Loading...
HomeMy WebLinkAboutMFP24001109.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24001109 IVR Number: 24001109 Permit Information Permit Name: Verizon - MCI / PT-5859527 / 1024140 Renton Pole TransferAddress/Location:03/06/2024Application Date:2423049106Parcel Number: 1215 MONSTER RD SW Permit Type:04/05/2024Issue Date:Franchise Permit Work Class:04/07/2025Expiration Date:Minor Utility Job Number: PT-5859527 / 1024140Franchise Type:Telephone Description: Verizon Business MCI Metro. Project consists of a single pole transfer and existing riser relocation to replacement pole. Contacts Name Address PhoneTypeBilling Joe Parker Waeco Construction 17350 Tye St Se Monroe, WA 98272 B: (360) 464-9464 C: (253) 315-3326 ApplicantX Alan Bar Verizon Business Manager Verizon Wireless 3245 158th Ave SE Bellevue, WA 98008 B: (253) 218-9017Contact Kenneth Terhune Verizon 11311 NE 120th St Kirkland, WA 98034 B: (425) 301-8658Contact Alan Bar Verizon Contact Wade Edelbrock Waeco Construction LLC 18543 Cascade View Dr SE Monroe, WA 98272 B: (360) 794-7785 C: (206) 423-7074 Contractor Business License Number: 37230Construction Contractor: WAECOCL930LF SCOTT CHRISTENSON VERIZON BUSINESS 11311 NE 120 St Kirkland, WA 98034 B: (425) 626-6046 C: (425) 471-1079 Emergency Contact MANUFACTURERS MINERAL CO 1215 MONSTER RD SW RENTON , WA 98055 Owner Jeremy Noble Verizon 15505 Sand Canyon Ave, Bldg C Irvine, CA 92618 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering x x x x x x RENTON POLE TRANSFER 1215 MONSTER ROAD SW, RENTON, WA 98055 WAECO CONSTRUCTION JOSEPH PARKER 253-315-3326 17350 TYE ST SE MONROE, WA 98272 PROJECT CONSIST OF STAGING AREA FOR CONSTRUCTION OF SINGLE POLE TRANSFER AND EXISITING RISER RELOCATION TO REPLACEMENT POLE. 9am 3pm MFP24001109 4/15/24 4/19/24Monday - Friday Scott Warlick CED 4/5/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Joseph Parker 3/27/24 RURAL ROADS & URBAN ARTERIALSRURAL ROADSRESIDENTIAL & BUSINESS DISTRICTSURBAN STREETSRURAL ROADS & URBAN ARTERIALS350'±500'±100'±200'±(1) ALL SPACING MAY BE ADJUSTED TO ACCOMMODATEINTERCHANGE RAMPS, AT-GRADE INTERSECTIONS ANDDRIVEWAYS(2) THIS SPACING MAY BE REDUCED IN URBAN AREAS TOFIT ROADWAY CONDITIONSSIGN SPACING = X (FEET)35/40 MPH45/55 MPH25 MPH OR LESS25/30 MPHCHANNELIZATION DEVICE SPACING (FEET)35/4525/3050MPHTAPER403020406080TANGENT253035404550556065645570495425360305250200155LENGTH (FEET)SPEED (MPH)LONGITUDINAL BUFFER SPACE = BBUFFER DATA150251051151253530165180205225245402702953204545049554050500550600101112LANEWIDTH(FEET)MINIMUM TAPER LENGTH = L (FEET)POSTED SPEED (MPH)NOTES:1.ALL SIGNS ARE 36" - 36" ACROSS.2.AN ASTERISK (*) DENOTES X, L, OR B DISTANCES AND ARE NOT SHOWN TO SCALE.3.CONTRACTOR SHALL ALWAYS PROVIDE ACCESS TO DRIVEWAYS.4.STANDARD ADVANCE WARNING SIGNS SHALL BE USED FOR PLATES OR ROUGH ROAD DURING AFTER-HOURS, INCLUDING "MOTORCYCLIST" SIGN.5.FLAGGERS SHALL BE USED IN ACCORDANCE WITH WAC 468-95-302. UPO WILL BE REQUIRED IF A TRAFFIC SIGNAL COULD BE COUNTERMANDED.6.IF ONLY ONE LANE IS OPEN IN A DIRECTION, THAT LANE SHALL BE A MINIMUM OF 11' WIDE, UNLESS SPOTTER/FLAGGERS ARE USED, IN WHICH CASE THE LANE CAN BE A MINIMUM OF 10'.7.SIDEWALKS ARE EITHER OPEN OR NOT OPEN. A SIDEWALK IS CLOSED IF A MINIMUM 4' PATH CANNOT BE MAINTAINED MEASURED FROM PROPERTY LINE, OR 5.5' IF CREATED FROM FACE OF CURB.8.NO PARK SIGNS ARE TO BE PUT UP 72 HOURS PRIOR TO CONSTRUCTION.LEGENDTRAFFIC CONTROLPLANTRAFFIC CONESTEMP SIGN LOCATIONWORK VEHICLEWORK AREAFLAGGING STATIONTRAFFIC CONTROL PLANHOURS OF TCP: 9AM-3PMDESCRIPTION: ACCESSING EXISTING POLESCALE: 1"=30'30'020'10'1ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024140_RENTON_PT-5859527_20240131\CAD DATA\1024140_PT-5859527_TCP.DWG 2/26/2024 2:14 PMSHEET #PROJECT NUMBER: PT-5859527PROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: VERIZONPERMIT NUMBER: ----OF1WAECO INTERNAL PROJECT NUMBER: XX 24 HOUR CONTACT1215 MONSTER RD SW,RENTON, WA 98057WAECO SUPERVISORSCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425.471.1079SCOTT.CHRISTENSON@VERIZON.COMORIGINALREV #0REVIEWEDAS-BUILTDATE02/16/24TECHENGHKBJJP--------HKBJJP------------02/23/24----PLAN VIEWSCALE: 1" = 30'X*X*X*X*X*X*ROADWORKAHEADW20-1W20-4ONE LANEROADAHEADW20-7aROADWORKAHEADW20-1W20-4ONE LANEROADAHEADW20-7a13'13' 13'12'MONSTER RD SW (25 MPH)50'+/-50'-100'PARCEL# 24230490101200 MONSTER RD SWPARCEL# 24230491061215 MONSTER RD SWMFP24001109 © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS ADDRESS: 1215 MONSTER ROAD SW, RENTON, WA, 98055PROJECT NAME: RENTON POLE TRANSFERVERIZONSCOTT CHRISTENSONSUPERVISORSCOTT.CHRISTENSON@VERIZON.COM425-471-1079WAECO ENGINEERINGJOSEPH PARKERENGINEERING MANAGERJPARKER@WAECOENG.COM(253) 315-33261COVER SHEET2LEGEND3GENERAL NOTES4AERIAL PLAN VIEW5SITE PHOTOGRAPHS6AERIAL TYPICALSPROJECT CONSISTS OF A SINGLE POLETRANSFER AND EXISTING RISERRELOCATION TO REPLACEMENT POLECOVER SHEETCONTACTSSHEET INDEXSCOPE OF WORKSITE LOCATIONNOT TO SCALE1ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024140_RENTON_PT-5859527_20240131\CAD DATA\1024140_PT-5859527_PLANS.DWG 2/23/2024 12:44 PMSHEET #PROJECT NUMBER: PT-5859527VERIZON ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: VERIZONPERMIT NUMBER: XX1215 MONSTER ROAD SW,RENTON, WA, 98055ORIGINALREV #0REVIEWEDAS-BUILTDATE2/22/24TECHENGTLFJJP------------------------WAECO ENGINEER----2/23/24----SCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425-471-1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: XX SHEET 4VICINITY MAPNOT TO SCALEMFP24001109 LEGENDMST4 PORTUTILITY RISERUTILITY POLEPOLE ANCHOR/DOWN GUYMANHOLEHANDHOLEPEDESTALPULLBOXFIBER DISTRIBUTION PANELGROUND BONDUTILITY BREAK/CONTINUATIONUTILITY ENDMISCELLANEOUS UTILITYUTILITY STRUCTURECATCH BASINFIRE HYDRANTSTREET LIGHT POSTSTREET LIGHTTRAFFIC ARM/STOP LIGHTTREEHEDGERUTILITY RISERUTILITY POLEPOLE ANCHOR/DOWN GUYMANHOLEHANDHOLEPEDESTALPULLBOXFIBER DISTRIBUTION PANELDOWN GUY ON EXISTING ANCHORMULTIPORT SERVICE TERMINALUTILITY POTHOLEBORE PITRDRAWING SYMBOL LEGENDPROPOSED SYMBOLSEXISTING SYMBOLS2ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024140_RENTON_PT-5859527_20240131\CAD DATA\1024140_PT-5859527_PLANS.DWG 2/23/2024 12:44 PMSHEET #PROJECT NUMBER: PT-5859527VERIZON ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: VERIZONPERMIT NUMBER: XX1215 MONSTER ROAD SW,RENTON, WA, 98055ORIGINALREV #0REVIEWEDAS-BUILTDATE2/22/24TECHENGTLFJJP------------------------WAECO ENGINEER----2/23/24----SCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425-471-1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: XX #STA. 1+00AERIAL FIBER W/ STRANDAERIAL FIBER (ADSS)AERIAL FIBER W/ OVERLASHFIBER THROUGH EXISTING CONDUITCONDUITSTRANDPROPOSED LINETYPESEXISTING LINETYPESAERIAL FIBERCONDUITSTRANDRIGHT OF WAYPARCEL BOUNDARYCURBEDGE OF PAVEMENT - ROADFENCE WOOD/METALGAS PIPEWATER PIPETELEPHONE LINEELECTRICAL LINESANITARY SEWER (SS)STORM DRAIN PIPECABLE TV LINESTEAM PIPEOIL PIPEUNKNOWN UTILITYFIBER OPTIC LINETELECOMMUNICATIONSSTATIONING LINELINETYPE LEGENDIDENTIFICATION LABELSXXXCONSTRUCTION/RESTORATION CALLOUTUTILITY POLE SEQUENCE CALLOUTPHOTO MARKERFIBER STORAGE LOOPFIBER STORAGE LOOPWITH SPLICE POINTEXISTING SPLICE POINTWITH NEW TAILPOWER RECLOSERFIBER LENGTH ON SHEETFIBER LENGTH STRUCTURE TO STRUCTUREXSEQ#X'SEQ#X'SEQ#X'EHSEXTRA HIGH STRENGTHHDPEHIGH DENSITY POLYETHYLENE(H)HORIZONTALHHHANDHOLEJBJUNCTION BOXMHMANHOLEMPMILE POSTMSTMULTIPORT SERVICE TERMINALPVCPOLY VINYL CHLORIDERGSRIGID GALVANIZED STEEL CONDUITROW RIGHT OF WAYSTA.STATIONSTRSTRUCTURE(V)VERTICALPD-##PEDESTAL NUMBERVT-##VAULT NUMBERUP-##UTILITY POLE NUMBER###FFIBER CABLE THREAD COUNTABBREVIATIONSEXISTING SIDEWALKCONCRETE RESTORATIONASPHALT RESTORATIONASPHALT OVER PCC RESTORATIONLANDSCAPE RESTORATIONHATCH PATTERN LEGEND(XXX')(XXX' STR-STR)RECLOSER #:XXXXMFP24001109 GENERAL NOTESGENERAL NOTES:THE LOCATIONS OF UTILITIES SHOWN ON THESE DRAWING ARE ONLY APPROXIMATE. WAECO ENGINEERING HEREBY DISCLAIMS ANY RESPONSIBILITY TOTHIRD PARTIES FOR THE ACCURACY OF THIS INFORMATION. PERSONS WORKING IN THE AREA COVERED BY THIS DRAWING MUST CONTACT THESTATEWIDE CALL-BEFORE-YOU-DIG SYSTEM TO ASCERTAIN THE LOCATION OF UNDERGROUND UTILITIES PRIOR TO PERFORMING ANY EXCAVATION.1.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORK STANDARDS AND THESTANDARDS AND SPECIFICATIONS SET FORTH IN THE JURISDICTION REGULATIONS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERETHERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE HIGHER QUALITY STANDARD SHALLAPPLY. ALL WORK WITHIN THE PUBLIC R.O.W. OR EASEMENTS MAY REQUIRE INSPECTION AND APPROVAL BY THE JURISDICTION INSPECTOR.INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TO BE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.2.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ON THESE PLANS, ISBASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TOBE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCAL UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFOREANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS ANDELEVATIONS, ESPECIALLY AT THE CONNECTION POINTS AND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THECONTRACTOR TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.3.THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THE CONTRACTOR SHALLNOTIFY THE JURISDICTION INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTH DISTURBING ACTIVITY OR CONSTRUCTION ON ANYAND ALL PUBLIC IMPROVEMENTS IF REQUIRED.4.THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE JURISDICTION AND ALL UTILITY COMPANIES WITH REGARD TO RELOCATIONS ORADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION, AND WITH AMINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANYUTILITY SERVICE.5.THE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS ANDSPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALL TIMES.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION, TRENCHING, SHORING,TRAFFIC CONTROL, AND SECURITY.7.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, OR OTHER AFFECTEDPARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THEENGINEER IMMEDIATELY.8. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESS SPECIFICALLY STATEDOTHERWISE.9. FOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE JURISDICTION, THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL ANDPHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN OR AFFECTING THERIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE REQUIRED BY SAIDPLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BE HELD WITH JURISDICTION.10. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THE INTENDEDIMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVED OR RELOCATED UNLESSSPECIFICALLY NOTED OTHERWISE.11. PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALL CONSTRUCTION DEBRISAND DIRT TRACKED FROM THE SITE.12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT AT THE CONSTRUCTIONSITE AND AVAILABLE TO THE JURISDICTION INSPECTOR AT ALL TIMES.13. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATION CONTACT THEENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.14. ALL TEMPORARY EROSION AND SEDIMENT CONTROL (T.E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TO GROUNDDISTURBING ACTIVITY. ALL T.E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCH TIME AS THE ENTIREDISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.15. ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE JURISDICTION ENGINEERING DEPARTMENT STANDARDDETAILS AND SPECIFICATIONS.16. ALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTH MOVINGEQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THE TIME PERIOD APPROVEDBY THE JURISDICTION.3ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024140_RENTON_PT-5859527_20240131\CAD DATA\1024140_PT-5859527_PLANS.DWG 2/23/2024 12:44 PMSHEET #PROJECT NUMBER: PT-5859527VERIZON ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: VERIZONPERMIT NUMBER: XX1215 MONSTER ROAD SW,RENTON, WA, 98055ORIGINALREV #0REVIEWEDAS-BUILTDATE2/22/24TECHENGTLFJJP------------------------WAECO ENGINEER----2/23/24----SCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425-471-1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: XX MFP24001109 RRRRRAERIALPLAN VIEWSCALE: 1"=30'30'020'10'CONSTRUCTION NOTESRESTORATION NOTES4ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024140_RENTON_PT-5859527_20240131\CAD DATA\1024140_PT-5859527_PLANS.DWG 2/23/2024 12:44 PMSHEET #PROJECT NUMBER: PT-5859527VERIZON ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: VERIZONPERMIT NUMBER: XX1215 MONSTER ROAD SW,RENTON, WA, 98055ORIGINALREV #0REVIEWEDAS-BUILTDATE2/22/24TECHENGTLFJJP------------------------WAECO ENGINEER----2/23/24----SCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425-471-1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: XXPLAN VIEWSCALE: 1" = 30'2RELOCATE EXISTING RISER FROM DAMAGEDEXISTING POLE TO REPLACEMENT POLE.1OPEN TRENCH TO PLACE (1) 4" CONDUIT FORRELOCATION OF RISER TO REPLACEMENT POLE.MONSTER RD SWRISER TO BERELOCATEDDAMAGED POLERELOCATED RISERON REPLACEMENT POLEREPLACEMENTPOLE12RELCOATION DETAIL 1SCALE: 1" = 10'(4')MONSTER RD SWARESTORATION DETAIL 2SCALE: 1" = 10'ARESTORE SOFT SURFACE TO PRIOR CONDITION4'3'21REFER TO DETAIL 1FOR RISER RELOCATIONREFER TO DETAIL 2FOR RESTORATIONMONSTER RD SW1PARCEL#2423049075PARCEL#2423049006MFP24001109 SITEPHOTOGRAPHS1FACING SOUTHEAST, ON MONSTER RD5ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024140_RENTON_PT-5859527_20240131\CAD DATA\1024140_PT-5859527_PLANS.DWG 2/23/2024 12:44 PMSHEET #PROJECT NUMBER: PT-5859527VERIZON ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: VERIZONPERMIT NUMBER: XX1215 MONSTER ROAD SW,RENTON, WA, 98055ORIGINALREV #0REVIEWEDAS-BUILTDATE2/22/24TECHENGTLFJJP------------------------WAECO ENGINEER----2/23/24----SCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425-471-1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: XX CONSTRUCTION NOTES2RELOCATE EXISTING RISER FROM DAMAGEDEXISTING POLE TO REPLACEMENT POLE.1OPEN TRENCH TO PLACE (1) 4" CONDUIT FORRELOCATION OF RISER TO REPLACEMENT POLE.21(4')MFP24001109 AERIAL TYPICALS6ENGINEERING FIRM: WAECO ENGINEERINGDRAWING FILE PATH: V:\ENGINEERING\BUILT\1024140_RENTON_PT-5859527_20240131\CAD DATA\1024140_PT-5859527_PLANS.DWG 2/23/2024 12:44 PMSHEET #PROJECT NUMBER: PT-5859527VERIZON ENGINEERPROPRIETARY - NOT FOR DISTRIBUTIONCLIENT FIRM: VERIZONPERMIT NUMBER: XX1215 MONSTER ROAD SW,RENTON, WA, 98055ORIGINALREV #0REVIEWEDAS-BUILTDATE2/22/24TECHENGTLFJJP------------------------WAECO ENGINEER----2/23/24----SCOTT CHRISTENSONJOSEPH PARKER253.315.3326JPARKER@WAECOENG.COM425-471-1079SCOTT.CHRISTENSON@VERIZON.COMKnow what's below.Call before you dig.ROF6WAECO INTERNAL PROJECT NUMBER: XX MFP24001109