Loading...
HomeMy WebLinkAboutC23002801_LivAway Renton Hotel_After Preconstruction Meeting NotesHello, Thank you for attending the pre-con meeting today. Below is a summary of the meeting with items that had additional discussion listed, please let me know if you feel anything is in error or missing: * Yong read the pre-con notes. * Brad and Yong emphasized the construction hours and fire prevention during construction. * Yong emphasized early communication with the franchise utilities. * Discussed erosion control and additional requirement will be added for wet season. * Clark emphasized tree protection during construction. * Contractor will coordinate with Jonathan and Jeremy from City Water Utility for on-site PRV station installation. * Jason will follow up with the sizing calculation of the domestic water meter and service line for the Hotel Building. Thank you, Yong YONG QI, PHD, P.E., Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425) 430-7439 | yqi@rentonwa.gov