Loading...
HomeMy WebLinkAboutChange Order - 16Joni Dombrowski Digitally signed by Joni Dombrowski DN: C=US, E=jonid@olsonbrothers.net, O="Olson Brothers Excavating, Inc.", CN=Joni Dombrowski Date: 2024.03. 15 08: 26: 50-07'00' DocuSign Envelope ID: 8FF8CF42-DEAA-4048-BE25-F9AE1126C119 4/ 3/2024 | 2:00 PM PDT CAG-22-265, CO #16-24 Approved by Cheryl Beyer via 3/4/2024 email THE CONTRACT IS MODIFIED AS FOLLOWS: Description of Change: This Change Order adds a new bid item "A95 - Grounding Grid" and provides a price adjustment of $2,139.27 per Section 1-09.6. Measurement: The new bid item "A95 - Grounding Grid" shall be measured by Force Account. Payment: The new Bid Item "A95 - Grounding Grid" shall be paid as force account and shall cover the complete cost of providing all labor, materials, tools, equipment required to complete the Work. Reason for Change: The grounding grid on the west side of the PSE substation and Boeing Power facility was damaged while installing the Structural Earth Wall. The Contractor was directed to remove the damaged section, extend, and reroute grounding wire with the same #AWG and reconnect ends with CAD weld. Affects DBE Work: D Yes 181 No Explain how this Change Order affects DBE work. Materials No change Plans: List plan sheet numbers, if any. None Equitable Adjustment: This Change Order does include an equitable adjustment per Section 1-09.4 of the 2022 WSDOT IAPWA Standard Specifications. As this change order is calculated using force account additional field overhead is not added to the equitable adjustment for the added working day. Extension of Time: The Time for Completion is extended 1._Working Day. Change Order No. Contract Title: Contract No. 16 PARK AVENUE N EXTENSION CAG-22-265 Page 2 of 3 DocuSign Envelope ID: 8FF8CF42-DEAA-4048-BE25-F9AE1126C119 DocuSign Envelope ID: 8FF8CF42-DEAA-4048-BE25-F9AE1126C119 DocuSign Envelope ID: 8FF8CF42-DEAA-4048-BE25-F9AE1126C119