Loading...
HomeMy WebLinkAboutLUA16-000448_Report 1DEPARTMENT OF COMM TV AND ECONOMIC DEVELOPMENT PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT DATE: PROJECT NUMBER: PROJECT NAME: PROJECT MANAGER: OWNER: APPLICANT: PROJECT LOCATION: PROJECT DESCRIPTION: SEC-TWN-R: LEGAL DESCRIPTION: (King County Assessor) July 11, 2016 LUA16-000448, SME Renton Rowing Float Replacement Jill Ding, Senior Planner Kelly Beymer 1055 S Grady Way Renton, WA 98057-3232 Cheryl Eastberg 3320 Fuhrman Ave E Seattle, WA 98102 1060 Nishiwaki Lane The applicant is requesting a Shoreline Exemption for the replacement of two existing floats (Floats A and B) at the Cedar River Boathouse. The project site is located within the Urban Center (UC) zone and is within the High Intensity Shoreline Designation of Lake Washington, Reach I. The proposal would replace two floats with wood decks with new floats and a connecting walkway (Floats C, D, and E) that meet current standards for materials, floatation, and decking. The existing two floats are old, deteriorated and at the end of their lifespan. Float A (1,170 square feet) is tied to the north side of the existing pier and is not in use. Float B {1,300 square feet) is located on the south side of the existing pier and is in use for boating activities. The replacement is proposed to occur in two phases: Phase I would involve the removal of Float A from the water at a nearby boat ramp to be demolished and disposed of properly, Float C (975 square feet) would be installed next to the existing boat house to be used as the primary float for boathouse activities. Float B would be repositioned to the east of new Float C and connected to Float C via a connecting walkway (Float D, which totals 190 square feet). Phase II includes the removal of Float B for proper disposal and the replacement with new Float E (1,180 square feet) and Float F (120 square feet). Float E would located in the same location as previous Float B and connect to Float C via the connecting walkway (Float DJ. Float F would be attached to Float C to provide tie up for boats as needed. SE07-23-5 PORTION CW #2 LOCATED ON W BANK OF CEDAR RIVER IN E 1/2 OF Page 1 of 2 City of Renton Department of Communit conomic Development Renton Rowing Float Replacement Certificate of£ tion from Shoreline Substantial Development LUA16-000448, SM£ SECTION 07-23-05 & MORE PARTICULARY DESCRIBED AS TRACTS 1 THRU 6 AS SHOWN ON CITY OF RENTON ENGINEER MAP B 92-50 DATED MAY 23, 1957 TGW BLOCK A & B OF LAKE WASHINGTON SHORE LANDS 3RD SUPL WATER BODY: Lake Washington An exemption from a Shoreline Management Substantial Development Permit is hereby Approved on the proposed project in accordance with RMC 4.9.190C 'Exemption from Permit System' and for the following reasons: Normal maintenance or repair of existing structures or developments, including damage by accident, fire or elements. "Normal maintenance" includes those usual acts to prevent a decline, lapse, or cessation from a lawfully established condition. "Normal repair" means to restore a development to a state comparable to its original condition, including but not limited to its size, shape, configuration, location and external appearance, within a reasonable period after decay or partial destruction, except where repair causes substantial adverse effects to shoreline resource or environment. Replacement of a structure or development may be authorized as repair where such replacement is the common method of repair for the type of structure or development and the replacement structure or development is comparable to the original structure or development including but not limited to its size, shape, configuration, location and external appearance and the replacement does not cause substantial adverse effects to shoreline resources or environment. The proposed development is: Consistent with the policies of the Shoreline Management Act. Not Applicable to the guidelines of the Department of Ecology where no Master Program has been finally approved or adopted by the Department. Consistent with the City of Renton Shoreline Master Program. SIGNATURE & DATE OF DECISION : '"""~~,!,~a= ' Date The administrative land use decision will become final if not appealed in writing together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057 on or before 5:00 pm, on July 25, 2016. Additional information regarding the appeal process may be obtained from the Renton Cit~ Clerk's office, Renton City Hall -7th Floor, (425) 430-6510. Attachments: Vicinity/Neighborhood Detail Map, Site Plan cc: Renton Rowing Center Cheryl Eastberg -Applicant City of Renton -Parks Department Kelly Beymer -Owner Page 2 of 2 LAke WAshlngton ' ~N VICINITY MAP ' -I • 0 "' North dock South dock 12~ --+ • ..., :2:: 3 _..,, _________ 92'. ····1-"' ~6' .:-'.'._: -~,.; . ,q?' ·.-. --1 --···~----"--~~--,_ ~;; ... I 12' WIDE WATERWALX ITYP J I tit> 'i,f. ~ 24' ----.,........-~~"-----~- f i ~~-tJ: ' :: -... ,. X 18' A I i · -It ti II I 3 -f 1ST ING _ ' : : 'J BOAT HCtJSE ~ ~ : 65'x 20·5 j " : : "' I Existing· 1"'!>00 ~.f- f tJo~TH :_AJ ~') North flci:it = 1170 sf, South "tii.aJ = 1300 sf Total sf= 2470 sf E'>Ci~il\~ Condi ii t»'l ~ r-t __ _ • t·: If) ~ '!'"~~ 'C: 9Z T3GJ.. . .31! t I • ····~4 ( fJ, '7' =-v• -~ ~-·--------•--~=:..~•------- 12' WIDE WATEffNAU<.........._ (TYPJ '-.. 24' .._..,,,.... , •.. ··-l!l'·r, • Ii • I. , , -. ..... r: 2 II .. r I . ~ ~ -~---... -~ :: : '. B ;J ' !: fl ! , f j BOAT HOUSE • •• ,u ,"I 1§1 j -·-~ I I, : 1 ! . 11"" ... I..., II new !1 Ola t:) 0 New= 1165 sf 'PhA.\• I )Phase J remove A • newceo • (\I a, C\I - .,,.-- / I I I I I I I I I I I :ic:: I ~ : ~~ I ii.u-.. I 1,..Q.. C\,-<).. I -~!:: I I -Q. .... I I I I I I I I i I " 1·~~•:!!1!/ti&dJ& :ZJZJI& Chervl EastberR Renton Rowing Center 3320 Fuhrman Ave E Seattle. WA 98102 Kellv Bevmer City of Renton -Parks Department 1055 S Grady Way Renton. WA 98057-3232 DEPARTMENT OF COMMI TY -----~Renton 8 AND ECONOMIC DEVELOPMENT PLANNING DIVISION CERTIFICATE OF EXEMPTION FROM SHORELINE SUBSTANTIAL DEVELOPMENT DATE: PROJECT NUMBER: PROJECT NAME: PROJECT MANAGER: OWNER: APPLICANT: PROJECT LOCATION : PROJECT DESCRIPTION: SEC-TWN-R: LEGAL DESCRIPTION: (King County Assessor) June 30, 2016 LUA16-000448, SME Renton Rowing Float Replacement Jill Ding, Senior Planner Kelly Beymer 1055 S Grady Way Renton, WA 98057-3232 Cheryl Eastberg 3320 Fuhrman Ave E Seattle, WA 98102 1060 Nishiwaki Lane CONCURRENCE DAl'E C, l"30/1'9 NAME \~~(~ SJ! .,. } I u~\~!; NI/\ ~, 'f... ScJ:rn'-. 7ft, //{,. 1"J ~~~ The applicant is requesting a Shoreline Exemption for the replacement of two existing floats (Floats A and B) at the Cedar River Boathouse. The project site is located within the Urban Center (UC) zone and is within the High Intensity Shoreline Designation of Lake Washington, Reach I. The proposal would replace two floats with wood decks with new floats and a connecting walkway (Floats C, D, and E) that meet current standards for materials, floatation, and decking. The existing two floats are old, deteriorated and at the end of their lifespan. Float A (1,170 square feet) is tied to the north side of the existing pier and is not in use. Float B (1,300 square feet) is located on the south side of the existing pier and is in use for boating activities. The replacement is proposed to occur in two phases: Phase I would involve the removal of Float A from the water at a nearby boat ramp to be demolished and disposed of properly, Float C (975 square feet) would be installed next to the existing boat house to be used as the primary float for boathouse activities. Float B would be repositioned to the east of new Float C and connected to Float C via a connecting walkway (Float D, which totals 190 square feet). Phase II includes the removal of Float B for proper disposal and the replacement with new Float E (1,180 square feet) and Float F (120 square feet). Float E would located in the same location as previous Float B and connect to Float C via the connecting walkway (Float D). Float F would be attached to Float C to provide tie up for boats as needed. SE07-23-5 PORTION CW #2 LOCATED ON W BANK OF CEDAR RIVERINE 1/2 OF Page 1 of 2 City of Renton LAND USE PERMIT MASTER APPLICATION PROPERTY OWNER(S) PROJECT INFORMATION NAME: PROJECT OR DEVELOPMENT NAME: City of Renton: Renton Rowing Float Replacement Kelly Seymer and Michael Kirk -----·---- 1055 S. Grady Way ADDRESS: PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE: Cedar River Boat House/Waterwalk ------ CITY: 1060 Nishiwaki Lane, Renton, WA 98058 Renton, ZIP: 98057 WA -- TELEPHONE NUMBER: KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): Parcel # 072305-9096 APPLICANT (if other than owner) NAME: Cheryl Eastberg EXISTING LAND USE(S): City Park -------------- COMPANY (if applicable): Renton Rowing Center/George Pocock PROPOSED LAND USE(S): City Park Rowing Foundation ------- EXISTING COMPREHENSIVE PLAN MAP DESIGNATION: ADDRESS: 3320 Fuhrman Avenue East Commercial Mixed Use ---------------- CITY: ZIP: Seattle WA 98102 PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION (if applicable) N/A ------·-. ·- TELEPHONE NUMBER: EXISTING ZONING: 206 724 3300 Urban Center (UC) CONTACT PERSON PROPOSED ZONING (if applicable): NIA NAME: Cheryl Eastberg SITE AREA (in square feet): Total Float Area 2465 SF ------- COMPANY Renton SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE Rowing Center/George DEDICATED: Pocock Rowing None Foundation -·----------------·--·-·· -----·-·----· 3320 Fuhrman Ave E SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS: ADDRESS: None -~------------------- H:\My lJocuments\WP\Renton Rowing Land Use Master App 2016.Jtll.: -I -03111 CITY: Seattle WA ZIP: 98102 TELEPHONE NUMBER AND EMAIL ADDRESS: H:\My Documents\WP\Renton Rowing Land Use MasterApp 20I6.doc -2 - PROPOSED RESIDE IAL DENSITY IN UNITS PER NET ACRE (if applicable) None NUMBER OF PROPOSED LOTS (if applicable) None NUMBER OF NEW DWELLING UNITS (if applicable): None 03/11 tOJECT INFORMATION (co nued) ~-------------------~-~-----~------------, NUMBER OF EXISTING DWELLING UNITS (if applicable) N/A PROJECT VALUE: $102K SQUARE FOOTAGE OF PROPOSED RESIDENTIAL BUILDINGS (if applicable): N/A IS THE SITE LOCATED IN ANY TYPE OF ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE SQUARE FOOTAGE (if applicable): SQUARE FOOTAGE OF EXISTING RESIDENTIAL BUILDINGS TO REMAIN (if applicable): NIA SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL BUILDINGS (if applicable): N/A D AQUIFIER PROTECTION AREA ONE D AQUIFIER PROTECTION AREA TWO r-----------------------·-·--- SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL BUILDINGS TO REMAIN (if applicable): NIA NET FLOOR AREA ON NON-RESIDENTIAL BUILDINGS (1f applicable): N/A D FLOOD HAZARD AREA D GEOLOGIC HAZARD D HABITAT CONSERVATION ___ sq.ft. ___ sq.ft. ___ sq.ft. Yes SHORELINE STREAMS & LAKES 2465 SF NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE NEW PROJECT (if applicable): N/A D WETLANDS ___ sq.ft. LEGAL DESCRIPTION OF PROPERTY (Attach legal description on separate sheet with the following information included) SITUATED IN THE (E Y:,) OF SECTION (07) TOWNSHIP(23) RANGE(05) IN THE CITY OF RENTON, KING COUNTY, WASHINGTON AFFIDAVIT OF OWNERSHIP I, (Print Name/s) / f,// £-c:{_ s-f-/J ._{ !-[' , declare under penalty of perjury under the laws of the State of Washington that I am (please c ck one) __ the current owne of the property involved in this application or L the authorized representative to act for a corporation (please attach proof of a horization) and that the foregoing statements and answers herein contained and the in rm lion herewith are in all respects true and correct to the best of my knowledge and belief. Date Signature of Owner/Representative STATE OF WASHINGTON ) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that C ,-; c /2 '1 '-C A s1l3EC & signed this instrument and acknowledge it to be his/her/their free and voluntary act for the uses and purpose me~l~~ j~ the instrument. ~,''\;j,.AIZ11r ( 0/11,-., ff~~... "ti.,1,, Dated :? "if ._...-i-\ -z_ -.; o ~c :::o:: • ., 1 . ,.,. :;. .. f u :-~ ~ ~ ... 'I\.:;'.( ~ l.... •u•"" ":: -~ 1 .. ,,. ,, ~~ ::,·: ,: ,,,,. s~O .,..::-~-.; Notary (Print): ,D, "f m I fCQL A-rz I vc.. Date J_, _ 1$'}' 111\\,\\',\\~~,~~ ~-,, ,,;'1rt, Of~ My appointment expires: _8~-' ~I~-------------- H:\My Documents\WP\Renton Rowing Land Use MastcrApp 2016.d11,.; -' -03111 I LAG-14-001 -------rf P1it, r c1r1 ~~1j 1 ~ ... ''~ . ...,,r J,,,,.;& ,..,. ~ --,,,-.,.,.~ CEDAR RIVER BOATHOUSE AGREEMENT THIS AGREEMENT ("Agreement") is made as of this 1" day of March, 2014 (the "Effective Date") by and between the City of Renton ("Renton"), a noncharter code city under RCW 35A, and a municipal corporation under the laws of the State of Washington, and The George Pocock Rowing Foundation, referred to as "Lessee", for the purpose of Lessee operating rowing club and paddle craft rental, business at the Cedar River Boathouse. Renton and Lessee are at times collectively referred to as "Parties" and for the full mutual consideration detailed below, the Parties agree: A. B. DEFINTIONS: 1. "Laws" shall mean all applicable federal, state or municipal statutes, ordinances, guidelines, directives, policies, regulations, rules, and code requirements. 2. 3. 4. ' "Net" shall mean the value preceding or accruing from the sale of goods, food, services and business transactions of every kind occurring on the Premises without any deductions for cost of products sold, material used, labor or other expenses whatsoever paid or accrued. It excludes monies collected for Washington state sales taxes from the purchaser of food, goods, and services. "Premises" shall mean the real property, including any structures or appurtenances owned, leased and/or controlled by the City of Renton known as the Cedar River Boathouse at insert address. "Term" shall mean the period of time the Lessee is authorized to utilize the Premises as detailed in Section C. GRANT OF LEASE: PREMISES 1. Renton grants to Lessee, for and upon the conditions and provisions provided in this Agreement, the exclusive Lease, right and privilege to manage and operate a rowing club and paddle craft rental business at the Cedar River Boathouse, as depicted on Exhibits A, B, C, D, and E wl'tich are attached and folly incorporated into this Agreement· by reference. 2. The specified Premises shall include and be limited to: a. The Cedar River Boathouse is located on a concrete slab on pilings. The facility has a total enclosed floor area of 3,128 square feet with an additional mezzanine · of 1,292 square feet as show on attached Exhibit A. b. An agreed-upon amount of parking/parking area. 3. All of which facilities and/or grounds shall be referred to as "Premises." 4. Lessee shall not use the Premises for any other purpose without the prior written consent of Renton, which may be withheld for anyreason. 5. Lessee has either examined the Premises or has waived examining the Premises and accepts the Premises as is, in its present condition as part of the consideration of this Agreement, and Lessee accepts all related liabilities and risks related to use of the Premises. 6. Lessee shall not use the Premises, the adjacent right-of-way, or access areas in any way that interferes with Renton's use of the property to city purposes. Similarly, other than for the use provided for in this Agreement, Renton shall not unreasonably use, or permit its agents, employees, representatives, tenants, or volunteers use any portion of the Premises In any way that materially interferes with Lessee's operations that are authorized by this Agreement. C. TERM This Agreement shall exist for a period of five (S) years from the Effective Date ("Initial Term"), and with both Parties' written approval this Agreement may be extended for an additional one- year (1) period ("Extension" or Extension Term"). If the Parties mutually agree then this Term shall be automatically extended unless either party provides written notice to the other at least six (6) months prior to the expiration of either the Initial Term or any expiration of any Extension. The Initial Term and any Extension or Extension Term may be referred to collectively as ''Terni." D. CONSIDERAllON 1. The Parties mutually and voluntarily agree that the Lease rights and privileges for the · term specified in .Section · C are given in exchange for Lessee's agreement to the following: a. Lessee may/will provide certain services to the public consistent with this Agreement. b. Lessee's payment to Renton shall be on the following schedule: 1. The first year's rent will be $12,500.00, payable as eleven equal monthly payments of $1,000 and a twelfth monthly payment of $1500.00. All payments are due on the 10th of the month. 2. The second year's rent will be $16,250.00, payable as eleven equal monthly payments of $1350.00 and a twelfth monthly payment of $1400. 3. The third year's rent will be $20,000.00, payable as eleven equal montl1ly payments of $17Q()j)C, and-a twelfth monthly payment-of--- $1300.00. 4. For each subsequent year, the rent shall increase by 3%, payable as eleven equal monthly payments of $1700.00and a twelfth monthly payment of the balance of the annual rent due. Lessee will also be responsible for payment of State Leasehold Excise Tax of 12.84%. However, lessee may obtain, on an annual basis, a non-profit excise tax exemption certificate from the Department of Revenue, and as long as this certification is provided to the City and in force, lessee will be exempted from paying the excise tax. Renton's receipt or acceptance of any Payment, Rent or Consideration, with knowledge of Lessee's breach of this Agreement or Lessee's default that is related to this Agreement or impacts this Agreement shall not constitute or be deemed a waiver of any provision of this Agreement. c. If after the end of the Initial Term or any Extension Term, Lessee continues to use the Premises without entering into a new lease with Renton, and/or Renton has not sent Lessee written notice to terminate or not renew the Agreement, Lessee shall become owe Renton any Rent on a month-to-month basis on the same terms and conditions of this Agreement, and any new terms required by Renton, and pay monthly Rent in an amount equal to One Hundred Twenty Five Percent (125%) of the prevailing monthly Rent which was payable during the Term of this Agreement. E. OPERATION AND SERVICES 1. Facilities: Lessee agrees to and shall operate and manage the Premises in accordance with the following requirements: a. Canoe, Kayak, and Stand-up Paddle Board Rentals per the Addendum attached as Exhibit B. b. Renton Rowing Center operated under the conditions contained in Exhibit C. 2. Lessee's Staff: 'An experienced on-site mana,~er shall be selected and designated as the Lessee's authorized representative who shall oversee all operations on the Premises and transmit and receive communications to and from Renton. A designated Lessee employee shall meet quarterly with a representative of Renton to discuss operational concerns. Lessee shall employ competent, courteous and efficient staff in numbers to adequately serve its patrons. All Lessee staff members shall, while on duty, be equipped with any apparatus or clothing that may be required by law, ordinance or regulation. Lessee staff will be encouraged not to smoke within the vicinity of the Cedar River Boathouse. In all aspects of employment, appearance, professional level, training, and operation, Lessee shall, at a minimum, meet standards and requirements as set forth in the proposal submitted to Renton and attached and fully incorporated by reference as Exhibits B and C. 3. Deliveries: Deliveries to the Premises shall be made in early morning hours or late afternoon hours to minimize the impact on park operations and pedestrian traffic. 4. Promotions/Advertising: All advertising shall require Renton's prior written approval. All promotions must be coordinated with Renton's Community Services Department and Lessor shall respond within five business days. 5. Signage: 'All graphics placed upon or affixed to any of the Premises shall be subject to Renton's prior written approval and shall not include product or commercial advertising. Lessee will follow all City sign codes, including A-frame signs. Lessee shall submit detailed plans and secure any needed permits/approvals for all exterior and interior signs. In all cases, signage shall be consistent in size, color, lettering, and theme to regular park signage and specifications. .G. CAPITAL IMPROVEMENTS/REMODELING 1. Lessee shall, prior to commencing any alterations, improvements or construction,. 2. 3. 4. 5. 6. 7 .. 8. 9. submit to Renton in writing, plans for alterations, improvements, and construction along with a breakdown of costs for such improvements. All plans submitted require Renton's written approval prior to commencement of any alteration, improvements, or construction. Renton agrees to promptly review said plans, and if the alterations, improveme1'ts, and construction are acceptable, to promptly approve the same, and the plans as approved shall be attached to an executed copy of this Agreement and incorporated into this Agreement. All work performed shall be done to Renton's satisfaction and shall be carried out in a manner that minimizes impact upon the public's use of the park. Lessee shall comply with all applicable Laws, and shall obtain and provide to Renton all required permits, prior to commencing any construction on the Premises. Renton may enter the. Premises and inspect any capital improvement work at any time to insure that such work is in accordance with the plans approved by Renton. In the event any such work i~ not according to the Renton approved plans, Renton shall send a Notice of Noncompliance to Lessee. If Lessee fails to make corrections within twenty (20) calendar days after Lessee's receipt of such Notice of Noncompliance, Renton may make whatever corrections are necessary to bring such work into compliance with the approved plans, at Lessee's sole expense. Renton's failure to object to or correct unapproved work shall not be a waiver of any right or remedy or an acceptance of the deviation from approved plans. Prior to commencement of any construction work, Lessee shall provide payment and performance bonds, in Renton City Attorney approved forms, payable to Renton in full and Just value of such capital improvements, conditioned that all provisions of this Agreement relating to capital improvements shall be faithfully performed by Lessee, or the surety, if required. Lessee shall furnish Renton with a complete set of reproducible 22x34 Mylar drawings reflecting the .final "as-built" condition of ·an capital improvements within thirty (30) calendar days_ afte~ ~on,pletiO!J oftht?_ ~e>nst~u~i.on. Lt?_SS!!la! sll_aU f(!rJ1i~li to0 f!en_t~I! _____ _ .copies of all operating manuals, equipment brochures, paint schedules, and material brochures for such improvements. Lessee will use recycled products when feasible. All permitted alterations, improvements, and constructlpn shall become the Renton's property upon termination or expiration of this Agreement and shall be installed solely at Lessee's expense unless Renton expressly agrees in writing to contribute toward such costs. Any unperrilitted alteration, Improvement or construction shall be repaired in full and to the satisfaction of Renton, at Lessee's sole expense. Failure to repair shall result in Lessee being responsible for the removal of the unpermitted alteration, Improvement or construction, and to return the facility to its previous condition to the satisfaction of Renton, at Lessee's sole expense. Prior to performing any construction work within, on or adjacent to the Premises, in addition to obtaining Renton's written approval, Lessee shall secure all applicable federal, state and municipal permits, licenses, and proof of agency. To the extent authorized by law, Renton agrees to cooperate with Lessee, at no cost to Renton and with all costs to be borne by Lessee, in the submission and/or processing of any applications and/or pfocessing of such applications; agrees to execute lawful documents as required; and agrees to take no unreasonable action that Will inhibit, impede or delay Lessee's ability to obtain the abovementioned permits, licenses and proof of agency. H. UTILITIES At the present time, Electrical power, water and sewer service are provided via the Boeing utility grid. Telephone service is provided via the City's IT services, and Garbage collection is provided by Waste Management. Lessee shall be solely responsible for obtaining, retaining, maintaining, and paying for any utilities and/or utility installations. The City shall not be held responsible for any changes in the provision of electrical, water and sewer services. Le~see shall be solely responsible for payment of all utility charges and any related penalties and fees. At the end of the Term, the installed utility hardware shall be the property of the City of Renton unless owned by the utility or unless the Parties reach a written agreement detailing another resolution or disposition of the installed utility hardware. Renton shall not be liable for any damages to any person, property, or monetary, nor shall Lessee be relieved from any of its obligations under this Agreement, as a direct or indirect result of temporary interruption in the electrical power provided to the Premises, unless Renton intent to cause such interruption caused the temporary interruption. ' At its sole expense, Lessee may install a backup generator .in a location and manner that Renton · approves, in order to provide electrical service during emergency situations where electrical power is not available. Renton may deny approval of such a backup generator for any reason. I. . . i AXES-FEES Lessee agrees to pay all taxes and assessments which are the result of Lessee's use of the Premises and/or which may become a lien on Lessee's interest In accordance with RCW 79.44.010 (Lands subject to local assessments). Lessee shall timely pay all taxes, fees; charges, and costs arising out of the use and occupancy of the Premises including, but not limited to, charges imposed for governmental inspections or examinations, license and excise fees, taxes on Premises personal property, workers' compensation and/or insurance and the leasehold interest created by this Agreement. J. CUSTODIAL MAINTENANCE OF PREMISES 1. Lessee shall be solely responsible for, at all times: a. Keeping the Premises and adjacent area in a very neat, clean, safe and sanitary condition; K. L. b. · Keeping the glass of all windows and doors clean and presentable; c. ~urnishlng all pre-approved cleaning supplies, materials and equipment needed to operate the Premises in the manner prescribed in this Agreement and d. Providing all necessary janitorial service to adequately maintain the Premises on the frequency schedule attached as Exhibit D. 2. With two-day advance notice, Renton may conduct periodic inspections of the buildings and grounds and shall notify Lessee in writing to make changes in maintenance methods or to make immediate repairs to areas affected by unacceptable mainteriance methods. Lessee shall make changes or repairs as reasonably directed by the city staff. 3. Renton's right to inspect the Premises and any work, changes, alterations or improvements, made by Le.ssee shall not impose an obligation upon Renton to make inspections of Lessee's work, changes, alterations or improvements and does not relieve Lessee of the sole liability related to the Premises and sole responsibility of satisfying Laws and/or making any relat~d payments, or satisfying.any related fees, fines, or costs. 4. Lessee is required to contract with a qualified pest control company to control the rodent population around the Premises and below the decks. Lessee may provide for janitorial services by· contract with a third-party, which shall be subject to this Agreement and the prior written approval of Renton. All related expenses are solely the Lessee's responsibility. . 5. Lessor will provide all preventive and normal maintenance and upkeep on HVAC equipment. Lessee shall be solely responsible for all plumbing fixtures and repairs including hot water heaters, drain maintenance, and any upgrades needed by current codes. Lessee shall provide all maintenance on Premises doors and door hardware including locks. 6. Lessee must notify Renton and obtain Renton's written approval before installing any . new equipment, fixtures, other improvements, or making any material changes in the equipment, size or design of any such equipment in or on the Premises that requires a building permit by City code. Absent the need for a building permit,' Lessee is exempted from this provision for changes up to a value of $5,000. Any change that alters the exterior appearance of the building requires Renton's prior written approval. EQUALITY OF TREATMENT Lessee shall conduct its business in a manner that ensures fair, equal and non-discriminatory treatment at all times in all respects to aU persons without regard to race, color, religion, sex, sexual orientation, marital status, age or national origin. No person shall be refused service, be shown discriminatory treatment, or be denied any privilege, use of facilities, or participation in activities on the Premises based on: race, color, religion, sex, sexual orientation, marital status, age, or national origin. Failure to comply with any of the terms of this provision shall be a material breach of this Agreement. NON-DISCRIMINATION Lessee shall comply with all applicable Laws_ regarding non-discrimination in employment, the provision of services to the public in a non-discriminatory manner, and affirmative action, including but not limited to the provisions of the Renton Fair Practices Policy as attached (Exhibit E) and fully incorporated by reference into this Agreement. The Boathouse complies with ADA requirements. In operation of the Boathouse, Lessee shall · comply with all provisions of the Americans with Disabilities Act. Lessee is solely responsible for any structural changes required by the Act. M. INSURANCE N. 1. Lessee's Insurance. Lessee shall secure and maintain the following insurance policies; and shall not cancel or suspend the insurance policies identified below, except after twenty (20) calendar day's prior written notice by certified-mail to the City of Renton: a. Commercial General Liability Insurance: Commercial general liability insurance in · the minimum amounts of $1,000,000 for each occurrence/$2,000,000 aggregate throughout the duration of this Agreement. b. Workers' Compensation: Workers' compensation coverage, as required by the RCW 51, Industrial Insurance laws of the State of Washington. . c. Renton as an Additional-Insured: It is agreed that on Lessee's commercial general liability policy, the City of Renton will be named as an Additional-Insured on a primary and non-contributory basis. Any coverage maintained by the City of Renton is solely for the coverage and benefit of Renton, and its elected officials, officers, agents, employees, representatives and volunteers. d. Verification of Coverage: Subject to Renton's review and acceptance, a certificate of insurance showing the proper endorsements, shall be delivered to Renton before executing the work of this Agreement. 2. Review of Policy: Upon request, the Lessee shall give Re.nton a full copy of the insurance policy for its records and for the Renton City Attorney's or Risk Manager's review. The policy limits may be reviewed and the value reassessed annually. 3. Termination: Notwithstanding any other provision of this Agreement, the failure of the Lessee to comply with the above provisions of this section shall subject this Agreement to immediate termination without notice to any person in order to protect the public . ~ interest, INDEMNIFICATION/HOLD HARMLESS Lessee agrees and covenants to hold and save Renton, its elected officials, officers, agents, representatives, and employees and volunteers harmless and to promptly indemnify same from and against any and all claims, actions, damages, Lessee's illegal conduct/violations of Laws, ·liability of every type and nature including all costs and legal expenses to the extent incurred by reason of the negligent acts or omissions of Lessee, including loss of life, personal injury and/or damage to property arising from or out of any occurrence, omission or activity upon, on or about the premises. This hold harmless and indemnification provision shall likewise apply for or on account of any patented or unpatented invention, process, article or appliance manufactured for use in the performance of the Agreement, including its use by Renton, unless otherwise specifically provided for in this Agreement. The Lessee agrees to name Renton as an Additional-Insured on a noncontributory primary basis. In the event Renton shall, without fault on its part, be made a party to any litigation commenced by or against Lessee, then lessee shall proceed and hold Renton harmless and he shall pay all costs, expenses and reasonable attorney's fees incurred or paid by Renton in connection with such litigation. Furthermore, lessee agrees to pay all costs, expenses and reasonable attorneys' fees that Renton may Incur or pay in the enforcement of any of the covenants, provisions and agreements. Nothing in this Agreement shall require the lessee to indemnify Renton against and hold harmless Renton, from claims, demands or suits based solely upon the conduct of Renton, its elected officials, officers, and employees and provided further that if claims or suits are caused by or result from the concurrent neglige_nce of (a) the Lessee's agents or employees and (b) Renton, its elected officials, officers, and employees, and involves those actions covered by RCW 4.24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement; etc., of structure or improvement attached to real estate or relative to a motor carrier transportation contract), this Indemnity provision with respect to claims or suits based upon such concurrent negligence shall be valid and enforceable only to the extent of the lessee's negligence or the negligence of the Lessee's agents or employees. Should a court of competent jurisdiction determine that this agreement is subject to RCW 4;24.115, (Validity of agreement to indemnify against liability for negligence relative to construction, alteration, improvement, etc., of structure or improvement attached to real estate or relative to a motor carrier transportation contract) then, In the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Lessee and Renton, its elected officials, officers, employees, agents, representatives and volunteers, the Lessee's liability under this Agreement shaU be only to the extent of the Lessee's negligence. It is further specifically and expressly understood that the Indemnification provided herein constitute the lessee's waiver of immunity under RCW 51,, the Industrial Insurance Act, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the Parties. The provisions of this section shall survive the expiration or termination of this Agreement. 0. STANDARDS Lessee recognizes th<1t, although it is operating its facilities as an Independent operator, Renton is organized and exists for the purpose of maintaining park and recreation facilities for the use and enjoyment of the general public. Lessee, its owners, principals, agents, employees and volunteers shall devote their efforts toward rendering courteous service to the public as though they were employees of Renton, with a view of add;ng to the enjoyment of the patrons of this city-owned recreational facility and/or Premises. Lessee shall operate and conduct the facilities on the Premises in a business-like manner, and will not permit any acts or conduct on the part of the Lessee's owners, principals, agents, P. employees and volunteers that would be detrimental to Renton's operation of the Cedar River Trail Park. CONTINUOUS OPERATION Lessee shall keep the Premises open and use them to transact business with the public daily during hours listed in Exhibits A and B of this Agreement. Subject to the prior written approval of Renton, Lessee may close any portion or all of the Premises for a reasonable period for repairs or remodeling, to accommodate the construction by Renton of public improvements, provided that a written notice of such impending closure is posted in a conspicuous place 011 the Premises for at least one (1) week immediately prior to the closure date. Lessee may close any portion or all of the Premises in an emergency without the approval of Renton, but is must· provide notice to Renton at the earliest reasonable opportunity. Renton reserves and retains the right to close Lessee's operation for its convenience upon written notice of not less than thirty (30) business days and to close any portion or all of the Premises immediately in case of an emergency. Q. COMPLIANCE WITH LAWS Lessee shall comply with all applicable Laws, as previously defined in Section A.1. Lessee shall not use the Premises to any illegal purpose or to violate any Law; Lessee shall not create or allow any nuisance or hazardous materials on the Premises; Lessee shall not permit or do.any act on the Premises that would increase the rate of insurance on or for the Premises; and Lessee shall not damage or overload the structural components of any structure, fixture, or.part the Premises. The provisions of this section shall survive the expiration or termination of this Agreement. R. UN USABILITY s. Either party may terminate this Agreement in the event that all or a substantial portion of the Premises is rendered unusable by an Act of God, fire, flood, earthquake, act of war or other _. extraordinary casualty destroying.or damaging the Premises-by notice-given the other party-... -- within thirty {30) calendar days after such conditions are discovered. Neither party shall be required to restore or reconstruct the Premises. During any period of Premises use subsequent. to said thirty (30) calendar days, the annual payment payable under Section D shall be reduced by the ratio that the area rendered unusable by such extraordinary casualty and not reconstructed or repaired bears to the total area cifthe Premises. SURRENDER OF PREMISES AND REMOVAL OF LESSEE'S PROPERTY 1. Upon termination or expiration of this Agreement, Lessee shall surrender the Premises to Renton and promptly surrender and deliver to Renton all keys, passwords or passcodes that it may have to all parts of the Premises. 2. The Premises shall be surrendered to Renton in as good a condition as at the date of execution of this Agreement, except for the effects of reasonable wear and tear, alterations, and repairs made with concurrer,ce of Renton, and property damage by fire and other perils insured In coi:itracts or policies of all risk Insurance. 3. Prior to the expiration of this Agreement, Lessee shall remove from the Premises, at its sole expense, all fixtures, equipment, furnishings, and other personal property owned and placed in or on the Premises·by Lessee. 4. If after termination or expiration of this Agreement, Lessee has not removed its property and fixtures within the time allowed, Renton may, but need not, remove said personal property and hold it for the owners, or place the same in storage, all at the expense and. risk. of the owners, and Lessee shall reimburse Renton for any expense incurred by Renton in connection with such removal and storage. Renton shall have the right to sell such stored property, without notice to Lessee, after it has been stored for a period of thirty (30) calendar days or more; the proceeds of such sale to be applied first to the cost of sale, second to the payment of charges for storage, and third to the payment of any other amounts which may then be due from Lessee to Renton, and the balance; if any and if requested, shall be given to Lessee. T. TERMINATION 1. Waiver or acceptance by Renton of any default by ~essee of the terms of this Agreement shall not constitute or be deem.ad as a release of Lessee's responsibility · for any prior or subsequent default. 2. Renton shall have the right to terminate this Agreement immediately, after five (S) calendar days written notice, if a receiver is appointed to take possession of Lessee's assets, Lessee makes a general assignment for the benefit' of creditors, or Lessee becomes insolvent or takes action under the Bankruptcy Act. 3. Renton shall have the right to terminate this Agreement, upon thirty (30) calendar days written notice to Lessee, without penalty or further liability to Renton, upon the occurrence of any of tbe following events: i. Renton reasonably determines that Lessee's exercise of its rights under this Agreement unreasonably interfere with Renton's use of the Premises and/or the structures on the Premises for the lawful municipal purposes for which Renfori owns and administers suc-h sfructures!site. --- II. Renton reasonably determines that Lessee's exercise. of its rights under this Agreement unreasonably interferes with the use of the Premises or structures thereon by a governmental agency with which Renton h,as an agreement to provide services to Renton. iii. Lessee breaches any material term or covenant of this Agreement. iv. The Pr_emises is destroyed or damaged so as to substantially and adversely affect the effective use by Lessee for Lessee's equipment, subject to the Lessee's determination (within ten 10 calendar days) of whether the equipment can be restored or rebuilt. Lessee shall have the option of installing a temporary facility while Lessee makes that determination. Such facility shall be subject to prior review by Renton and shall conform to all Laws by any regulatory agency or governmental entity with jurisdiction in the matter. Payrnent of the monthly rent shall continue throughout -the evaluation and temporary installation period. 4. Lessee may terminate this Agreement without penalty of further liability as follows: i. The approval or consent of any governmental authority necessary for the construction and/or operation lessee's business is withheld, revoked · or terminated, or Lessee determines, in its sole discretion, that the cost of obtaining or retaining such approval is cost prohibitive; or ii. Renton breaches any material term or provision of this Agreement. 5. Upon termination under this section, neither party will owe the other any further obligation provided that lessee is not in arrears in making its monthly Rent payments provided however that Lessee shall remove its equipment and ,restore the site. U. ENTRY Renton's representative(s) may enter the Premises during normal operating hours for the purpose of inspecting or repairing the same except in the case of emergency, but this right shall impose no obligation upon Renton to make inspections to ascertain the condition of the Premises in addition to Renton's responsibility to conduct annual inspections and shall. impose no liability 9r responsibility other than to inform Lessee of any defect. V. LIENS AND ENCUMBRANCES Lessee shall not have or allow any liens or encumbrances on the Premises. At Renton's request, lessee shall furnish Renton written proof of payment of any item which would or might constitute the basis for such a lien on the Premises if not paid. W. ACCESS TO BOOKS AND RECORDS; CASH REGISTERS Renton, during business hours, shall have the right to examine and inspect the books and recorcllrof Lessee related· fci 6r connected with the 6usiness conducted upon the Premises to· - determine compliance with this Agreement's provisions. Lessee shall record all sales in a type of cash register that contains a tape or device that records and identifies the date, type of sale, and the amount of each transaction; that is equipped with a cumulative, non-alterable accounting control mechanism; and that is subject to approval by Renton's Finance Department. Lessee shall also submit quarterly operating reports, which will detail sales, cost of sales, wages/benefits, operating expenses, administrativ.e expenses, internal corporate payments, and depreciation/amortization. X. AMENDMENTS. Except as ls specifically provided for in this Agreement, this Lease shall not be amended or changed except by written instrument signed by both Parties. Y. ASSIGNMENT OF AGREEMENT z. Lessee shall not assign or transfer this Agreement or otherwise convey any right, privilege or interest granted by this Agreement or any part of the Premises without Renton's prior written consent. This Agreement and any right, privilege, or interest derived from this Agreement shall not be transferable by operation of law, by any process, or by any court proceedings. Lessee shall not -sub-lease or co-habitat businesses or other enterprises in or on the Premises without prior written approval of the City of Renton. EXECUTED IN COUNTERPARTS This Agreement ·may be executed in any number of counterparts, each of which shall be an original, but all of which together shall constitute but one instrument. AA. GOVERNED BY LAWS OF STATE OF WASHINGTON: INVALIDITY OF PROVISIONS This Agreement .shall be governed by the laws of the State of Washington. If any term or provision of this Agreement or application of this Agreement shall to any extent be invalid or unenforceable, the remainder of this Agreement shall not be affected and shall remain valid and enforced to the fullest extent permitted by law. BB. DEFAULT OF FAILURE OF CONSIDERATION cc. Renton may terminate this Agreement and take immediate possession of the Premises in the event that Lessee failed to perform any of the covenants or conditions of this Agreement and such default or deficiency in performance was not remedied by Lessee within thirty (30) calendar days after receiving written notice stating the nature of the default or deficiency and Renton's intention to terminate if not corrected. MODIFICATION The Parties reserve the right to amend this Agreement as may be mutually agreed. No amendment shall be effective unless signed by each party's authorized representatives. -OD. NON-APPLICABlblTYOFRELOCATION BENEFITS· Lessee accepts and agrees that the signing of this Agreement does not entitle Lessee to assistance under RCW 8.26, Relocation Assistance -Real Property Acquisition Policy. EE. NOTICES Except as otherwise designated in this Lease, all notices hereunder must be in writing and shall be deemed valid given if sent by certified mail, return receipt requested, or overnight delivery, addressed as follows or as otherwise specified by the City during the duration of this Lease: City: Mr. Peter Renner . City of Renton Community Services · Lessee: Facilities Director 1055 South Grady Way Renton, Washington 98055 Matthew Lacey, Executive Director George Pocock Rowing Foundation 3320 Fuhrman Ave E Seattle, WA 98102 FF. PENALTY SECTION 1. There shall be a penalty for violation of this Agreement concerning the following: a. Cleanliness of Premises b. Cleanliness and presentability of staff (if a retail operation) c. Experience of staff (ditto) d. Signage e. . Repair of Premises f. Failure to provide complete monthly financial information (ditto) 2. For each violation within a six-month period, the following penalties shall apply: a. Written warning for first violation with reasonable time frame for corrective action. b. A $50.00 fine for second violation. c. A $100.00 fine for third violation and P.ach future violation. 3. Lessee may appeal any penalty to the Community Services Administrator or designee, whose decision shall be final. GG. VENUE Lessee agrees that the venue of any action or suit concerning this Agreement shall be in the King County Superior Court. HH. MEMORANDUM OF LEASE AGREEMENT The Parties shall enter into a short form Lease memorandum, in a form suitable for recording under State of Washington law, referencing this Agreement, and all options pertaining to this Agreement, which Lessee may, at its expense, file in King County, Washington. IN WITNESS WHEREOF, Renton has caused this Agreement to be executed by its proper officers duly authorized this :_5-1" day of 'itld«tt-4r , 20 Pl and the lessee has by the signature below signed with the intent of making effective and legally binding. LESSEE: Secretary-Treasurer STATE OF WASHINGTON COUNTY OF KING > ) )ss ) 02(t.Jf9/'2oli Mr 7!-f,( 1~ Ok/ Op.,~ On this ~ .. a day of !.-e.\iri~ . 20~ before me personally appeared to me known to be the.A16 M&!!, ~-0.,,0 _:_ -__ F , corporation that executed the foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes mentioned in the Agreement. WITNESS my hand and official seal the day and year in this certificate first above written. ,,__,.---ry Public in and for the State of Washington, residing at S.e \ \ \e · THE CITY OF RENTON Denis Law, Mayor Attest: Bonnie I. Walton Renton City Clerk STATE OF WASHINGTON )ss COUNTY OF KING . ) ~ G.,bn,=~. c?OlY ~ On this ef day of Ms1,"2ets-before me personally appeared~ ·· Q 1,lA,,AA,) . City of Renton, who executed the foregoing instrument for the uses and purposes mentioned, and on oath stated that he was authorized to execute said instrument . • ~@'I~ ..... d a 'cial seal the day and ye~[il~~~~Jirst above written. II ,~ .•:,S10N t,.,:•, 6, ~ 1-·~~ , .... ,' ' . . .. n and fort~ ~ CJ !0 ..\01 AR}'\\ ~ "'""""' .~ Washington, residing at , ~ : " -·-l ~ • " \ Pue1..,c. : 0~ .s ' . •• ~ \ <P~·· ••• 8 ... 27,'\~ ..... ~ \~ -s.. ~;,,,:-........ ,··~~-,,' --..:,~-OF W r,..S 1,1 11 J".,..,.,.,,1///III Exhibit A ;;o m z -I 0 z m m . >< 0~ ::c !j iii m ::c "C =i g> ~ cnz "C m Ill IQ CD liO .... C 0 0 ·;ii:; FIRST FLOOR PLAN Sll!!'.CDND FLOOR PLAN EXHIBIT A, Page 2, RENTON BOATHOUSE FLOOR PLANS Exhibit B Relative to public service provided Types of services provided The GPRF will provide a variety of rowing opportunities for youth and adults. Described in greater detail below, members will have the opportunity to participate in: Learn to Row classes, summer rowing camps, morning and afternoon coached practice sessions, independent rowing sessions, and recreational and competitive rowing teams. Members will also have the opportunity to participate in frtness and conditioning classes. Learn to Row Learn to Row classes are available to the public (no membership requirement to participate). Participants of all ages will have the opportunity to learn to row in a group setting. Learn to Row sessions will be i_nstructed by highly qualified coaches to ensure a safe and fun learning environment for all. Youth Rowing Programs Following Learn to Row, youth may continue rowing in a number of recreational classes focused on skill development, team building, fitness and fun. Youth who are interested in a more time-intensive rowing experience may join the competitive youth rowing team, otherwise known as "junior rowing." Junior rowing wi.11 be built around highly qualified and enthusiastic coaches with a high· coach to participant ratio. Our goals will be focused on learning· proper rowing technique, building teamwork and having fun. With these goals, we will develop cohesive boys' and girls' teams that compete both locally and nationally. Scholarships and Other Support Youth who face barriers to participation in rowing may apply to receive support through the GPRF's nationally recognized youth assistance program, Rainier Valley Rowing (RVR). Available assistance includes: financial -scholarships for registration and regatta fees, swimming instruction, mentorship, uniforms, training gear, and after-school snacks. No student will be turned away JQr Ja.c!< qf fu.I1qs. Ai;ld.iti_qr:ia.lly, YOllttl_ who receive support through_9.1JL~ssisb!nce __ program are also eligible to participate in enrichment activities focused on nutrition education, life skills, job skills, and college access. Once admitted into RVR, youth will have access to scholarships and _other support until they graduate from high school. Adult Rowing Programs After learning to row, adults can further pursue their development in rowing by becoming a member of Renton Rowing Center. Membership provides access to the equipment and ability to take part in the programming. Members have the ability to access the equipment and fitness room on their own schedule (excluding conflicts with youth programming). The GPRF will offer multiple ways for adults to be involved in rowing. Adult rowing is for all sizes, skills, and interests for everyone aged 19 and older. Newer rowers will move on to our intermediates program focused on skill development and small boat competency. Experienced rowers may participate on the racing team or in other (to be developed) coached sessions. Community Outreach The GPRF will work with existing community organizations, businesses and schools to ensure rowing programs are as accessible to the public as possible. Community outreach will include free boathouse tours for youth, adults, and families; low-cost after-school and summer camps; school field trips; corporate team building; and fun indoor rowing challenges. !he GPRF will also pilot an adaptive rowing program for youth and adults who have a variety of physical and intellectual disabilities. Value of service Obesity Prevention Access to high quality physical activity and sports is more important now than ever before. According to the Center for Disease Control, adult physical inactivity is more common among women than men and African American and Hispanic adults than Caucasians. The U.S. Department of Health and Human Services has also shown that less affluent households are more likely to be physically inactive-a major risk factor for obesity and a number of other poor health outcomes-than more affluent households.1 Researchers from the University of Washington looked at King County and found that the strongest predictor of obesity for an individual is the median property value of one's zip code2 . Obesity and other poor health outcome~ are also major risk factors for the youth of King County with one in five students.estimated as being obese or overweight'. Youth from low-income households and youth of color are · disproportionately affected by obesity4. Compared to the east side of the county,. rates of unhealthy weight are 1.3 times higher in south King County . . Despite these statistics, there is often a lack of access to quality physical activity, especially for youth. At first glance, rowing may seem like an odd mechanism for inspiring individuals, specifically youth, to meet their potential. However, the city of Renton -because ofits proximity to vast Waterways -is · uniquely poised to connect citizens to this transformative sport. Rowing is considered one of the best total body workouts. Rowing involves every major muscle group in the body providing an excellent vehicle for improving cardiorespiratory endurance, muscular strength and endurance, flexibility, and body composition. The basic mechanics of rowing are relatively easy making this efficient, low-impact sport appealing to people of all ages and abilities. 1 U.S.. Department of Health and Hwnan Services (1996). Physical Activity and Hell/th; A Report Qfthe Surgeon General. Atlanta, GA: U.S. Depertment of Health and Human Services, Centers for Disease Control and Prevention, National Center for Chronic Disease Prevention and Health Promotion. l Drewnowski, Adam, Colin D. Rehm, and David Solet. "Disparities in obesity rates: analysis by ZIP code area" Social Selene, & Medicin~ 65.12 (2007): 2458+ 3 Public Health Seattle & King County, Assessment Policy Development & Education. State Healthy Youth Survey (2011). 4 Financing Childhood Obesity Prevention Programs. The Finance Project. http://www.financeproject.org/publications/obesityprevenUon.pdf Social, Emotional, and Community Development The social and emotional benefits of rowing are boundless: a) often called "the ultimate team sport," rowing is ideal for instilling notions of persistence, resilience, and self-efficacy; b) because of its historical ties to Universities, rowing is steeped in a college-going culture and rich educational-networks: and c) as one of the most physically demanding sport, rowing enhances lifelong health and wellness. This powerful sport and these myriad benefits are typically only available to a small group of individuals. The underserved and at-risk youth who could most benefit from rowing's power have historically faced significant barriers to participation, including expensive program fees, lack of transportation, and lack of comfort and familiarity with water sports. The GPRF's tried and tested, collaborative approach will remove barriers to participation. Programs will be inclusive and accessible for youth and help them develop the tools they need for peak performance in school and life: • Skills to support lifelong fitness and improved health; - • Communication, teamwork, and leadership skills; • Conne.ctions with caring adult mentors who are focused on students' holistic success: · • Increased awareness of post-secondary educational opportunities, and • Connection to their community · and urban environment through appreciation of and access to natural resources. · Projected number of citizens served: Number of Dartlcloants 2014 2015 2016 Learn to Row 60 84 118 Junior Programming 30 42 59 Adult Membership -45 63 76 135 189 252 -. ·-.. ----·--. -----------. .. ' . ----. --··-··· ·-· -·· Hours of individual oarticioation 2014 2015 2016 Learn to Row 360 504 706 Junior Programming 7800 10920 -15288 Adult Membership 11250 15750 22050 19410 ,27174 38044 Exhibit C Addendum Canoe, Kayak, and Stand-up Paddle Board Rentals Introduction The GPRF values rowing and other boating recreation as a means of increasing water· access and engaging citizens In fun, healthy activities. As such, the GPRF plans to Incorporate canoe; kayak, and stand-up paddleboard (SUP) rentals into the Renton Rowing Center project as soon as possible. Goals 1. Provide affordable, family-friendly water-based recreation opportunities to enhance community participation, water-access, and boating-safety. 2. Expand Renton Rowing Center's recreational opportunities to Include canoe, kayak, _and SUP. 3.. Ensure Renton Rowing Center's long-term financial sustainability through revenue generated from rentals. Start-up Costs The GPRF will phase in the incorporation of canoe, kayak, and SUP rentals over the next two years. In 2014, the GPRFwlll spend approximately $25,700 on rental equipment, which will accommodate up to 24 people on the water at one time. In 2015, the GPRF plans to Invest approximately $11,000 to expand the rental program, which will accommodate an additional 12 people on the water. In 2014 and 2015 combined, we anticipate spending approximately $25,000 on staff wages to accommodate anticipated usage and peak hours. See Table 1 for details on start-up costs. Table 1 Start-up Costs Year One and 1\vo 2014 •' 2015 Number Total Cost Number Total Cost Staff 1 $10000 1.5 $15,000 SUP's 8 $8,000.00 4 $4,000.00 Sfo<>le Kavak 6 $4,800.00 2 $1,600.00 Double Tl" """1, 3 $6,000.00 1 $2,000.00 · C1111oe· -. 2-$1,600.00 · 1 .. $800.00 ... SUPnaddles 12 $1,800.00 6 $900.00 . Kavak naddles 14 $840.00 6 $360.00 Vests 30 $1,500.00 20 $1,000.00 Neonrene-•• 5 $425.00 5 $425.00 Other 5 $750.00 5 $750.00 Total $35.715.00 $26.835.00 Hours of Operation and Usage Canoe, kayak, and SUP rentals will be available to Individuals and groups from April through October each year. During peak season Qune -August), the facility will be open seven days per week for approximately nine hours per day (Table Z). We anticipate approximately 1250 rentals during year one with annual rentals Increasing every year through 2017 (Table 3). Table 2 Hours of Operation Dates Onen Last Boat Out Close June 1-September 30 10:00am M-F; 6:30pm M-Sat; 8:00pmM- 9:00am Sat & Sun 4:30pmSun Sat; 6:00pm Sun October 1-lulv 31 Some weekends TBA TBA Table 3 Projected Number oj Rentals 2014 2015 2016 2017 Jannsrv -March 0 0 0 0 ·-·----·-- Anril 10 25 40 60 Mav 25 75 100 150 June 150 200 300 410 Julv 450 500 540 700 Aum•st 500 560 605 700 Sentember 100 125 150 200 October 15 15 15 30 November -December 0 0 0 0 Total 1250 1500 1750 2250 Rental Fees Canoe, kayak, and SUP daily rental fees are based on existing rental fee structures from other local facilities. Year one fee structures for canoe, kayak, and SUP rentals are available in Table 4. Table4 2014 Rental Fees 1st Hour After 1st Hour Full Dav Sincrle Sea K.avak $18.50 $9.25 $69.00 Double Sea K.avak $25.00 $12.50 $94.00 Sini,le Sit-On-Too $14.00 $7.00 $53.00 Double Sit-On-Too $16.00 $8.00 $60.00 Canoe $18.50 $9.25 $69.00 SUP $18.50 $9.25 $69.00 ----·-· Drv Suit & Neonrene Booties $29.00 $29.00 $29.00 . . Exhibit D · Daily Remove all trash Vacuum all carpet Cedar River Boathouse Custodial Schedule Clean all entrance door glass Police outside area by entrance for trash, debris, butts Clean inner restrooms, mop floors Clean office area Wipe down tables and counters Pick up debris Spot clean all glass Weekly Remove stains on carpet from drinks and food Dust all horizontal surfaces Change out any burned out lights as needed Spot clean walls Wipe down door handles, light switches Semi-Annually Clean carpet and raise pile ' . Exhibit E Renton Policy and Procedure Manual 340-03 FAIR PRACTICES -1r(~mWt@1r1 ~~~ ?01!.IICV &. IPROCIEDI Subject: Index: HUMAN RESOURCES FAIR PRACTICES Number: 340-03 (supersedes 300-0i) Effective Date: Supersedes: Page: Staff Contact: Approved By: 2/15/2011 10/07/96 1 of 2 Nancy A. Carlson Denis Law 1,0 PURPOSE: To establish guidelines for the promotion of fair practice and nondiscrimination In activities relating to employment and treatment of all citizens. 2.0 ORGANIZATIONS AFFECTED: All departments/divisions and City officials. 3.0 REFERENCES: City Resolution #2340, Issued July 10, 1972. Revised February 9, 1976; June 2, 1980; arid October 7, 1996. 4.0 POLICY: The policy of the City of Renton is to promote and afford equal treatmerif;iiid service to all citizens and to assure equal employment opportunity to all persons regardless of race; religlon/creed; national origin; ancestry; sex; the presence of a physlcal, sensory, or mental disability; age o\/er 40; sexual orientation or gender Identity; pregnancy; HIV/AIDS and Hepatitis C status; use of a guide dog/service animal; marital status; parental/family status; military status; or veteran's status. This policy shall be based on the prlnclples of equal employment opportunity as set forth In federal, state and local laws. All departments of the City of Renton shall adhere to the following guidelines: 4.1 Employment Practices: All m:tlvlties relating to employment such as recruitment, selection, promotion, Printed on ll/27f.!0!3 l from Folio document 5.0 6.0 Renton Policy and Procedure Manual termination, and training shall be conducted In a nondiscriminatory manner. Personnel decisions will be based on individual performance, staffing requirements, and In accord with governing Civil Service .Laws and the agreement between the City of Renton and the Washington State Council of County and. City Employees. 4.Z Cooperation with Human Rights Organizations: The City of Renton will cooperate fully with all organizations and commissions organized to promote fair practices and equal opportunity in employment. 4.3 Contractors' QbHgation: Contractors, subcontractors, and suppliers conducting business with the City of Rentori shall affirm and subscribe to the Fair Practices and Nondiscrimination policies set forth by law. 4.4 Coples Of this policy shall be distributed to all City employees, shall appear In all operational documentation of the City, including bid calls, and shall be prominently displayed In appropriate City facilities. DEFINITIONS: Not applicable. PROCEDURE: Not applicable. Printed on 11/27/2013 2 from Folio document Project name, size and location of site Renton Rowing Center Float Replacement -th is project is replacement of existing floats at the Cedar River Boathouse in the City of Renton. The total area (2465 sf) of the new floats will be 5sf less than the existing floats. Brief description of proposed work The project will replace 2 existing floats with wood decks, with new floats that meet current standards for materials, floatation and decking. The existing 2 floats are old, deteriorated and at the end of their lifespan. Float A (1170sf) is tied to the north side of the pier but not in use. Float B (1300 sf) is on the south side of the pier and is in use for boating activities. Phase I will install newly fabricated floats C and D: o Float A (1170 sf) will be removed from the water at a nearby boat ramp, demolished and disposed of properly. o Float C (975 sf) will be installed next to the boat house, to be used as the primary float for boathouse activities. o Float D (190 sf) will be installed as the connecting walkway to the repositioned Float B. This is an interim measure to achieve more launching capacity until Phase II can occur. o Float B (1300 sf) will be retained and attached to the connector float D to provide the launching capacity and water access needed for programs. Phase II will install newly fabricated floats E and F: o Float B (1300 sf) will be removed from the water at a nearby boat ramp, demolished and disposed of properly. o Float E (1180 sf) will be attached to the connecting walkway float D. o Float F (120 sf) will be attached to float C to provide tie up for boats as needed. Basis for the exemption request (reference exemption category from first page) Normal maintenance or repair of existing structures or developments. Anticipated dates of work The new floats will be towed to the location and attached during in-water work windows if required (July 16 -31 or November 16 -December 312016). As there will be no in-water actual work (floats are constructed off-site and delivered to pier) we are requesting more schedule flexibility from the permitting agencies. Other permits required for proposed project Submitting JARPA to Washington Fish and Wildlife for Hydraulic Project Approval. Current and proposed use of the site The site is currently used as floats attached to a waterwalk/pier that serves a City of Renton boathouse. No change is being proposed; floats will be attached to a pier that serves a City of Renton Boathouse. Special site features (I.e. wetlands, water bodies, steep slopes) The floats float on Lake Washington and are attached to the pier. Statement addressing soil type and drainage conditions N/A Total estimated construction cost and estimated fair market value of the proposed project $102,000 Estimated quantities and type of materials Involved if any fill or excavation is proposed N/A Number, type and size of any trees to be removed None Distance from closest area of work to the Ordinary High Water Mark of the shoreline No in-water work, but the shoreline is approximately 30' from the float, and further away as the float extends eastward. Nature of the existing shoreline Rip rap bank that protects the Boeing aircraft taxiway. If the proposed project exceeds a height of 3S-feet above the average grade level, discuss the approximate location of and number of residential units, existing and potential, that will have an obstructed view. N/A SHORELINE TRACKING WORKSHEET City of Renton Planning Division 1055 South Grady Way, Renton, WA 98057 Phone: 425-430-7200 Fax: 425-430-7231 The City of Renton is required by the Washington State Department of Ecology to track and evaluate the effectiveness of the Shoreline Master Program at achieving no net loss of shoreline ecological functions with respect to shoreline projects. The City will use shoreline development tracking information to prepare a Shoreline Master Program report every eight years to comply with the Shoreline Management Act requirements. SHORELINE STABILIZATION 1. Is there currently a bulkhead on your site? D Yes D No; If yes, fill out table below. If no, see "Site Conditions", Section 2 below. What Type of Materials is Your Bulkhead Made of? Linear Feet of Hard Materials: N/4 Linear Feet of Soft Materials: Examples of Types of Bulkheads: Hard (e.g. rocks, woad; Soft (e.g. sand, plants); Combination-soft materials at the water with hard materials furtherer inland, or a combination of hard and soft materials at the water. SITE CONDITIONS 2. List the size (in square feet) and type of all structures (1" floor only) on your property (e.g. 2,000 sq. ft. house, 125 sq. ft. greenhouse). b )(jc5f--il"l'7 C1+-<j Er:/-k.-£vL.f-o-vi fJ(Ja..,fhOW-0 wtb/-f.--v uJc1..1-l(., ()...,LJ_ odjaU--vt:r fo Exls-h~ -P-,oa.rs (;;___ 1-70 s.p) 3. List distance (in fcl!t) from the water to the closest point of each structure. List each building separately (e.g. shed, dock, carport). 0 (J L-L +1,,.._ --{t.c,tJ- j.J (5l_-f'l,,.__, -ft---0 o._:f-- -1 - C:\Users\EastbeC\AppData\Loca !\Microsoft\ Windows\ Temporary Internet Files\Content.Outlook\1RZS6PMU\Shoreline Tracking Worksheet.docx 09/13 • • 4. List the size (in square feet) and type of all impervious surfaces (e.g. driveway, parking area, walkway, patio). EX r o +-,· vt I -f ! oa_f-,5 fo+--zx__J ::: 2.17V Jloa.6 +o·h.J 2-4&S-sp 5. List distance (in feet) from the water to the closest point of each impervious surface (hard surface. 6. Describe the existing vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Grass and ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. 7. Describe the proposed vegetation within 100 ft. of the waterline. Estimate the amount (in square feet) of native vegetation. Gross ond ornamental plantings (e.g. plants requiring care or grown for decorative purposes) should not be counted. N/A 8. Will the project require any added fill? If so, how many cubic yards will be added: /Jo I -2- C:\Users\EastbeC\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\1RZ56PMU\Shoreline Tracking Worksheet.docx 09/13 IN WATER AND OVER WATER STRUCTURES 9. Are there any in or over water structures on your site (e.g. docks, floats, bridges, mooring piles, boatlifts)? t3-Yes D No; If yes, fill out the table below. Describe the in and over water structures on your site Type Surface Area Light Penetrating Materials (e.g. dock,float, bridge, (in square feet, if (the percentage of the mooring pile, boat lift, etc.) applicable) surface area that is made of material that allows light to reach the water) ----~--. ·-···--· Existing structures '/2.Jo ct. I-h o v s.e_.,, rlO f-Some. to remain P; e_ y PM'T o-? 3vr:Lh 0/l/ UV) iua;;/-tvlVcLI /L pvoj~U-wtduvw{L/ L Existing structures A,, otd that will I be w ood I ::c+70 s/ hOM6 removed -PO (l:f-J Proposed structures + u:L fa jf) u;L) ~ i)a__}-~ 2-4-ftJ< s{ ~' p µ,fl/) 0 p.LJ/1 ~ a__(L, Iii 'tf....-hn0i •J I -3 -09/13 C:\Users\EastbeC\AppData\Loca I\M icrosoft\ Windows\ Temporary Internet Files\Content.Outlook\1RZS6PMU\Shoreline Tracking Worksheet.docx I " ' ,tl LAKE WASHING,fON "'! - WORKING POI/ff: CORNER OF EXST E!OATHOJSE N1~ffl46 E1 B.89 1 784.1/ 'ER HARBOR LINE / 84~"E I 92' " ~ • ' " !'> " .., ~ 30' I I 'I 36' 12' WIDE WATERWALK (TYP/ 24' ', I I I I I I !~ " -L----• , ---}.:'I. EXST BOATHOUSE! "E I I I I I D I ffi__j S-2 I DIMENSIONAL PLATFORM I PIVOT POINT FOR FUTURE I I SHELTER ) ~ , : ~ENLARGED EXISTING CAUSEWAY FRAMING "2°' AND P.ATFORM PU>N, SEE ~ ~), S-4 .... __ _ MASTER Pu.N TRAIL EXTENSION _L __ _ \ I ENLARGED S-J ----------" !!!~.'!P, SEE "4' EXST EDGE OF ·=' ~ CONC />PRON ~ EXST WOOD RETAINING WALL IN z~ -.. z IZONT AL DATUM: WASHINGTON COORDINATE :NST"EM~ NORTH ZONE IN1'D 27 t EYING INFORMATION 8' HORTON DENNIS ASSOCIATES, MARCH, KIO(), TO BE FIELD Vf"RIFIED, µ)ORD,INATES OF EXISTING BOATHOOSE SUPPLIED BOEING, TO BE FIELD Vf"RIFIEO. XICT SHORELINE LOCATION AND ELEVATION AT ALKWAY CATCH POINT SHAU SE DETERMINED 8r' HE CONTRICTOR. DIMENSIONS OF THE WALKWAY END ~ SHALL BE ADJJSTED 8' THE OWNEFrS PRESENTATIVE IN ,'CCOflD.ONCE WITH FIELD DATA fTTED El>' THE CONTRICTOR, R>CTOR SHAU .FIELD VERIFY WATERWALK IGNMENT BASED UPON EXISTING 9.JFNEY MOMJMENTS ATED 8' THE ONNEFIS REPRESENT AT /VE, 7. QB) DESIGNATES APPROXIMATE TEST PILE LOCATIONS. SEE SPECIF /CAT IONS a. WATER WALK DESIGN LOADS; A LIVE LOAD: 116 PSF a WIND LOAD: 11188 uac, 80 MPH, EXP C. C. SEISMIC: 1988 UBC ZONE 3, V" 0.14W 9. EXISTING FLOATING DOCKS AT ~THO.JS£ (NOT SHOWN/ SHALL BE REMO/ED AND SALVAGED BY OTHERS. ' ,o. CONCRETE DESIGN STRENGTH, t'c: RT#C.AL.. DATUM: A. CAST-IN-Pf.ACE CONCRETE AND ELEVATJONS SHONN ME BASED ON DECK OF EXl5rlNG PRECAST PILE CAPS: 4000 PSI ATH<XJSE ELEVATION 25.SOFT. CONTRACTOR SHALL ELEVATIONS AS REC1.JIRED TO MATCH 80ATHC1.JSE B. PRECAST HOU.ON PANELS: 5000 PSI LEVATIOV AND MAINTAJN RELATNE ELEVATIONS AS . LAKE WASHINGTON WATERL/NcS ASS.JMED AS ot.LOVS: HIGH WATERLINE -ELEVATION 22.0 FT. 11. REINFORCING STEEL STRENGTH, Fy • 80 ksl LOW WATERLINE -ELEVATION 20.0 FT. (40 ksl FOR Tlf:SJ THE BOEING TRAIL EXISTING EIULKHE1'D WATERWALJ< ,=" sd • <> ~~~!!fF~~~~~J~!~~uc TECHNICAL MEMORANDUM To: Cheryl Eastberg Renton Rowing Center From: Grette Associates, LLC 2102 N 30th St Ste A Tacoma, WA 98403 Re: Renton Rowing Center Float Replacement -Lake Study Date: June 3, 2016 File No.: 519.001 This Technical Memorandum (Memo) has been prepared to satisfy the provisions of Renton Shoreline Master Program [Renton Municipal Code (RMC) Chapter 4-3-090.D.5.b.ii] to assess the potential impacts of the Renton Rowing Center (RRC) float replacement project on existing ecological functions. The Memo provides (I) a summary of the proposed project including project sequencing; (2) existing habitat and utilization by aquatic species; (3) best management practices (BMPs) that will be employed to minimize potential impacts on habitats and species; (4) assessment of potential impacts from the project; and (5) determination of overall project effects and confirmation that the project complies with the No Net Loss provision of RMC Chapter 4-3-090.D.2.a.i. 1 Project Description The RRC proposes to replace two deteriorated wooden floats at the existing Cedar River Boathouse located immediately east of the mouth of Cedar River on the south end of Lake Washington (1060 Nishiwaki Lane, Renton, King County, Washington). The purpose of the project is to improve the safety and usability of the floats and to provide public water access for non-motorized watercraft. The project will also bring the facility up to current design standards through the use of grated float surfaces and fully-contained float tubs. There are two existing floats at the Cedar River Boathouse: one on the north side of the existing dock (Float A), and one of the south side of the existing dock (Float B). Both floats are dilapidated and at the end of their useful lifespans. The floats are constructed of creosote-treated timber framing and Styrofoam floatation billets. Float A is 65ft x 18ft (1,170 fi2) and is currently inaccessible to public use; a guardrail on the north side of the dock prevents ingress/egress to Float A. Float B is 65ft x 20ft (1,300 ft 2) and is accessible via a ramp from the boathouse. Float B is currently used by the RRC to operate rowing programs and rent kayaks, stand-up paddleboards, and canoes for youth and public recreation. The proposed project involves the phased replacement of Floats A and B. Phase I will occur in 2016, and Phase II will occur in 2018. If required by Washington Department of Fish and Wildlife (WDFW) or U.S. Army Corps of Engineers (USACE), float replacement will occur during the approved in-water work window. Phase I will include the removal of Float A, installation of a new float (I, 165 ft 2) where Float B is currently attached adjacent to the boathouse, and relocation of Float B immediately east of the new floats to provide the launching capacity and water access required for programs. Phase II will remove Float B an install a new float (1,180 fr) to the east end of the Phase I float. The old floats will be carefully unattached from the dock and towed to a nearby boat ramp for removal and disposal at an approved upland facility. New floats will be pre-fabricated offsite, towed in with a boat or small work barge, and fastened to existing pile and/or dock structures using hand tools. No pile driving or other construction activities are proposed for this project. The replacement floats will incorporate a grated decking surface with ADA-compliant, 62% open space grating. The float tubs will be fully-encapsulated polyethylene and will occupy approximately 40% of the float footprint. The replacement floats will have a cumulative footprint of 2,345 ft2 compared to the existing float footprint of 2,470 fr. When considering the use of grated decking and light transmission through the floats (minus the area occupied by the float tubs), the resulting shaded area will be 1,473 ft2. As such, the project will reduce the shaded area of the floats by 997 fr. 2 Existing Habitats and Species The vicinity of the proposed project is characterized by highly modified uplands including The Boeing Company and Renton Municipal Airport. Upland habitat features are limited to sparse shrubs and vegetation along the bank of the lake and Cedar River. All other upland areas surrounding the project area are entirely developed with buildings and impervious surfaces. The aquatic portion of the site is located on Lake Washington (Reach: L W-1) immediately east of and adjacent to the mouth of the Cedar River (Reach: CR-A). Aquatic habitat in the vicinity of the project area is characterized by shallow water with silty-sand substrates that are a result of the discharge plume of the Cedar River (Figure 1). Renton Rowing Center Float Replacement Lake Study 2 June 3, 2016 Grette Associates, LLC Figure 1. Aerial view of the Cedar River Boathouse and Cedar River mouth. The existing floats are visible on the north and south side of the dock. Photoora h courtes of Ecolo Coastal Atlas. The Washington Department of Fish and Wildlife (WDFW) Salmonscape GIS Mapper and Priority Habitats and Species (PHS) Mapper were queried to determine the presence of sensitive species and habitats that may be present in the vicinity of the project area (WDFW 20 l 6a,b ). The only sensitive species mapped near the project area are salmonids, which may use the project area in transit to/from the Cedar River. The vicinity of the project area is likely to be utilized by adult salmonids returning to their natal streams to spawn, as well as out-migrating juvenile salmonids for rearing and foraging. A summary of salmonids that utilize the Cedar River in the vicinity of the proposed project is provided in Table 1. No other sensitive habitats or species are mapped in the vicinity of the project area. Several species of freshwater fish, waterfowl, small mammals, and amphibians that are common to Lake Washington may be present within the vicinity of the project area. Table 1. Salmonid species that may be presen t within the vicinity of the project area . Common Name Puget Sound Chinook Coho Sockeye/Kokanee Puget Sound steelhead Resident Coastal Cutthroat Coastal-Puget Sound bull trout/Dollv Varden Renton Rowing Center Float Replacement lake Study Scientific Name Oncorh ynchus tshawytscha 0. kis utch 0. nerka 0. mykiss 0 clarki Sa/velinus confluentus 3 Listing Status Federally threatened N I A NI A Federally threatened NI A Federally threatened (bull trout only) June 3, 2016 Grette Associates, LLC 3 Best Management Practices (BMPs) The following BMPs will be utilized during both phases of the float replacement to minimize potential impacts to habitats and species: • Vessels used to transport floats will not ground out; • No pile work, shoreline disturbance, or other in-water or overwater construction will occur; • Existing floats will be detached from and replacement floats will be attached to the dock using hand tools; • All debris and/or waste materials will be captured and not allowed to enter Lake Washington; • Grated decking (62% open space) will be installed to allow ambient light to penetrate the floats; • Float tubs will be comprised of fully-encapsulated polyethylene; and • If required by WDFW and/or USA CE, removal and installation of the floats will occur during the approved in-water work window for the protection of juvenile salmonids (expected to be July 16 to July 31 and November 16 to December 31). 4 Potential Project Impacts The proposed float replacement project is extremely unlikely to result in adverse impacts to ecological functions or processes in the short or long-term. The project will support an existing use and will not change the intensity of use; therefore, no cumulative impacts are associated with the float replacement. No construction activities are proposed. The existing floats will be disconnected from the dock and towed whole to a boat ramp for removal and disposal at an approved upland facility. Similarly, replacement floats will be pre-fabricated off site, towed to the site, and fastened to the dock using hand tools. As such, the project is not anticipated to result in short or long term impacts to fish and wildlife habitat, food chain support, turbidity or other water quality impacts. Any potential minor, short term impacts will be further reduced through strict adherence to project BMPs. In the long term, the project may benefit aquatic species and habitats through the reduction in float footprint from 2,470 ft2 (existing) to 2,345 ft2 (proposed). Furthermore, the use of grated float surfaces will reduce the overall shaded area of the floats by 997 ft2. This may benefit nearshore primary production and/or out-migrating juvenile salmonids that rely on shallow, nearshore areas for foraging and rearing. The project will have no effect on water temperature maintenance, water flow, erosion and accretion, infiltration, groundwater recharge and discharge, sediment delivery/transport/storage, large woody debris recruitment, organic matter input, nutrient and pathogen removal, or stream channel formation/maintenance (RMC Chapter 4-3-090.D.2.a.i). Renton Rowing Center Float Replacement Lake Study 4 June 3, 2016 Grette Associates, LLC 5 Conclusion In summary, the proposed float replacement project is extremely unlikely to result in short term impacts to ecological functions and may benefit them in the long term by reducing both the footprint and shaded area of the floats. Overall, this project satisfies the Not Net Loss provision of the Renton Shoreline Master Program (RMC Chapter 4-3-090.D.2.a.i). 6 References Washington Department of Fish and Wildlife (WDFW). 2016a. SalmonScape Interactive GIS Mapper. Available at http://wdfo ·""·~\'}.'mapping/salmonscape. Accessed on May 16, 2016. WDFW. 2016b. Priority Habitats and Species GIS Mapper. Available at http://apps.wdfw.wa.gov/phsonthnh']l:. Accessed on May 16, 2016. Renton Rowing Center Float Replacement Lake Study 5 June 3, 20/6 Grelle Associates, LLC I i@ ~ I ]? I I I ..L,_:_ w -Q ' ,. . / , ,,,. // / ~( I ~ --4 '~ \ I j :~ 1~ ----I )<. ' tJ ;n ' -() -I \ " ...... ~ -;;; I," I I "' ..... ~-I ( I ~),,.~ ~ C cf{ I I u\ 0 "tJ ""1~ I "' I '-1"1'1 m l/1 "1' "' 0 I ~R I )( " 1' " --I I "" ·, -Ji> = ),,. I i -. ', ' . --r--. '. I )I: I -le, d) ':\ _I I t ~ "'() " I I I ' :!-~-ft 'f-' I ~~ :: i I 1'. I J (\- f~ ,I -u -I "0 ~ ;s 10' I ~; ~ I 5·d ~~ -I I ('\ ::s -----I ~ &f'> ----I\J I ~ • I \ g --tj-__ .,., 24' --1: 12'. t • \I) 4! - 92' --, 30' , I, 36' • , • . !@2' _ --24 1Z WIDE WATERN ALI'. rrr.e!_ ,1,0 SI-~ t : : L--~~;18'~ \ I 1 I !I II 1 • ~ EXISTING . . " ' : : '1 { ). f-~--••.~t"""fP9f"'f--""1r I t+ ff iWC t--- .~ .... L. ..,. -·--...i..;... __ BOAT HCXJSE t _: ~· ] 65' x 20' & I l : "' ,~o~f- Existing· t t-lOR..TH (,f,..,) If,] North f\cn...f-= 1170 sf, South t:it.<tt = 1300 sf · Total sf= 2470 sf £,ct &fa i "4'i C'-' di +i oJ, ~ 4 - I ' --..... -lN ! ' I I 1~ I~ ' l ! ~!;t NS• -. .., C'D 3 • 0 /~ ' < z C'D :::J > C'D ~ C'D ...... --~ ~ II ...... (:) - ...... - • :::J u, C'D l/) ~~~ ~ -oOO 0 ,:, ), . ~. --~~ C, ,; 0 ---Q. 03 I I I -l - ------d ! I\) ----' Ld - •