ ; ,r••'.,;. .··. ..;,~:, .. ,i ,. ,-,· .... -~:.';,.·1.::..:s ;,-...... :'J..~ !kt::~ ~ .:3.~;s • c.~S> ·····-···-J~·---·-······ ··"' ..... , '7 (")"' C .. t ... u u \ MAIN 0Fria:: 4800 S. 181!Tli ST .. SUI TE 360 SEATll..E. WA 9811!!! PHONE: (206) "'31-7970 FAX; (206) 4J1-= Created on 12/04/2000 2:58 PM P:\Project Files\9701 O\Photos I 2-4-00.doc Page 4 of 5 97-IO Renton Jiffy Lube Created on 12/04/2000 2 :58 PM P:\Project Files\970 I O\Pbotos 12-4-00.doc Page 4 of 5 97-10 Renton Jiffy Lube Created on 12/04/2000 2:58 PM P:\I'roject Files\9701 O\Photos 12-4-00 .doc Page 3 of 5 97-10 Renton Jiffy Lube C reated on 12/04/2 000 2:58 P M P:\rtojecr Files\970 l O\Photos 12-4-00.doc Page 2 of5 97-10 Rento n Jiffy Lube Created on 12/04/2000 2:58 PM P:\P'roject Files\9701 O\Photos 12-4-00.doc Page 5 of 5 97-10 Renton Jiffy Lu be Created on 12/04/2000 2:58 PM P:\Project Files\9701 O\Photos 1:2-4 -00.doc Page l of 5 97-1 0 Renton Jiffy Lube APPENDIX C N 2 Mi les 10000 reel ··"-·• --:.c -"~::_-.. .. ::::.--.~-\~--·: .. .... :..·.:.~ .... :-·· Orthophotobase compiled in 1970 by USGS. Planimetr i c detai l ootained from USGS 7~-minute series :naps. Poiyconic proiection . 1927 North American datum . 10,000-ioot grid based o n Washington coordinate syste r:i, nor,h zone . SHEET N0. 5 1 1ppl ,n s othe trac '-- Loca A )n t This phot •i th a -outl mark ;oil ~$ e -pain :ind T ~nfo _ ::.ing and of e Iese 'OT I suit ,any ;oil cent soil gravelly coarse sand to very gravelly loamy sand. Depth to the IIC horizon ranges fTom 18 to 36 inches. Some areas are up to 5 percent included AldenJood soilsJ on the more rolling and undulating parts of the landscape; some are about S percent the deep, sandy Indianola soils; and some are uu to 25 percent ~eilton very gravelly loamy sands. Ai.so incl~ded in mapping are areas where consolidated glacial till, which characteristically underlies Alderwood soils, is at a depth of S to 15 feet. Permeability is rapid. 1ne effective rooting depth is 60 inches or .more. Available water capac- ity is low. Rtm.off is slow, and the erosion hazard is slight. This soil is used for timber and pasture and for urban development. Capability unit IVs-!; woodland gr9up.'.3f3. __ ....----·--...----~ -~,,--- Everett g:::avelly sandy loam, 5 to 15 percent slones (EvC) .--111.is soil is rolling. Areas are irregular in shape, have a convex surface, and range from 25 acres to more than 200 acres in size. Rtm- off is slow to medium, and the erosion hazard is slight to moderate. Soils included with this sOil in mapping make up no more than 25 percent of the total acreage. Some areas are up to 5 percent Alderwood soils, which overlie consolidated glacial till; some are up to 20 percent Neilton very gravelly loamy sand; and some -are about 15 percent included areas of Everett soils where slopes a.re more gen~le than 5 percent and where they are steeper than 15 percent. This Everett soil is used for timber and pastuxe and for urban development. Capability unit VIs-1; woodland group 3f3. Everett. gl'avelly.-s.indy-·1o·a:m, 15 to 30 percent slopes (EvD).--This soil occurs as long, narrow areas, mostly along drainageways or on short slopes between terrace benches. It is similar to Everett gravelly sandy loam, 0 to 5 percent slopes, but in most places is stonier and more gravelly. Soils included with this. soil in mapping make up no more than 30 percent of.the total acreage. Some areas are up to 10 percent Alderwood soils, which overlie consolidated glacial till; some are up to 5 percent the deep, sandy Indianola soils; some are up to 10 percent Neilton very gravelly loamy sand; and some a.Te about 15 percent included areas of Everett soils where slopes are less than 15 percent. Runoff is medium to rapid, and the erosion hazard is moderate to severe. Most of the acreage is used for timber. Capa- bility I.D'lit VIe-1; woodland group 3-f2. Everett-Alderwood gravelly sandy loams, 6 to 1S percent slopes (EwC) .--This mapping unit is about equal parts Everett and Alderwood soils . The soils are rolling. Slopes are dominantly 6 to 10 percent, but range from gentle to steep. Mast areas are irregular in shape and range from 15 to 100 acres or more in si::e. In areas classified as Everett soils, field examination and geologic maps indicate 26 the presence of a consolidated subst~a"CU:m of 7 to 20 feet. 1his substratum is ~~e rial as that in t..b.e Alderwood soils. Some areas are up to 5 percent include Seattle, and Tukwila soils, all of whic.~ drained. Runoff is slow to medium, and the eras is slight to moderate. Most of the acreage is used for t:..mber ity unit VIs-1; woodland group 3£3. Indianola Series The Indianola series is made up of som, excessively drained soils that foTID.ed und, in sandy, recessional, stratified glacial These undulating, rolling, and hummocky s1 terraces. Slopes are O to 30 percent. 11 precipitation is 30 to 55 inches, and the annual air temcerature is about 50° F. Tl free season is· 1so to 210 davs. Elevatio1 from about sea level to 1,000 feet. In a representative profile, the uooer is brown, dark yellowish-brown, and 1iiht ·brown loamy fine sand. This is underlain sand that extends to a de:oth of 60 inc.~es [pL I, right) . • Indianola soils are used for timber an, development. Indianola loamy fine sand, 4 to 15 uer1 (InC) .--This undulating and rolling SoiTl slopes. It is near the edges of upland ti Areas range from 5 to more than 100 acres Representative profile of Indianola lac sand, 4 to 15 percent slopes, in forest, west and 900 feet south of the nort.heast c sec. 32, T. 25 N., R. 6 E.: 01--3/4 inch to 0, leaf litter. B2liT--O .to 6 inches, brown (lOYR 4/3) lo, sand, brown (JOYR 5/3) dry; massive; very friable, nonsticky> nonplastic; roots; slightly acid; clear, smooth 4 to 8 inches thick. B22ir--6 to 15 inches, dark yellowish-bro" 4/4) loamy fine sand, brown (JOYR 5/ massive; soft, very friable, nonstic plastic; common roots; slightly aciC smooth boW1dary. 6 to 15 inches thi Cl--15 to 30 inches, light olive-brown (2. loamy fine sand, yellowish brown (IC dry; massive; soft, very friable, nc nonplastic; common roots; slightly a gradual, smooth boundary. 12 to 17 thick. C2--30 to 60 inches, olive (SY 5/4) sand, brownish gray (2.SY 6/2) dry; single loose, nonsticky, nonplastic; few ro slightly acid. Many feet t~ick. There is a "thin, very dark brown Al hor the surface in some places. Tii.e 8 hori=cn APPENDIXD - --PACIAC ~NGINEERINO DESIGN INC. --:;J ... ~.,., ) :-:~-/ . --,~; ;.;:; -:: : / ... ' Joe ....... -,..., --~..; '----• --~ CIVIL ENG!NEERJNG AND PLANNING CONSULT~ SHEET NO. I OF CALCULATED BY 1,,J. .~...=-/' °""' I:: -fa -t~C ------------------·---·----------···--------------· .. ·------··---------...• ------·····--·--·----··----~ --·---·--· L_,=t; ... "'X-'-"/_=: (._ ... .,-.,(;:,.,c.-:.l .. 5.c__;.,U,a-"A""'-')"_,_~.,-,"·.""·".,:-".{)"A"~"-;' :__~ : ·--~---··--L ____ : ----··--·--·----···-----~----·-·-~-------·-·-·· ·------··-----··----- 1------·-·------·----------------------·--------------····-•-·---------··--··-·-··--... -· -----------·--·----... -······---. ---·--------··------···--····----· _____________ ,. TJ I L_. p ,b-r;,/_,2:= -~EA-___ ;=_Q;.z"..S ,4,,:~_ ---·----------·-··-__ ____ ___ ···----· _____ _ ---·+.-----~-----;_XQ~A::: .. L.~-•. :l~:=-.r~:i.-.A~-----~--o.! .. c~:: ..... ~/ id ·:; __ ·····-·-··-----···-····-· ______ -•---------,---------------~---------1 . . . ------····--. ------·---·····------··--.. ··-·-----·-------·-··------·----··-··--··~----·-- ---···-------·· ---·----------·-·----·-··--·-------··-·· .. ·----·------·-· .---·---· ··-----···-···-·--·-----.. ·------· ----·-·-----·-. -------. --~-·--·-·-----~---··/-. .'2 ... L~---·----j~~_:.--~tEL~._::;. __ 5~ ~-./ ____ A:~~-~::-. . ' ' .... ~---· -----·-·----.. ·-----··--···---·-··-·--·---·---···-·---· --:r..1_; • . ,,--:: 0 b,-• b ,;;4 •_ •_,,: IU" .,r//7..-..- ----····-·····--·_,. _______ .:;... __ .;_ _________ ¥,L~ . ....,;r~ __ :..,..r.'.".'";sl~---·-~.,,,...---~e,..,,: .. ,._~.L...:.~--..C--...,,(~..:. ····--------·· ·---------· ---·-· ----·--···-- SECITON 3.2 RUNOFF COMPUTATION AND ANALYSIS METHODS FIGURE 3.2.2.A RAINFALL REGIONS AND REGIONAL SCALE FACTORS ST 1.1 ST 1.0 Rainfall Regions and Regional Scale Factors ,. · Incorporated Area -.....c::::J River/Lake Major Road ST 1.0/ LA 1.0 LA 1.2 SMOM<:IMI ··ace· -~---·. ___ ,_-.···-.· ··_.··,_·· __ •• ., LA 1.0 911198 1998 Surface Water Design Manual 3-22 =: PACIFIC ~NOINEEAING DESIGN INC.:: JOB------------- CIVIL ENGINEERING AND PLANNING CONSULTANTS SHEET NO. _________ <l"·--------- (;ALCUL.ATEO BY ________ cw,e J Time Series Computed ------------------------------------------------------------------------------ KCRTS Command CREATE a new Time Series ------------------------ Production of Runoff Time Series Project Location: Sea-Tac Computing Series devOl.tsf =gional Scale Factor: 1.00 Data Type : Reduced rreating Hourly Time Series File Loading Time Series Till Grass 0.14 acres Loading Time Seri~s 2tland 0.07 acres .. ~ Tmpervious Loading Time Series 0.61 acres ,• Total Area 0.82 acres File:C:\KC_SWDM\KC_DATA\STTG60R.rnf Scaling Yr: 8 File:C:\KC_SWDM\KC_DATA\STWL60R.rnf Adding Yr: 8 File:C:\KC_SWDM\KC_DATA\STEI60R.rnf Adding Yr: 8 Deak Discharge: O. 323 CFS at 6: 00 on Jan. 9 in Ye·ar 8 KCRTS Command CREATE a new Time Series Production of Runoff Time Series Project Location: Sea-Tac Computing Series predevOl.tsf !.~gional Scale Factor : 1.00 Data Type : Reduced : :eating Hourly Time Series File Loading Time Series Till Pasture 0.75 acres \ Jtland Loading Time Series 0.07 acres Total Area 0.82 acres File:C:\KC_SWDM\KC_DATA\STTP60R.rnf Scaling Yr: 8 File:C:\KC_SWDM\KC_DATA\STWL60R.rnf Adding Yr: B oak Discharge: 0.097 CFS at 9:00 on Jan 9 in Year 8 Storing Time Series File:predevOl.tsf 8 8 8 8 8 8 =: PAClRC ENGINEERING DESIGN INC.=: JOa ------------- CIVIL ENGINEERING ANO PLANNING CONSULTANTS SHEET NO. _________ OF ________ _ f =· ....... --=: =~ ···_·---~=-=~---·-·-·----~-:-_-. - Flow Frequency Analysis -------------------------------------------------------- Time Series File:predevOl.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--- ·"low Rate Rank Time of Peak (CFS) 0.061 2 2/09/01 15:00 0. 021 7 1/05/02 16:00 0.056 3 2/28/03 3:00 0.005 8 3/24/04 19:00 0.028 6 1/05/05 8:00 0. 045 4 1/18/06 16:00 0.043 5 11/24/06 4:00 0. 097 1 1/09/08 9:00 :__,mputed Peaks -----Flow Frequency Analysis------- --Peaks Rank Return Prob (CFS) Period 0.097 1 100.00 0.990 0.061 2 25.00 0.960 0.056 3 10.00 0. 900 . -·--·-----·--------·-·· ·----0. 045 4 5.00 0.800 0.043 5 3.00 0.667 0.028 6 2.00 0.500 0.021 7 1.30 0.231 0.005 8 1.10 0.091 0.085 50.00 0.980 ·--··--·-·-··-···-·-------~----··-····-····---···--·--·--.. -... -·--~----··-··---·---------------·--------------·-------··-····-···--·-·-··--·----·-·-----·-·----·----~----·--·-·····--·---------------··-----,·- ·--•···----· '--··--·. --·-·----.. --·······-·-------. ···--·-·--~-·-· . . . . ' . . ' --··· . ···--····. ·······-------------··· ···--· ~--·-·--'----··-·--·-·-··-·----- ···-----. ___ . --···------.. ------····-----. ~---------·------------. ·-·-·--·----····-·····-····--··-·----··---·········'------·--------------····--·---·-·--·-- ········-···-··----·····-····-··--···---··· ·············'·--····--·····'·····-·--·-·-·······-··----..;..··-···'··········-·····-···········'··-····--- Fl ow Frequency Analysis -------------------------------------------------------- Time Series File:rdout.tsf Project Location:Sea-Tac ---Annual Peak Flow Rates--------Flow Frequency Analysis------- "low Rate Rank Time of Peak --Peaks --Rank Return Prob (CFS) (CFS) (ft) Period 0.131 2 2/09/01 15:00 0.274 3.07 1 100.00 0.990 0. 025 7 12/28/01 17:00 0.131 3.02 2 25.00 0.960 0.049 5 2/28/03 7:00 0.057 ·3.00 3 10.00 0.900 0.024 8 8/24/04 0:00 0.053 2.78 4 5.00 0.800 0.032 6 1/05/05 14:00 0. 049 2.54 5 3.00 0.667 0.053 4 1/18/06 22:00 0.032 1. 87 6 2.00 0.500 0.057 3 11/24/06 7:00 0.025 1.15 7 1.30 0.231 0.274 1 1/09/08 9:00 0.024 1. 06 8 1.10 0.091 )mputed Peaks 0.226 3.06 50.00 0.980 - _.....=rir,. C ...,==-r1......1 C"T" Cl 11-rc: -:::i=r,. CC:1\-,-,1 c: \/\/ACL.Jl"-lr::"T"r"Jf'-J Oi::::::1-'li:::ii:::i anC::C//l'".'.l-'I_/Q"7r1 i:=1';.V/L1'".'.l4_70"7~ =: PACIFIC f=NGINEERINO DESION INC. = JOB------------- CIVIL ENG!NEERINC AND PLANNING CONSULTANTS SHEE'i NO. _________ OF ________ _ ----····················.~ ········---·-·--··-- Retention/Detention Facility Design Route Time Series through Facility Time Series Found in Memory:devOl.tsf Reservoir Routing [R/D Facility] Years Complete: 8 Peak Inflow Discharge: Peak Outflow Discharge: Peak Reservoir Stage: Peak Reservoir Elev: Peak Reservoir Storage: Inflow/Outflow Analysis 0.323 CFS at 0.274 CFS at 3.07 Ft 103.07 Ft 5874. Cu-Ft 0.135 Ac-Ft 6:00 on Jan 9 in Year 8 9:00 on Jan 9 in Year 8 Storing Time Series File:rdout.tsf 8 Facility Routing Complete ·acility Documentation Stage Elevation Storage Discharge Percolation (ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs) 0.00 100.00 0. 0.000 0.000 0.00 0.01 100.01 19. 0.000 0.002 0.00 0.02 100.02 38. 0.001 0.003 0.00 0.03 100.03 57. 0.001 0.004 0.00 0.04 100.04 77. 0.002 0.005 0.00 0.05 100.05 96. 0.002 0.005 0.00 0.06 100.06 115. 0.003 0.006 0.00 0.07 100.07 134. 0.003 0.006 0.00 0.08 100.08 153. 0.004 0.006 0.00 0.18 100.18 345. 0.008 0.010 0.00 0.28 100.28 53 6. 0.012 0.012 0.00 0.38 100.38 727. 0.017 0.014 0.00 0.48 100.48 919. 0.021 0.016 0.00 0.58 100.58 1110. 0.025 0.018 0.00 0.68 100.68 13 01. 0.030 0.019 0.00 0.78 100.78 1493. 0.034 0.020 0.00 0.88 100.88 1684. 0.039 0.022 0.00 -~~----~----. ---· ··-~ -----·-· -. • . • --· "k ,,....,_,......,k' ................ ,....,....., ....... --..-. , ............ -.~......,.,-, .-,.. ,,,~.-. ...................... = = PACIFIC l!i:NOJNEEAINO DESIGN INC.= Joa------------- CIVIL ENGINEERING AND PLANNING CONSULTANT'S SHEET NO.. _________ OF ________ _ CALCULATED BY ~cility Documentation 0.98 100.98 1875. 0.043 0.023 0.00 1. 08 101.08 2067. 0.047 0.024 0.00 1.18 101.18 2258. 0.052 0.025 0.00 1. 28 101.28 2450. 0.056 0.026 0.00 1. 38 101.38 2641. 0.061 0.027 0.00 1.48 101.48 2832. 0.065 0.028 0.00 1.58 101.58 3024. 0.069 0.029 0.00 1.68 101.68 3215. 0.074 0.030 0.00 1. 78 101.78 3406. 0.078 0.031 0.00 1. 88 101.88 3598. 0.083 0.032 0.00 1. 90 101.90 3636. 0.083 0.032 0.00 1. 91 101.91 3655. 0.084 0.032 0.00 1. 92 101.92 3674. 0.084 0.033 0.00 1.93 101.93 3693. 0.085 0.034 0.00 1.94 101. 94 3713. 0.085 0.035 0.00 1.95 101.95 3732. 0.086 0.036 0.00 1.96 101.96 3751. 0.086 0.036 0.00 1. 97 101.97 3770. 0.087 0.036 0.00 2.07 102.07 3961. 0.091 0.040 0.00 ·--.... ··-·--------·-··-------------··----·--··--·····-·-···-·---- . ···-···-·····-·····-·-···-. ----····------· --·-------·--·--- 4800 S. 188TH ST., SUITE 360, SEATTLE, WASHINGTON 9B1BB 206/431-7970 FAX/431-7975 = PACIFIC ENOJNEEAING DESIGN INC.= JOB------------- CIVIL ENGINEERING AND PLANNING CONSULTANTS Sr1EETNO ________ OF _______ _ DATE ______ _ Facility Documentation 2.17 102.17 4153. 0.095 0.042 0.00 2.27 102.27 4344. 0.100 0.044 0.00 2.37 102.37 4535. 0.104 0.046 0.00 2.47 102.47 4727. 0.109 0.048 0.00 2.57 102.57 4918. 0.113 0.050 0.00 2.67 102.67 5110. 0.117 0.051 0.00 2.77 102.77 5301. 0.122 0.053 0.00 2.87 102.87 5492. 0.126 0.054 0.00 2.97 102.97 5684. 0. 13 0 0.056 0.00 3.00 103.00 5741. 0.132 0.056 0.00 3.10 103.10 5932. 0.136 0.365 0.00 3. 2 0 103.20 6124. 0.141 0.930 0.00 3.30 103.30 6315. 0.145 1. 660 0.00 3 .40 103.40 6507. 0.149 2.450 0.00 3.50 103.50 6698. 0.154 2.740 0.00 3.60 103.60 6889. 0.158 2.990 0.00 3.70 103.70 7081. 0.163 3.230 0.00 3.80 103.80 7272. 0.167 3.450 0.00 3.90 103.90 7463. 0.171 3.660 0.00 .. .. ··-· ,_. ... ··-··-·------··-·-·•·-------··-- . '···-----·-···---·-·----------·-·--: _i_ ____________ . :··--. --··------·- -·----·--·-···-..... --------------··--···"-··-······---......... ·--~----------·-········--"-·------------------. -------------------------,----------------------·-------,-----·· -----------·--------------------------------------------·-····--_, ·····-------·----···-·---·--·----,,··-·-------------------------·--------------···------------·-····-·-·---·----- tcility Documentation 4.00 104.00 7655. 0.176 3.850 0.00 4.10 104.10 7846. 0.180 4.040 0.00 4 .20 104.20 8038. 0.185 4.210 0.00 4.30 104.30 8229. 0.189 4.380 0.00 4.40 104.40 8420. 0.193 4.550 0.00 4.50 104.50 8612. 0.198 4.710 0.00 4.60 104.60 8803. 0.202 4.860 0.00 4.70 104.70 8994. 0.206 5.010 0.00 4.80 104.80 9186. 0.211 5.150 0.00 4.90 104.90 9377. 0.215 5. 290 0.00 5.00 105.00 9568. 0.220 5.430 0.00 4800 S. 188TH ST .. SUITE 360, SEATTLE. WASHINGTON 98188 206/431-7970 FAX/431-7975 = PACIFIC l"!:NOINEERINO DESIGN INC.= JOB--------------'------ CIVIL ENGINEERING ANO PLANNING CONSULTANTS SHEETNO. _________ OF·--------- OATE, _______ _ ----·-----·······--·-----·--·--··----·----·······--··-·-------------· .. ·-··--~· ········----------~·-----········--.. ··----------·---------.... --------·····---··--· .. ----·--·-·- Hyd InflOw Outflow Peak Storage Target Cale Stage Elev (Cu-Ft) (Ac-Ft) l 0.32 ******* 0.27 3.07 103.07 2 0.17 ******* 0.13 3.02 103.02 3 0.22 0.06 0.06 3.00 103.00 4 0.17 ******* 0.05 2.78 102.78 5 0.20 ******* 0.05 2.54 102.54 6 0.12 0.03 0.03 1. 87 101.87 7 0.14 ******* 0.02 1.15 101.15 8 0.15 ******* 0.02 1. 06 101. 06 Type of Facility: Detention Vault Facility Length: Facility Width: Facility Area: Effective Storage Depth: Stage O Elevation: Storage Volume: Riser Head: Riser Diameter: Number of orifices: Orifice# l 2 Height (ft) 0.00 1. 90 43.75 43.75 1914. 3.00 100.00 5741. 3.00 12.00 2 Diameter ( in) 0.92 0.75 Top Notch Weir: None Outflow Rating Curve: None -,_ ft ft sq. ft ft ft cu. ft ft inches Full Head Discharge (CFS) 0.040 0.016 5876. 5787. 5742. 5328. 4866. 3578. 2209. 2026. Pipe Diameter ( in) 4.0 0.135 0.133 0.132 0.122 0.112 0.082 0.051 0.047 ·-···---- ------·-···----- 4800 S. 188TH ST .. SUITE 360. SEATTLE. WASHINGTON 881 BB 206/431-7870 FAX/431-7975 .-.•. llJ CTI I ~ ~ _: 0. ~ I () .r-,-- : I ' • ., !. '~·,: ~-' :: T , .. }., I 1 10 Return Peri,~d 2 5 10 ZD 100 R ~ ··' + ' :-,.:· \/ , ', ' 00 T 'I .\ 4G 50 60 70 ,v, 1 \J' '15 Cur~1ulott•1e Prnbat,tlliv I APPENDIX£ - ---PACIFIC f=NOJNEERINO 0eSION INC. -- CIVIL ENGINEERING Al'<O PLANNING CONSULTANTS J :=:;-5 HE ET NO. ______ ~ _____ OF ____ = -'---------- CAlCUVJEO B't' -., DATE_~"'-==-=='""---/ --~-------··-·' . : __ : ----·----·--·-·--' ----·-···-······--·-··-------: :-----~-----·----------··----·-···· ---·····---------·--··-·-----~---·---------------........... --·--·-----·-··-·----------~·----·. -·------•-··----------------·----------------· -··----·-·-·---~---····-··-------------··-··---·-·- __ :. ____ y4::z2k__ -r--/J1/?:3z:.Y/Cvi.S.~ -=-PA-v,r,4.?A7'~ ± '.51b9<.~..x. h..#o£,0:::::-6:;,;.,-=;,.t -----------·-·------········ -··--·--·-··· --~------. ___ ;_:_~_14._ __ ~~E-------/---·---· ? znJ~~-r' ____ i __ L3.1 .. -~ ?~'":-·---·····-~-- -------'----' ----------·····-··-·····-------· ······-······. __ ;:;:-z~_/1r4 .$, . .;. ___ • --• -------•----·------------------------ -----------·----· ----·------·--·---:::;;. ___ C-~~/:.. _A-~ . .f.;... <: .__ ____ ; ______ /7JJ7H_ p~y',(LJP~ _,!lg_;~--=---0•-'jJ_ 7; .....;..L}_,~j_ ------- L--------~------~------------·-________ Q. Z..j_ __ ,4_~(". _______ _ L---~i ___ J __ : -·---···-··--·'·---· ---·--: --······ -···-··! -·-· -··-····!·--------··-· -----! : -··-!····----·:·"---·-·-·-----.···-·--··.-·----·-·----· ______ ! _____ ----- . ______ 26z;~ ----····· ----- I--'--'-··-.·--·---------------·--···-----·---····-··:---·--------------·------~---·------··-··-··:-··-····--·--.... 0~.C.? -3+--'··--··-··-·-:--·-·-··-- ·-··'-··-··--·-·-·--·'.:: .. :..,21...3..-CL.r~:-... ..J •-----------·-·----····---.--·····-.. --.-··---------·-···········-·--·-·-·-·-·-·····-----------------·--·----~---·------·--···· ·-·----·-·•·---------·-·•---. ·--···---~···-·----··-·----: __ --------··---:_ ' --·-------··-------·-·-------·------·-··--·--------·-·-··-··-·---·--···- _____ J);SJtJ<S . ,,a.,J ___ ,r-'!,E:E,,t,:/,0~· _ A-£E-,,1. "=_L)Jfa/_,!!-~ __ r17((; C.AJ_=_7<2.____ ·-__ L----... ·---~b~-~------L'?..d.Z.:a~.-~A--..... -_o; Z I .. ,:;tce_--=--?.A:ri!)._._C_,,i/:::_65 ____________ _ . -·~--L~i6-.. ,.o,.e.ej£:[:~& .. r-1.~t;.;!./ _ .~¥.?'"~----;!),;_..;.,,.t_ ___ u_ ___ ~~ .. r?u.o_ ~1: ... ···--·-·----·---···--·--·-----··-·-·-·--··---··-······-----····---- . 0.,, '/,2 •••-, .... ·--·-··-·••-•'···--•••T-c:"",..:::_,"" .... / ,v';~----··-···-·-~·· ········-·"·--·----- ?-...... -.; ;,_:·l ...< - ---................. --'-. ,'. .. ...-~ ... _, .. -~-.. -:-. ............... ?..'.: ..:.;. .. ·-'-~-~z.. ?--~ ., __ 2 . hv·_ c../:-'2 ... - 4800 S. 1 BBTH ST .. SUITE 360, SEATTLE. WASHINGTON 9B1B8 206/431-7970 FAX/431-7975 12/6/00 10:18:43 am Pacific Engineering Design Inc page 1 ----=-====--===-==============----=----=----------=----=-=======-==-- BASIN SUMMARY BASIN ID: #l(lOOy) SBUH METHODOLOGY NAME: basin #1, lOOyr 24hr storm TOTAL AREA ....... : 0.82 Acres BASEFLOWS: 0.00 cfs RAINFALL TYPE .... : TYPElA PERV PRECIPITATION .... : 3.90 inches AREA .. : 0 .21 Acres TIME INTERVAL .... : 10.00 min CN .... : 85.00 TC .... : 25.17 min ABSTRACTION COEFF: 0.20 TcReach -Sheet L: 260.00 ns:0.1500 p2yr: 2.00 s:0.0230 impTcReach -Sheet L: 260.00 ns:0.0110 p2yr: 2.00 s:0.0230 PEAK RATE: 0.58 cfs VOL: 0.23 Ac-ft TIME: 480 min BASIN ID: #l(lOy) SBUH METHODOLOGY NAME: basin #1,lOyr 24hr storm TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : 0.82 Acres TYPElA 2.90 inches 10.00 min ABSTRACTION COEFF: 0.20 BASEFLOWS: AREA .. : CN .... : TC .... : 0.00 cfs PERV 0.21 Acres 85.00 25.17 min TcReach -Sheet L: 260.00 ns:0.1500 p2yr: 2.00 s:0.0230 impTcReach -Sheet L: 260.00 ns:0.0110 p2yr: 2.00 s:0.0230 PEAK RATE: 0.42 cfs VOL: 0.16 Ac-ft TIME: 480 min BASIN ID: #1(25yr) SBUH METHODOLOGY NAME: basin #l,25yr 24hr storm TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : 0. 82 Acres TYPElA 3.40 inches 10.00 min ABSTRACTION COEFF: 0.20 BASEFLOWS: AREA .. : CN .... : TC .... : 0.00 cfs PERV 0.21 Acres 85.00 25.17 min TcReach -Sheet L: 260.00 ns:0.1500 p2yr: 2.00 s:0.0230 impTcReach -Sheet L: 260.00 ns:0.0110 p2yr: 2.00 s:0.0230 PEAK RATE: 0.50 cfs VOL: 0.19 Ac-ft TIME: 480 min BASIN ID: #1(2yr) SBUH METHODOLOGY NAME: basin #1, 2yr 24hr storm TOTAL AREA ....... : RAINFALL TYPE .... : PRECIPITATION .... : TIME INTERVAL .... : 0.82 Acres TYPElA 2.00 inches 10.00 min ABSTRACTION COEFF: 0.20 BASEFLOWS: AREA .. : CN ...• : TC .... : o.oo cfs PERV 0.21 Acres 85.00 25.17 min TcReach -Sheet L: 260.00 ns:0.1500 p2yr: 2.00 s:0.0230 impTcReach -Sheet L: 260.00 ns:0.0110 p2yr: 2.00 s:0.0230 PEAK R.l\TE: 0.27 cfs VOL: 0.10 Ac-ft TIME: 480 min IMP 0.61 Acres 98.00 5.00 min IMP 0.61 Acres 98.00 5.00 min IMP 0 . 61 J1_c:ces 98.00 5.00 min IMP 0.61 Acres 98.00 5.00 min TABLE E.2 SCS WESTERN WASHINGTON RUNOFF CURVE NUMBERS (Published by SGS in 1982) Runoff curve numbers for selected agricultural, suburban and urban land use for Type 1A rainfall distribution, 24-hour storm duration. Curve Numbers By Hydrologic LAND USE DESCRIPTION CONDIT10N Soils·Group A B C Cultivated Land Winter 86 91 94 Mountain open areas Low brush/Grassland 74 82 89 Meadow/Pasture 65 78 @ Wood or Forest Undisturbed 42 64 76 Wood or Forest Young 2nd growth/brush 55 72 81 Orchard With cover crop 81 88 92 Lawns, Parks, Golflinks, etc. 75% or more grass cover 68 80 86 Lawns, Parks, Golflinks, etc. 50% to 75% cover 77 85 90 Commercial 85% impervious 92 94 95 Industrial 75% impervious 88 92 94 Residential (1/8-acre lot) 65% impervious 86 90 93 Residential (1/4-acre lot) 38% impervious 77 85 90 Residential (1/3-acre lot) 30% impervious 75 84 89 Residential (1/2-acre lot) 25% impervious 73 83 88 Residential (1-acre lot) 20% impervious 71 82 88 Gravel Roads/Car Parks 76 85 89 Dirt Roads/Car Parks 72 82 87 Impervious Surfaces 98 98 rga) '::f:::Y Water Bodies 100 100 100 For more detailed information refer to the National Engineering Handbook, Chapter 9, Hydrology, SCS. E-4 D 95 . 92 89 81 86 94 90 92 96 95 95 92 91 91 90 91 89 98 100 SECTION 3.2 RUNOFF COi'vfPITTA110N AND ANALYSIS MEIBODS WESTERN KING COUNTY 2-Ye·ar 24-Hour Precipitation in Inches 9/1/98 FIGURE 3.2..1.A 2-YEAR 24-HOUR ISOPLUVIALS 4 3-14 ... ----3.5 1998 Suri= Water Design Manual 3.1.1 RATIONAL \1ETHOD FIGURE 3.2.1.D 100-YEAR 24-HOUR ISOPLUVIALS WESTERN KING COUNTY 100-Year 24-Hour Precipitation in Inches 199& Surf:ic~ Water Design Manual N * o 2 4Miles =--------=2e----l=::s=;i==:::i" 3-17 ~--- --~ ~ I <,}' ~ tlD \ -~ ··-// ' 9/1/9& FIGURE 3.2.1.B 10-YEAR 24-HOUR I.SOPLUVIALS WESTERN KING COUNTY 10-Year 24-Hour Precipitation in Inches 19 98 Surfac e Wacer Design Manual N * ~ 0 2 4 M~es I L;;;;=-s==----1 3-15 ~ ..,, 3.2.l RATIONAL MEIBOD $H O H M ISl1 COU N 'rY "'"'~~UN'7v 4.0 4.5 ~ ,,.:-_4.0 . 7 ' ~~ 9/1/98 SECTION 3.2 RUNOFF COl\1PUfATION AND ANALYSIS MEIBODS II FIGURE 3.2.1.C 25-YEAR 24-HOUR ISOPLUVIALS WESTERN KING COUNTY 25-Year 24-Hour Precipitation in Inches 9/1 /98 0 2 3-16 !H ~~S_H~~~ »c.1 M<. COU N T'Y -. 1998 Surface Water Design Manlllil ---PACIAC ~NOINEERINO DESIGN INC. ---~ CIVIL ENG1NEERING AND PLANNING CONSULTANTS SHEET N0.-----~=~----0'---~'-=-------- -···---·------· C.W:ULATEO BY /7 7;-; .,....~-.:~ ..,__,, ____ -~--__ ,-.._ __________ ····-··-------··---·-------------·--······-· :.,-,1-r .!"~ --=----~···-~-~ ····-;--·-·--··----------·-'-------·-·--------;-··- -----··-·--------.--·-··-·--.---. ---·-'····------------·--··-··-·-- ---:. ?2~ .. XL -·-·---C--~ .. 5-~·-·--cf's~---·--: ·---·--' ! --······ ;---------·--·-·-·--- / 'j I _,..7"_ DATE_~·"'-=------~~==~-- ---------~-' . ---···----··-----·-·--·-·-··--··-·-···•-·-··--___ .. _______________________ -·---------·-····---·-·----. ···--------------------- 1--~-~o~!':!~,e__-_ _c_i __ 5_ Y_ -. -. : . . ~---:--, .. >·--·-· ; ___ . :---------: ---····------- . . . -----·-··----··· .···--------·-···---···- ·------···--------·-··--·--·-···---- n --,.. "" -·; --:,.::_ --~ ·------· --····--······-··----,·-------···--·-··-··-·----. '·--· '--·----------·--··· '···-----·-·-----·-····-------·-· '-·----· ·--·-···-··--··'-··-··--··-·-·--·····-··· -·· ·) z=.:_-:1 1-.,,--·-··---{_;;...-'.--... .,...,. .... ::o""--.. -·-·-·---··-··· ·"0 -,...-, ? = .-a.:: · .... ......,,._ __ .-.-... :...!..} .. ~. .--:--·--~.' ·----· ..... '--····----·-·-·--··-----' . ---·--·-·-·-·-·-·---·--··· -·-···--·--··-·--··--·-·---· S .. ::.. . .C.t .. -~..::'. ... _____ -.: .. --··-·-----.. ---··-----·-··-, __ 0.. .. ~ .... ~ ...... ;;..,z.,, .. .. k/.-c ....... -::. .-.,,., ,:_,,,_ -·····--··:c.;...,-···-· .. /' (",- ······ ........... -.-"' .. -. ---~---.. .,.. .... -.. -. ···"'··· ··~·--···· ::-,..:. __ -· 4800 S 1 RATH ST ~l IJTE 360. SEATTLE. WASHINGTON 981 BB .... .,..!i~.·-· ···:_... ,;, .. -,,;. 206/431 -7970 FAX/431 -7975 ---PAclAC ENGINEERING DESIGN INC. /.?:::. ,-,,,.} v-:'.~-==/ ' ' ;i<_,-C?::.(;//; JOB • ~ -SHEET NO. ..., OF CIVIL ENGINEERING AND PLANNING CONSULTANTS ;VI. ,4.3.;:,/'. /2 , ,,. C.AJ..CUVJEI) BY o.<rE -,b-,__,C, ~-,}3 __ ;:=, __ ,:;:'.:_ __ --;. -----------------------·------·---·------ _______ () ~----4L22 .... c,_ct ___ .. __ ·-··------·-····---------··--·---•·-·-····"•----·-····--···· __ . _ S _;, Q, DI __ _ _ /)_.; a,oz. _____ _ M~------3~----·---~--......... --;;, ····--: __ y~_ -.. _.CL_ZJs .. / ... _________ _ ' ' ·-·' --·--· ___ ......... --·-----·-··-__ _ v __ = J. tJ7 _E.f?S .2 /-0,1=,es ,np~ __ . __ .,,,-/;; __ 1-~-LJJ_Q _ B ~ _{, ' ----:=~~~~----~---~=~:~==~~~~-----_-------------------------·-------------_-__ -__ --__ -_· __ -_-_-____ -_-___ --_---------==-==------___ -_____ -___ --....:--_-_-_--_, .. '. -·· \-42~--D~ z_. 7: c-f' Sr----__ J -----------·-·: .......... ___________ . ------····--·---··-! 5 ..;._ ----~~ . .D / ------~ ___ )? ~ . .::J.i.. . .tJ . ..:_ ____ M.:... ___ c ___ _ ----3). ---_ t! _ -: .. c~.;.:J !c -~----·-·-·-----·--............ ---·-----~--, -·-·------·····--·-·-···-··---. _ -----_ }( ---~'--7-._:~ 5. .. · ..... <-_ .. _ . .,!10 .. ;~: .. J::.~ ·-··~-·-·-·-.. ~~-----~·_},~. ·----···-···---,____ _______ ... ·--·---·----·----· ! £).5 Y2 S 7.a £..r D,vV:"·-:"r'-~ _:_ •. ---······-····---·""··· .·----··-·. ······-····· .. ·· ······--······-···--·-·--·-··-····· '··--··--·--·-·· -·········-· ·-- --"-----. .5;____ _ =---c. o ./ _____ _ _________ B __ Ad.:z_ --3 --.... •••·---··-·--··----··-·-··-····---·--···--·--·-·- ____________ , ______ lJ3,eJ£-c _____ c;,/Jl. __ Z/Mu ___ :1_._,!._/./3.lA::rt;:~~- ·--·/J2R ..... u .... ,.,.:S ... :(~~~.c~ .... Ci;'?!::r.e:!{J;:< .. _ .... w.r rJ± ... ----------,5~"!7eJ::: __ ,:5~_bl.:.,~_;:::__::;i.,,,_:· ____ 2.)_=,':..,;-csJ_ __________ _ y /1/',?} . -; ·-······-·····-· ···----"· ... ·-···-·····-···--·· '/_ -= .. l_C:C..c:L..: ~} ... Q .. ;c~ .... /:-:Z ... -.. ;: •. ~i; ..... c .. , ~ -~-- ..... ,... ., v:'. , ... :-,' . ./.. .... .. S.-..... £ ·····-········· 4Rnn S 1!=1RTH ST SI llTF :-=!Fin SFATTLE. WASHINGTON 981B8 206/431-7970 FAX/431-7975 SECTION 4.4 OPEN CHANNELS, FLOODPLAINS. AND H.,OODWAYS 9/l/98 ;;:~~~IWoi1r~;~~~;;p~~(i_r£.gg[;_;;_~~~i~i~;~i~E1·:sm~~~ Type of Channel Manning's Type of Channer Manning's and Description •n"* and Description qn"'* (Normal) (Normal) A. Constructed Channels 6. Sluggish reaches, weedy 0.070 a. Earth, straight and uniform deep pools 1. Clean, recently completed 0.018 7. Very weedy reaches, deep 0.100 2. Gravel, uniform section, 0.025 pools, or floodways with -·---heavy stand of timber and I 3. With short crass. few weeds 0.027 I underbrush b. Earth, winding and sluggish b. Mountain streams, no 1. No vegetation 0.025 vegetation in channel, banks 2. Grass, some weeds 0.030 usually steep, trees and brush 3. Dense weeds or aquatic 0.035 along banks submerged at plants in deep channels high stages 4. Earth bottom and rubble 0.030 1. Bottom: gravel, cobbles, 0.040 sides and few boulders 5. Stony bottom and weedy 0.035 2. Bottom: cobbles with large 0.050 banks boulders 6. Cobble bottom and clean 0.040 B-2 Floodplains sides a. Pasture, no brush C. Rock lined ,. Short grass 0.030 1. Smooth and uniform 0.035 2. High grass 0.035 2. Jagged and irregular 0.040 b. Cultivated areas d. Channels not maintained, 1. No crop 0.030 weeds and brush uncut 2. Mature row crops 0.035 1. Dense weeds, high as flow 0.080 3. Mature field crops 0.040 depth c. Brush 2. Clean bottom. brush on 0.050 1. Scattered brush, heavy 0.050 sides weeds 3. Sarne as #2, highest stage 0.070 2. light -brush and trees 0.060 of flow 0.100 3. Medium to dense brush 0.070 4. Dense brush, high stage 4. Heavy, dense brush 0.100 8. Natural Streams d. Trees 8-1 Minor streams (top width at 1. Dense willows, straight 0.150 flood stage< 100 ft) 2. Cleared land with tree 0.040 a. Streams on plain 0.030 stumps, no sprouts 1. Clean, straight, full stage no 3. Sarne as #2, but with 0.060 rifts or deep pools 0.035 heavy growth of sprouts 2. Sarne as #1, but more 4. Heavy stand of timber, a 0.100 stones and weeds 0.040 few down trees; little 3. Clean, winding, some pools undergrowth, flood stage and shoals 0.040 below branches 4. Sarne as #3, but some 5. Sarne as #4, but with flood 0.120 weeds 0.050 stage reaching branches 5. Same as #4, but more stones . Note: These •n • values are "normal" values for use in analysis of channels. For conservative design for channel capacity, the maximum values listed in other references should be considered. For channel bank stability, the minimum values should be considered. Direct Step Backwater Method The Direct Step backwarer method can be used to compute backwater profiles on prismatic channel reaches (i.e .• reaches having uniform cross section and slope) where-a backwater condition or restriction to normal flow is known to exisL The method can be applied to a series of prismatic channel reaches in secession beginning ar the downstream end of the channel and computing the profile upstream. - 1998 Surfac:. Water Design Manual 4-60 "11.RIABLES LIST: Y -FLOW DEPTH Q -FLOWRATE MAN-MADE CHANNELS B -CHANNEL BOTTOM WIDTH M -CHANNEL SIDE SLOPE S -CHANNEL SLOPE N -CHANNEL ROUGHNESS '\.RIABLE TO BE SOLVED (Y,Q,B,M,S ORN) ? Y (CFS) ? 0.27 RESULTS 3 (FT) ? 2 ==========--===== .. (FT/FT) ? 3 Y= 0.09 FT (FT/FT) ? 0.01 A= 0.20 SF N (FTAl/6) ? 0.02 P= 2.55 FT V= 1. 36 FPS F= 0.85 SUB-CRITICAL FLOW <Shift> <Prt Sc> print <Return> repeat <Space Bar> back to menu ------------------------------------------------------------------------------ - .. ".RIABLES LIST: Y -FLOW DEPTH Q -FLOWRATE MAN-MADE CHAN.NELS B -CHANNEL BOTTOM WIDTH M -CHANNEL SIDE SLOPE S -CHANNEL SLOPE N -CHANNEL ROUGHNESS ~~Ll\BLE TO BE SOLVED (Y,Q,B,M,S ORN) ? Y (CFS) ? 0.27 RESULTS 3 (FT) ? 4 ================= " (FT/FT) ? 3 Y= 0.06 FT (FT/FT) ? 0.01 A= 0.25 SF :-J (FT~l/6) ? 0.02 P= 4. 37 FT V= 1.09 FPS F= 0.81 SUB-CRITICAL FLOW <Shift> <Prt Sc> print <Return> repeat <Space Bar> back to menu ------------------------------------------------------------------------------ - "JI.RIABLES LIST: Y -FLOW DEPTH Q -FLOWRATE MAN-MADE CHANNELS B -CHANNEL BOTTOM WIDTH M -CHANNEL SIDE SLOPE S -CHANNEL SLOPE N -CHANNEL ROUGHNESS AR~ABLE TO BE SOLVED (Y,Q,B,M,S ORN) ? Y (CFS) ? 0.27 RESULTS 3 (FT) ? 5 ================= vr (FT/FT) ? 3 Y= 0.05 FT (FT/FT) ? 0.01 A= 0.27 SF '1 (FTAl/6) ? 0.02 P= 5.33 FT V= l. 02 FPS F= 0.80 .SUB-CRITICAL FLOW ZShift> <Prt SC> print <Return> repeat <Space Bar> back to menu ------------------------------------------------------------------------------- - "I\JUA3LES LIST: Y -FLOW DEPTH Q -FLOWRATE MAN-MADE CHANNELS B -CHANNEL BOTTOM WIDTH M -CHANNEL SIDE SLOPE S -CHANNEL SLOPE N -CHANNEL ROUGHNESS I\.RIABLE TO BE SOLVED (Y,Q,B,M,S ORN) ? Y (CFS) ? 0. 27 RESULTS B (?T) ? 6 ----------------- M (FT/FT) ? 3 Y= 0.05 FT (FT/FT) ? 0.01 A= 0.29 SF N (FTAl/6) ? 0.02 P= 6.30 FT V= 0.94 FPS F= 0.78 SUB-CRITICAL FLOW <Shift> <Prt SC> print <Return> repeat <Space Bar> back to menu - "ARIABLES LIST: Y -FLOW DEPTH Q -FLOWRATE MAN-MADE CHANNELS B -CHANNEL BOTTOM WIDTH M -CF.ANNEL SIDE SLOPE S -CHANNEL SLOPE N -CHANNEL ROUGHNESS ~~IABLE TO BE SOLVED (Y,Q,B,M,S ORN) ? Y (CFS) ? 0.5 RESULTS B (FT) ? 6 =====----=-===--= M (FT/FT) ? 3 Y= 0.08 FT (FT/FT) ? 0.01 A= 0.50 SF N (FTAl/6) ? 0.027 P= 6.51 FT V= 1.00 FPS F= 0.63 SUB-CRITICAL FLOW <Shift> <Prt Sc> print <Return> repeat <Space Bar> back to menu - "'\..'l.IABLES LI ST: Y -FLOW DEPTH Q -FLOWRATE MAN-MADE CHANNELS B -CHANNEL BOTTOM WIDTH M -CHANNEL SIDE SLOPE S -CHANNEL SLOPE N -CHANNEL ROUGHNESS ".RIABLE TO BE SOLVED (Y,Q,B,M,S ORN) ? Y (CFS) ? 0.58 RESULTS l (FT) ? 6 ==========--===== (FT/FT) ? 3 Y= 0.09 FT (FT/FT) ? 0.01 A= 0.55 SF J ( FTA 1/ 6) ? 0.027 P= 6.55 FT V= 1. 06 FPS F= 0.64 SUB-CRITICAL FLOW ~hift> cPrt Sc> print <Return> repeat cSpace Bar> back to menu ------------------------------------------------------------------------------ - --I", I -•--·/ KC.. i'"TQ1/ ',( / --·. L!. ~ SHEET NO.-----~------OF ___ ~~------- .. '# := • __ a--'-, c,-=/1'-'-'-· --~--= PACIAC f!""NGINEERINO DESIGN INC. JOB CIVIL ENGINE:ER!NG AND Pl.A.NNING CONSULTANTS CALCULATED BY /11/ A.:::. :=.f; DATE~lc.L=:...:...,.' _:-=-C=e':.cc..=_ ···--'$ --'/--{J)_c;-L,),c:;2,j__:, __ .Q,CJ'?_i. ---------· ---· ···-----···---·- -)---··-··\1-(+--:~.:cd:.:;g ____ ~ _/, ___ £{ __ t ____ f~_s_ _____ ~_~;;;-Q __ jp ~ ~~~-......... ~L1:::. .. . __ Q:z.c;L,2..-~--.Q,.2,2 .C .·-'"'._ _ "------·------·-·---·---··---·-··--. --·-·---·-_ ------····--···-····-·-·------··--·-·--·-· . B .. ::. .... £' ---d----·----·----------·····--··--·····-·-··-······-·····--····-·------------~-----------·-----------····-... ---·--····-------·------·-· ...... _ .. ____ _ __ · __ L __ Ls_~ _o._.e:_;_ ___ _ ---···---: ---·-. ---' _______ : ··---·, ···----·-····--: ______________ :-··~----- ' "' -. .., 'r,-; -,. . •-------'-.LL_,.... __ ,:..,,· ·u ........ --:--···-·-·------··-···---·---------. ' : .. / . ---·-··-·----·----··-·····------·- ---=~=-~~--~-------· __ i_~--~~;~~,J ::~~-~ ~ _< i/.c .:;o~-=~:--:~=~:= . ' ' . . --··-·-·' ---' : ----·-·--·-·-··. -·-····--··-··~--·--·-···---·--· ··-·------·-. --··-···-·-····---------.. . ·-:-·----~----·--·-----·-·--·---- _i ________ J_~:=_ __ : ___ D_Q-1:.fAl.._i2)~C.:~d.i _ _:: ___________ _i. __ :. .. _.~~--c_t .. C"__? ___ ~~----··--·------·--------------·---·•··-··-····~--~------ I : : 1-----···-··--·-····-·'····-·· '-········--' ...... , ......... -·--·····-················--·········-........ , ..• c:..,. --L .. C~-~ _______ : ----·---: --·-·-···-·. / . ' '1? r . ; ---·-·-....... ~---·' ---·······-·-·--· ·-•·-··-·····--·--·--·--·-·-··-···-·-···-··········-···----------··-·-·-·-··-----·-----------·------··-~-~--------·-···-- ······-··-·---~---' ·-·--·----·····-·· -·-. ' ·---·-· ----,-----···-·----------·-·---·-····--· ---------------·--·····-····---····--------·----·---·-- !----·-' -.. ; ...... -·······················'··-·-···-····'····· .......... ·--·-···--··-'·---···'---...... ······--------·-··--········-·----······--····· ···-----···---···----------·--- .:.'.:l.Rnn c:; 1 J::IRTH .C:::T c:;1 IIT!= '.""=lRn G:;!=Li.TTI F=. VVASHrNr:;TnN qR1 RR 206/431-7970 FAX/431-7975 ""MI.ABLES LIST: Y -FLOW DEPTH Q -FLOWRATE MA..l\J -MADE CHANNELS B -CHANNEL BOTTOM WIDTH M -CHANNEL SIDE SLOPE S -CHANN""EL SLOPE N -CHANNEL ROUGHNESS "L.~I.ABLE TO BE SOLVED (Y,Q,B,M,S ORN) ? Y (CFS) ? 0.27 RESULTS B (FT) ? 6 -----------------.. (FT/FT) ? 3 Y= 0.06 FT (FT/FT) ? 0.01 A= 0.34 SF N (FTAl/6) ? 0.027 P= 6.35 FT V= 0.79 FPS F= 0.60 SUB-CRITICAL FLOW ~Shift> <Prt Sc> print <Return> repeat <Space Bar> back to menu --PACIAC ENGINEERING DESIGN INC. = CIVIL ~NG!NEERING AND PLANNING CONSULTANTS -.::::::-... ,_ '-_.·,.'/ ~ ~ SHEET NO.·----~------OF·----------- CALCULATED BY M -----·-····-····-···•·-------···---·--·----··-·-·-----· -·--------·-----------··-···•·-···-~---··--··----------·-··-·----·--.. ------·-··-·····- . ······--------· .. •· ... -------··-·-·-··---·----··-······ -········-·-···--------···-··--···-···--·-··------•··· . -· ---····-------.. ----------. -- ..•... ~-------·--------------···--,. ··-·-······-·-·· --------------·· .. ·--·---··. ·-·-·-·----.. ,. . . . .... . k_________ .• --------. -· -=.f:.. ----··-. I . I ·~ =-...:::.~ 1 · :....... . ·wt_;r-. -· ..... -===~ _-..=.:::: .... =:.::: ~r~ -=f •·· -_ .. ==---_----=-~~=t== --··--~----· -··-··-,_,\j_:: _ -=--:J·t. ···-=----.-~---.. -·-· ---------------~ ~ .-. !,,i . •-·--· ------. . ---. ;~ - ' " . ! ~ ' !'--------r:·-r--"' · ··-······· -----·-1ie· ----==~~::=--· --------:1 : __ ::: ... t=~:---:-------ts=:· ············------·· ----11 -·-...:-.:L ::::.--1~ I~ · ~ -.:::::::. . .1~ -~~·--~. ~,. -·~=:~-Jsj~--~=·~=~ J' : ----··-······-···-···--··--------------···•·------·--······-------1-'°"-· ···------·-·· .. ··T·-····-------. ~ I I;, r ·············j·· ----------·-----------. ,, . ----·· ~ ·-----__ :__ --...... ----_____ J,, . . ----~---··--................. -········ .. ········-·· -· ............ ____ .... ___ ]:·' ~ t • I~ -----------.. \ ~~===~---. . ............................... --,~-~-~=~~--~~=is ....... \:. ---·······' ·--~----' ... i F ------- __ 1-..i ..... l ·-·····--\ / j -::: .\' i':-;.. I 1 ~ '<:. . 1: '. Ii'-: .. ~ ·n..::······ .ai=:nn S 1RRTH ST _c::;11rTF :-!Fln S.FATTl F. WASHINGTON 98188 206/431-7970 FAX/431-7875 i\PPENDIX F --PACIRC f':NOINEERING DESIGN INC. -= JOB ClVIL ENGINEERING AND PLANNING CONSULTANTS / ::? SHEET NO. _____ .=~ ____ OF ___ ~------- ······--------------~ CAlCUL.ATEO BY ·-·----·/: CB.-:tf_ .. , . -------------·····----·---~ -----··: ·-····--------·-·--------~1-----"jr t;:;..~-tc~--:~ · I~" s; • . • ' _ ~·:_ I 1·· ----I --· ----------8 /A/Y. -----~-------· - ·-_..,, -'~- , DATE ·--~·~:;;;::/Lr·--- / .e .'tvl ~ -3 BB~ _/--··········--··h\/1;;,;·-··::-3z2;:~·· .... _ ... , )./ul)E BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:pipe50.bwp Surcharge condition at intermediate junctions Tailwater Elevation:O. feet Discharge Range:0.5 to 0.58 Step of 0.01 [cfs) overflow Elevation:387.9 feet Weir:NONE Upstream Velocity:l. feet/sec PIPE NO. l: 10 LF -l2"CMP @ OVERFLOW-EL, 388.40 0.50% BEND: OUTLET: 384.55 INLET, 384.60 INTYP: 3 JUNC NO. l: 0 DEG DIA/WIDTH: 2.0 Q-RATIO, 0.00 Q (CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.50 0.48 385.08 * 0.024 0. 30 0.42 0.00 0.30 0.42 0.48 0.41 0.51 0.48 385.08 * 0.024 0. 30 0.43 0.00 0.30 0.42 0.48 0. 41 0.52 0.49 385.09 * 0.024 0.30 0.43 0.00 0.30 0.43 0.49 0.42 0.53 0.49 385.09 * 0.024 0. 31 0.44 0.00 0.31 0.43 0.49 0.42 0.54 0.50 385.10 * 0.024 0. 31 0.44 0.00 0. 31 0.43 0.50 0.42 0.55 0.50 385.10 * 0.024 0.31 0 .45 0.00 0. 31 0.44 0.50 0.43 0.56 0.51 385.11 * 0.024 0.32 0.45 0.00 0.32 0.44 0. 51 0.43 0.57 0.51 385.11 * 0.024 0.32 0.46 0.00 0.32 0.44 0.51 0.44 0.58 0.52 385.12 * 0.024 0.32 0.46 0.00 0.32 0 .45 0.52 0.44 0.58 0.52 385.12 * 0.024 0.32 0. 46 0.00 0.32 0.45 0.52 0.44 PIPE NO. 2: 58 LF -12 11 cP @ 0.52% OUTLET: 384.60 INLET: 384.90 INTYP: 3 Q (CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.50 0.40 385.30 * 0.012 0.30 0.29 0.48 0.48 0.30 ***** 0.40 0.51 0. 46 3 85. 3 6 • 0.012 0.30 0.30 0. 48 0.48 0.30 0.46 0.40 0.52 0. 47 385.37 * 0.012 0.30 0.30 0. 49 0.49 0.30 0.47 0.41 0.53 0. 41 385.31 * 0.012 0. 31 0.30 0.49 0. 49 0.31 ***** 0.41 0.54 0. 42 385.32 * 0.012 0. 31 0.30 0.50 0.50 0.31 ***** 0.42 0.55 0. 48 385.38 * 0.0~2 0. 31 0.31 0.50 0.50 0.31 0.48 0.42 0.56 0.43 385.33 * 0. 012 0. 32 0.31 0.51 0.51 0.32 ***** 0.43 0.57 0.43 385.33 * 0.012 0.32 0.31 0.51 0.51 0.32 ***** 0.43 0.58 0.49 385.39 * 0.012 0.32 0.32 0.52 0.52 0.32 0.49 0.43 0.58 0. 49 385.39 * 0.012 0.32 0.32 0.52 0.52 0.32 0. 49 0.43 • BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:pipe51.bwp Surcharge condition at intermediate junctions Tailwater Elevation:O. feet Discharge Range:0.5 to 0.58 Step of 0.01 [cfs] Overflow Elevation:387.8 feet Weir:NONE Upstream Velocity:l. feet/sec PIPE NO. 1: 50 LF -12"CMP @ 0.50% OUTLET: 384.55 INLET: 384.80 INTYP: 4 Q (CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* a.so 0.45 385.25 • 0.024 0.30 0.42 0.00 0. 30 0.42 0.45 0.38 0.51 0.46 385.26 • 0.024 0.30 0.43 0.00 0.30 0.43 0.46 0.39 0.52 0.46 385.26 • 0.024 0.30 0.43 0.00 0.30 0.43 0.46 0.39 0.53 0.47 385.27 • 0.024 0.31 0.44 0.00 0.31 0.44 ·o.47 0.40 0.54 0. 47 385.27 • 0.024 0.31 0.44 0.00 0. 31 0.44 0.47 0. 40 0.55 0. 48 385.28 • 0.024 0.31 0.45 0.00 0.31 0.45 0.48 0.40 0.56 0.48 385.28 • 0.024 0.32 0.45 0.00 0.32 0.45 0.48 0.41 0.57 0.49 385.29 • 0.024 0.32 0.46 0.00 0.32 0.46 0. 49 0. 41 0.58 0.49 385.29 * 0.024 0.32 0.46 0.00 0.32 0.46 0.49 0.42 0.58 0.49 385.29 • 0.024 0.32 0.46 0.00 0.32 0.46 0. 49 0.42 '. BACKWATER COMPUTER PROGRAM FOR PIPES Pipe data from file:pipe52.bwp i-/ -.1) J.i.L Surcharge condition at intermediate junctions Tailwater from HW/TW File:hw50.bwt Discharge Range:0.5 to 0.58 Step of 0.01 [cfs] Overflow Elevation:388.5 feet Weir:NONE Upstream Velocity:l. feet/sec PIPE NO. 1: 36 LF -12"CMP @ 0.50% OVERFLOW-EL: 388.90 BEND: OUTLET: 383.28 INLET: 383.46 INTYP: 3 JUNC NO. l: 0 DEG DIA/WIDTH: 2.0 Q-RATIO: 0.00 Q (CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.50 1. 87 385.33 • 0.024 0.30 0.42 2.02 2. 02 1. 87 1. 87 0. 41 0.51 1. 93 385.39 * 0.024 0.30 0.43 2.08 2.08 1.93 1. 93 0.41 0.52 1. 94 385.40 * 0.024 0. 30 0.43 2.09 2.09 1. 94 1. 94 0.42 0.53 1. 88 385.34 • 0.024 0. 31 0.44 2.03 2.03 1. 88 1. 88 0.42 0.54 1. 89 385.35 * 0.024 0. 31 0.44 2.04 2.04 1. 89 1. 89 0.42 0.55 1. 95 385.41 * 0.024 0.31 0.45 2.10 2.10 1. 95 1. 95 0.43 0.56 1.91 385.37 * 0. 024 0.32 0 .45 2.05 2.05 1. 90 1. 91 D. 4 3 0.57 1. 91 385.37 • 0.024 0. 32 0.46 2.05 2.05 1. 90 1. 91 0.44 0.58 1. 97 385.43 * 0.024 0.32 0.46 2.11 2 .11 1.96 1. 97 0.44 0.58 1.97 385.43 • 0.024 0.32 0.46 2.11 2 .11 l.96 1.97 0.44 PIPE NO. 2: 8 LF -12 11 CMP @ 0.50% OUTLET: 383.46 INLET: 383.50 INTYP: 3 Q(CFS) HW(FT) HW ELEV. * N-FAC DC DN TW DO DE HWO HWI ******************************************************************************* 0.50 l.84 385.34 * 0.024 0.30 0.42 l.87 1. 87 1. 84 1. 84 0.40 0.51 1. 90 385.40 * 0.024 0.30 0.43 1. 93 1. 93 1. 90 1. 89 0.40 0.52 1.91 385.41 * 0.024 0. 30 0.43 1. 94 1. 94 1.91 1.90 0. 41 0.53 1. 85 385.35 * 0.024 0.31 0.44 1. 88 1. 88 1. 85 1. 84 0. 4l 0.54 1. 86 3 85. 3 6 * 0.024 0. 31 0.44 1. 89 1. 89 1. 86 1. 86 0.42 0.55 1. 92 385.42 * 0.024 0.31 0.45 1. 95 1. 95 1. 92 1. 92 0.42 0.56 1. 87 385.37 * 0.024 0.32 0.45 1. 91 1. 91 1. 87 1.87 0.43 0.57 1.87 385.37 * 0.024 0.32 0.46 1. 91 1. 91 1. 87 1.87 0.43 0.58 1. 94 385.44 • 0.024 0.32 0.46 1.97 1. 97 1. 94 1.93 0.43 0.58 1. 94 385.44 * 0. 024 0.32 0.46 1. 97 1. 97 1.94 1. 93 0.43 ~ 0 .\ z < ~ ~ ' t ~ 11;1 ~ ~ , 0 ~ > •• , .. 1!i; '~. " .. ' ' : ' ' ~ ~ 2 ••• '!" ·1· , • s • oou ·~· U~f u#IJ -·· • • • : ' ' ' ' 0~ .{' «;-<,; ' l~2eo· "'' '.J.• ' "· .. ,. -~:"· .' ~ •.H1' 1."·· / ;~ ..... ' ,, /J ,., -,s • ,. riru ,u,,. Of•< ,,,r d/1,C, ' • > ' ' ~ . . > ' • • • 1·],-:; •ivu· ~ .. ~ /,? ~-~ .. -- ,ii . i1 J. ~i "· 1~~11 I ' . , ' i-17031p S A~t0 LA ( ~;i~4-4 ,uw , r ... ~~ ·..d..'.--.. ---·-/fu,-, ~· LOT I 8-' Cl 1085 I ... ~ j i ..... ·- !-' ... .. • I ••• I ~ ~ '"''" llr.u, . ' ,~ai t •,' DI' IV ' ! ; l_ _ ,u. Lt!l ,u,o:,oiz. ~ ' : ___ ._ .. _., ·~i-: • s \ il:'~ trl------ \ ' :1 f' I·'@ ~.,n ' J>'"-7 I-~ .... ~ ...... ' l'~·"-" F I ·1~ C • .. i·'lJ) I ' i .• -.: I• "1 I , . ,r : ; . ,, " ' " • ' V " ll (, J::1 ~o 1 ·~ 31 ( " 'J ' • ~-·~ r ' ' .. .. ,J •' ,, , ' ·.~