HomeMy WebLinkAboutChange Order - 10Change Order No.10 Contract Title:NE Sunset Blvd-Safe Routes to Transit Contract No.CAG-22-311 Page 1 of 2 Change Order No. 10 Contract Title:NE Sunset Boulevard Safe Routes to Transit Contractor:Kamins Construction, Inc. Contract No. : CAG-22-311 Federal Aid No. : N/A ܈܈ Ordered by Engineer ܈ Force Account ܆ Proposed by the Contractor (VECP) ܈ Bid Item ܆ Unilateral ܆ Lump Sum Amount Working Days Original Contract:$318,149.14 45 Current Contract:$430,641.14 47 Estimated Net Change This Order:-$28,986.16 New Contract:$401,654.98 47 Prepared By: Issued By: Resident Engineer City of Renton Civil Engineer III Date Engineer (City of Renton Transportation Design Operations Manager) Date Reviewed By: Consent By: Engineer of Record Date Surety (Greater than 25% cost and/or 20% time increase) Date Reviewed By: Endorsed By: City of Renton Project Manager Transportation Operations Manager Date Contractor Date Reviewed By: Executed By: City Attorney Date City of Renton Public Works Administrator / Mayor Date Endorsed By: 3/11/24 03/11/202403/11/2024E.Belen                CAG-22-311, CO #10-24 Approved by Cheryl Beyer via email 3/13/2024 Change Order No. 10 Contract Title: NE Sunset Blvd-Safe Routes to Transit Contract No. CAG-22-311 Page 2 of 2 THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: The Change Order reconciles the estimated bid item quantities to the adjusted final bid item quantities of the Work Completed. Reason for Change: At the time of bid, the bid item quantities are based on estimates of the Work to be performed. Once the Work is completed, the adjusted final quantities are known for each bid item included in the Contract (including executed Change Orders). To reconcile the total Contract Amount with the total payment for Work completed, this Change Order is necessary to reconcile the quantity of each bid item included in the Contract at the time of bid with the adjusted final quantity of each bid item included in the Contract at the time of completion of the Work Affects DBE Work: ܆܆ Yes ܈ No Materials: No changes. Plans: None Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2023 WSDOT/APWA Standard Specifications. Extension of Time: The Time for Completion is extended __0_ Working Days. Sections 1-04.4 and 1-04.5 of the 2023 WSDOT/APWA Standard Specifications shall govern this Change Order. The Work of the referenced Contract is modified to include the changes detailed herein. The payment provided for herein shall constitute the complete and final settlement for all costs of labor, equipment, materials, overhead, profit, permit fees, and all other claims that may be made by the Contractor as a result of this change.              Bid Item Unit Unit Price Quantity Cost Quantity Cost Quantity Cost 1 L.S.$7,700.00 1 $7,700.00 1.0 $7,700.00 0.00 $0.00 2 L.S.$500.00 1 $500.00 1.0 $500.00 0.00 $0.00 3 FA $5,000.00 1 $5,000.00 0.0 $0.00 -1.00 -$5,000.00 4 CALC $10,000.00 1 $10,000.00 0.0 $0.00 -1.00 -$10,000.00 5 CALC $10,000.00 1 $10,000.00 0.0 $0.00 -1.00 -$10,000.00 6 LS $31,585.00 1 $31,585.00 1.0 $31,585.00 0.00 $0.00 7 LS $1,804.00 1 $1,804.00 1.0 $1,804.00 0.00 $0.00 8 LS $27,060.00 1 $27,060.00 1.0 $27,060.00 0.00 $0.00 9 TN $1.00 19 $19.00 19.0 $19.00 0.00 $0.00 10 LS $12,210.00 1 $12,210.00 1.0 $12,210.00 0.00 $0.00 11 LF $8.80 200 $1,760.00 213.0 $1,874.40 13.00 $114.40 12 EACH $4,180.00 2 $8,360.00 3.0 $12,540.00 1.00 $4,180.00 13 EACH $3,080.00 2 $6,160.00 2.0 $6,160.00 0.00 $0.00 14 EACH $3,080.00 1 $3,080.00 0.0 $0.00 -1.00 -$3,080.00 15 LF $42.35 158 $6,691.30 156.0 $6,606.60 -2.00 -$84.70 16 LF $72.80 0 $0.00 0.0 $0.00 0.00 $0.00 9 17 SY $136.82 81 $11,082.42 60.0 $8,209.20 -21.00 -$2,873.22 18 CY $605.00 4 $2,420.00 4.0 $2,420.00 0.00 $0.00 19 TON $648.39 9 $5,835.51 22.2 $14,420.19 13.24 $8,584.68 20 CY $104.69 29 $3,036.01 18.0 $1,884.42 -11.00 -$1,151.59 21 SF $71.50 80 $5,720.00 116.0 $8,294.00 36.00 $2,574.00 2 22 LF $3.30 1,241 $4,095.30 1,078.0 $3,557.40 -163.00 -$537.90 23 LF $3.30 157 $518.10 453.0 $1,494.90 296.00 $976.80 24 LF $49.50 0 $0.00 0.0 $0.00 0.00 $0.00 9 25 LF $16.50 175 $2,887.50 176.0 $2,904.00 1.00 $16.50 26 SF $13.20 400 $5,280.00 592.5 $7,821.00 192.50 $2,541.00 27 EACH $385.00 5 $1,925.00 8.0 $3,080.00 3.00 $1,155.00 28 EACH $385.00 2 $770.00 3.0 $1,155.00 1.00 $385.00 29 LS $3,500.00 1 $3,500.00 1.0 $3,500.00 0.00 $0.00 30 EACH $93.50 32 $2,992.00 32.0 $2,992.00 0.00 $0.00 31 LS $66,000.00 1 $66,000.00 1.0 $66,000.00 0.00 $0.00 32 LS $44,000.00 1 $44,000.00 1.0 $44,000.00 0.00 $0.00 $291,991.14 $279,791.11 -$12,200.03 $0.00 $0.00 $0.00 $291,991.14 $279,791.11 -$12,200.03 Change Change Order 10Payments Final Totals Change Schedule Sub-Totals Washington State Sales Tax 0 RRFB SYSTEM, COMPLETE (INSTALL ONLY) TRAFFIC SIGNAL SYSTEM, COMPLETE (INSTALL ONLY) PLASTIC STOP LINE PLASTIC CROSSWALK LINE PLASTIC TRAFFIC ARROW PLASTIC BICYCLE DETECTION MARKING PERMANENT SIGNING TUFF-CURB WITH FLEXIBLE PAINT LINE PAINTED WIDE LANE LINE PROFILED PLASTIC WIDE LANE LINE CEMENT CONC. CURB RAMP TYPE PERPENDICULAR CEMENT CONC. CURB RAMP TYPE SINGLE DIRECTION EXTRUDED CURB (DOWELED) MOUNTABLE CEMENT CONC. TRAFFIC CURB CEMENT CONC. SIDEWALK COMMERCIAL CONCRETE Change Final Totals Description Change Order 10 City of Renton Project Name:NE Sunset Blvd Change Order No. Date: March 7, 2024 Payments Contractor: Kamins Construction Change Order No. 10 Quantity Reconciliation Schedule A TEMPORARY EROSION AND TEMPORARY TRAFFIC CONTROL (INCLUDING FLAGGERS) REMOVAL OF STRUCTURES AND OBSTRUCTIONS CLEARING AND GRUBBING SAWCUTTING CEMENT CONC. CURB RAMP TYPE PARALLEL CONSTRUCTION SURVEY SPCC PLAN RESOLUTION OF UTILITY CONFLICTS FUEL COST ADJUSTMENT STEEL COST ADJUSTMENT MOBILIZATION HMA CL. 1/2 IN. PG 64H-22 CRUSHED SURFACING BASE COURSE DETECTABLE WARNING SURFACE              Bid Item Unit Unit Price Quantity Cost Quantity Cost Quantity Cost Change Final Totals Description Change Order 10 City of Renton Project Name:NE Sunset Blvd Change Order No. Date: March 7, 2024 Payments Contractor: Kamins Construction Change Order No. 10 Quantity Reconciliation Schedule A Quantity Cost Quantity Cost 1-33 DIRECTIONAL BORING F.A.$16,000.00 1.00 $16,000.00 1.32 $21,103.39 0.32 $5,103.39 $16,000.00 $21,103.39 $5,103.39 N/A No Cost Change Order $0.00 1.00 $0.00 1.00 $0.00 0.00 $0.00 $0.00 $0.00 $0.00 1-34 PAVEMENT MARKING REMOVAL LS $10,000.00 1.00 $10,000.00 1.00 $10,000.00 0.00 $0.00 $10,000.00 $10,000.00 $0.00 1-35 ELECTRICAL SYSTEM COMPLETE F.A.$41,000.00 1.00 $41,000.00 0.64 $26,425.15 -0.36 -$14,574.85 $41,000.00 $26,425.15 -$14,574.85 1-36 REMOVE CEM CONC SIDEWALK F.A.$1,300.00 1.00 $1,300.00 5.72 $7,432.42 4.72 $6,132.42 1-37 CEMENT CONC SIDEWALK F.A.$1,700.00 1.00 $1,700.00 0.81 $1,384.15 -0.19 -$315.85 1-38 ADJUST MANHOLE F.A.$1,000.00 1.00 $1,000.00 0.90 $901.48 -0.10 -$98.52 $4,000.00 $9,718.05 $5,718.05 1-39 REMOVE CURB AND GUTTER F.A.$5,500.00 1.00 $5,500.00 1.01 $5,556.81 0.01 $56.81 1-40 REMOVE ASPHALT PAVEMENT F.A.$8,000.00 1.00 $8,000.00 0.96 $7,668.37 -0.04 -$331.63 1-41 CEMENT CONC. TRAFFIC C & G F.A.$21,500.00 1.00 $21,500.00 0.42 $9,016.41 -0.58 -$12,483.59 $35,000.00 $22,241.59 -$12,758.41 1-42 F.A. $1,000.00 1 $1,000.00 1.00 $1,000.00 0.00 $0.00 $1,000.00 $1,000.00 $0.00 1-43 F.A.$1,000.00 1.00 $1,000.00 0.00 $0.00 -1.00 -$1,000.00 $1,000.00 $0.00 -$1,000.00 1-44 F.A. $12,200.00 1.00 $12,200.00 0.49 $5,924.19 -0.51 -$6,275.81 1-45 F.A. $2,850.00 1.00 $2,850.00 3.46 $9,851.50 2.46 $7,001.50 1-46 F.A. $11,100.00 1.00 $11,100.00 1.00 $11,100.00 0.00 $0.00 1-47 F.A. $4,500.00 1.00 $4,500.00 1.00 $4,500.00 0.00 $0.00 $30,650.00 $31,375.69 $725.69 $430,641.14 $401,654.98 -$28,986.16 Total Schedule Plus C.O. Totals Total Schedule plus C.O. Change Order No. C.O. 1 Directional Boring @ Edmonds Ave NE C.O. 9 Totals PLASTIC LINE TUFF-CURB XLP C.O. 6 Curb Removal C.O. 6 Totals C.O. 7 Roadside Cleanup ROADSIDE CLEANUP C.O. 3 Removal of Pavement Markings C.O. 3 Totals C.O. 4 Electrical Cabinet Installation C.O. 2 Removal of Detectable Warning Install C.O. 3 Removal of Pavement Markings C.O. 4 Electrical Cabinet Installation C.O. 5 Sidewalk Panel Install & Removal C.O. 6 Curb Removal C.O. 7 Roadside Cleanup C.O. 8 Traffic Curb Removal C.O. 9 Modification of TUFF-Curb Install C.O. 7 Totals C.O. 8 Traffic Curb Removal DUAL-FACED CEMENT CONC. C.O. 8 Totals C.O. 9 Modification of TUFF-Curb Install PROFILED PLASTIC LINE ADDITIONAL TRAFFIC CONTROL Schedule A Change Orders C.O. 4 Totals C.O. 5 Sidewalk Panel Install & Removal C.O. 5 Totals C.O. 1 Directional Boring @ Edmonds Ave NE C.O. 1 Totals C.O. 2 Removal of Detectable Warning Install C.O. 2 Totals Change Order 10 Change -$28,986.16 Summary of Quantity Reconciliation Payments Final Total $401,654.98