HomeMy WebLinkAboutChange Order - 18DocuSign Envelope ID: FFB97FA5-FED4-41 EA-B782-33CF52BBCFF8 Contract Title: Change Order No. 18 Rainier Ave S Corridor Improvements -Phase 4 Contractor: Pivetta Brothers Construction, Inc. Contract No. CAG-22-163 Federal Aid No. : STPUL-1615(005) 181 Ordered by Engineer □Proposed by the Contractor {VECP) D Unilateral D Lump Sum 181 Bid Item D Force Account Amount Working Days Original Contract: Current Contract: Estimated Net Change This Order: New Contract: Reviewed By: �� E gineef1>f Record ....,_ Reviewed By: Date 03/01/2024 Date ·�� 3/5/2024 City of Rento�nager Date Reviewed By: City Attorney Date 18 $28,284,172.90 500 $29,306,231.97 538 $52,077.30 0 $29,358,309.27 538 Design Manager) Consent By: Surety (Greater than 25% cost and/or 20% time increase) Endorsed By: B .11 Ad Digitally signed by Bill Adams 1 ams �;,i;�:;��cia?g6?8 Contractor Executed By: City of Renton Public Works Administrator/ Mayor Change Order No. Contract Title: Rainier Ave S Corridor Improvements -Phase 4 Contract No. CAG-22-163 Date 3/8/2024 Date Date Page 1 of 12 CAG-22-163, CO #18-24 4/1/20243/7/2024Approved by Cheryl Beyer via email ________________________________ Jason A. Seth City Clerk Attest: Connections to Existing Sanitary Sewer -Estimated Change Order Cost Change Order Cost (Equitable Adjustment) Project Name: Contractor: Contract No: Federal Aid No: Construction Manager: Item No. Rainier Ave S Corridor Improvements• Phase 4 Piverta Brothers Construction, Inc. CAG-22-163 STPUL-1615(005) Perteet Descrl ption Quantity Independent Cost Estimate 18·C16 Labor. (foreman) • Plvetta 18-Cl6 Labor• (Operator) • Pivetta 18-Cl6 Labor• (Operator) • Plvetta 18-Cl6 Labor• (laborer) • P1vetta 18·Cl6 Labor· (laborer) • P1vetta 18·C16 Labor Markup 18-Cl6 Equipment• (Flatbed Trucks) • Pivetta 18-Cl6 Equipment • (Eicavator) -Plvetta 18·Cl6 Equipment• (loader) • P1vetta 18-C16 Equipment• (light Duty Truck)• Plvetta l8-Cl6 Equipment Markup 18·Cl6 Materials (SDR 35 8" sewer pipe) 18-Cl6 Materials (Fernco fittings) 18·C16 Materials Markup 18-C16 Servicei 18-C16 Services Markup 18·C16 Subcontractor Markup 18-C16 Connection to Existing Sanitary Sewer Per attached determination Estimated Change Order Cost (Schedule C) Estimated Sales Tax Cost (Schedule C) Estimated Change Order Cost (Schedule C} Summary of Contractors Quotes: Item 18·C16 Quote location N/A Quoted Cost Total Quoted Added Cost: 45,408.00 45,408.00 50 $21,500.00 50 50 $12,050.00 125 25 SS,375.00 $0.00 $0.00 Item Change 25 Overhead Change Order No. 18 Unit Hours Hours Hours Hours Hours Cents/Dollar Hours Hours Hours Hours Cents/Dollar Cents/Dollar Cents/Dollar Cents/Dollar Cents/Dollar Cents/Dollar By: Jordan Howe Date: 2/15/2024 Unit Price 96.00 92.00 92.00 75.00 75.00 0.31 35.00 113.00 75.00 18.00 0.21 13.00 150.00 0.21 $ 0.21 0.12 CALCULATED TOTAL: ESTIMATED TOTAL (25 EA): EA $ 1,892.00 TOTAL By Agreement Estimated Cost $4,800.00 $4,600.00 $4,600.00 $3,750.00 S3,750.00 $6,665.00 $1,750.00 $5,650.00 S3,750.00 S900.00 S2,530.50 $1,625.00 $3,750.00 Sl,128.75 S49,249.25 $47,300.00 S47,300.00 $47,300.00 $0.00 $47,300.00 $4,777.30 $52,077.30 Change Order #18 -Page 4 of 12 Pivetta Brothers Construction, Project: 2022-148 Rainier Ave S Phase 4 RFI #232: Connection to Existing Storm/Sewer Drainage Bid Items Activity Project Stage Schedule Cost Code Reference Attachments Connections to Existing Sanitary Sewer -RFI Response RFI #232 -Connection to Existing Storm/Sewer Drainage Bid Items Project: 2022-148 Rainier Ave S Phase 4 All Replies on Thursday. Feb 15, 2024 10:44 AM PST Change Order #18 -Page 6 of 12 Connections to Existing Sanitary Sewer -Contractors Quote Serial Letter: 037 February 5, 2024 To: Michelle Faltaous City of Renton 1055 South Grady Way Renton, Washington 98057 Reference Project: CAG-22-163, Rainier Ave S Corridor Improvements -Phase 4 Project Subject: PCO-035 RFl-232 Connection to Exi ting Sewer Bid Items Mrs. Michelle Faltaous: As discussed with the City's Project team, Pivetta Brothers Construction, Inc (Pivetta) has identified a conflict within Special Provision 7-05.3(3). This provision states that, "A connection to existing item will be allowed at any connection of a new line to an existing structure, or the connection of a new structure to an existing line. No connection to existing will be accepted at the location of new installation, relocation and adjustment of line manholes, catch basins, or curb inlets." The second sentence of this provision does not make sense as the connection of a new structure to an existing line will always occur installing a new structure. The second sentence also contradicts the language in SP 7-05.5 which describes payment for connecting new pipe to an existing structure or connecting a new structure to existing pipe. To align with the contract provisions, Pivetta is requesting the City add a pay item to "Connect to Existing Sewer Structures/Pipe" and modify the existing pay item A67 to say "Connect to Existing Drainage Structures/Pipe." Pivetta proposes using the current price for pay A67 "Connect to Existing Drainage Structures" for the new pay item as follows: Connect to Existing Sewer Structures/Pipe 24EA $1,892.00 EA $45,408.00 For clarification, this unit price is only expected to include 2 to 3 feet of SDR35 sewer pipe. Due to the condition of the existing clay pipe, we may be required to extend the length of the pipe for the connection and these costs should be paid for under force account Please feel free to contact me at (206) 914-2723, if you have any questions or concerns. Bill Adams Sr. Project Manager Change Order #18 -Page 7 of 12 DocuSign Envelope ID: FFB97FA5-FED4-41 EA-B782-33CF52BBCFF8 Connections to Existing Sanitary Sewer -Contractors Quote w / Attachments: RFI-232 Cc: Jordan Howe, Perteet Russell Owen, Pivetta I Change Order #18 -Page 8 of 12 I