Loading...
HomeMy WebLinkAboutNEW_M_Response to Comments_Tran Short Plat_240620_v2 August 7, 2023 Will Sowder Puget Sound Permits 405 6th Avenue Tacoma, WA 98402 SUBJECT: "On Hold" Notice #2 – Final Notice Tran Short Plat, LUA22-00276, SHPL-A, MOD Dear Mr. Sowder, The Planning Division of the City of Renton accepted the above master application for review on July 27, 2022. During review of the submitted project documents, staff determined that additional information was needed in order to proceed with review of the application and requested the subject information on August 23, 2022 (letter attached). As of the writing of this letter, the information has not been submitted to staff and review of the application has remained on-hold. In order to ensure the application proceeds in a timely manner, please submit the required materials within sixty (60) calendar days of this notice so that review of the application can continue. If the materials are not received by the end of the sixty (60) day deadline, the short plat application shall be void and a new application and associated fees will be required in order to proceed with the project. Please contact me at (425) 430-7219 if you have any questions. Sincerely, Alex Morganroth Senior Planner cc: Sang Tran/Owner Chris Tibaldi/Engineer Yong Qi/Staff Attachment: On-hold letter dated August 23, 2022 August 24, 2022 Will Sowder Puget Sound Permits 405 6th Avenue Tacoma, WA 98402 SUBJECT: "On Hold" Notice Tran Short Plat, LUA22-00276, SHPL-A, MOD Dear Mr. Sowder, The Planning Division of the City of Renton accepted the above master application for review on July 27, 2022. During review of the submitted project documents, staff has determined that additional information is needed in order to proceed with review of the application. Specifically, the applicant shall address the following: - Provide updated Technical Information Report that complies with the 2022 Renton Surface Water Design Manual - Update site plan to show joint use driveway tract between lots 1 and 2 as required in original Tran Short Plat decision and as shown on the civil construction permit documents. - Update conceptual landscape plan to comply with landscape requirements in RMC 4-4-070, including adding on-site trees to meet tree density minimum, providing street trees in front of all three lots, and 10 feet of on-site landscaping along all lot frontages. At this time, your project has been placed “on hold” pending receipt of the updated project documents identified above and in the attached memo. The maximum time for resubmittal shall be within ninety (90) days of this notice, unless an extension is approved by the Current Planning Project Manager. Please contact me at (425) 430-7219 if you have any questions. Sincerely, Alex Morganroth Senior Planner cc: Sang Tran/Owner Chris Tibaldi/Engineer Jonathan Chavez/Staff