Loading...
HomeMy WebLinkAboutR-425528O v PROPERTY LINE (TYP) 10' UTILITY EASEMENT (TYP) 79f71.91- BEGIN ROAD IMPROVEMENTS Q 8"WATERX(G1) U z RIM=437.03' an IE 12" CNC E=433.68' 00 IE 8" CNC SE=433.88' IE 8" CNC SW-433.88' IE 12" CNC W=433.78' M 430 420 CM TRACT N SEE SHEET (OPEN SPACE) CATCH BASIN TYPE 1 SEE SHEET C4, O5 PROPOSED STREET PER C.O.R. STD DTL 200, LIGHT (TYP) SEE SHEET C4.33 C4r 01 BSBL 9 8 I I 7 I(TYP) 6 5 — — — — — I -- — — — -54LF 12" PVC ®0.0224 I PROPOSED FAMISH GRADE CONTOUR 1 I (TYP) �R�� RTY L/NE J.J I 10' UTILITY � ., ... . — - ... off H _\.�END ROAD 0HP o) ore oHP a oMTH�4-178J IMPROVEMENTS -= / SD F 7 RIM=436.07' IE 8" CNC NW=435.22 81f00 W W � r SDI SD cn- TRACT 0 (OPEN SPACE) - SEE SHEETS C4.10-C4.11 FOR STORM SERVCE LINE DESIGN (TYP) -STORY CLEANOUT PER C. O.R. STD DTL 226, SEE SHEET C4.33 (TYP) 4 3 ti I. III o Z3 W a Gy IE 12 CN = AEA—G I I IE 12" CNC W=424.44' SD CM CM -- --- X — — —1 .. -80f00.00, NE 12TH ST = 81f8 50f00.00, ROW 4 9.10, NE 12TH ST = lOf 00. 00, ROAD A EX GROUND ' CONTOUR (TYP) CB 15 RIM=426.63' STA. 81f47.00, 22.25' LT IE 8" CNC NE=425.78' TYPE 1, RIM 429.40 12" /F OUT 425.40 (NE) 79+50 80+00 80+50 UNDERGROUND LOCATOR SERVICE CALL BEFORE YOU DIG. 811 81 +00 SD G SD ---- SD � Ium / X 3 RIM=42641' / Da IE 8" CNC NW--25:5 RIM=427.83' q1'S IE 12" CNC E=424.93' IE 8" CNC SE-425.03' IE 8" CNC SW=425.03' IE 12" CNC W=425.03' SEE SHEETS C7.02-C7.04 FOR UTILITY CROSSING NFORMAT/ON. 81 f50 82+00 82+50 83+00 1 REVISED PER CITY COMMENTS MJS 7/26/231 HHH SURVEYED: BY OTHERS 2 REVISED PER CITY COMMENTS KEL 9/12/23 HHH DESIGNED: ROLL/ HEAVR/N 3 REVISED PER CITY COMMENTS KEL 10/11/22 HHH DRAWN: MARY MOORE CHECKED: ROLL/ HEA VR/N NO. REVISION BY DATE APPR APPROVED: ROLL/ HEA VR/N Z �426— W W W- SAWCUT (TYP) —G G SD� SD G_ m—SD�r�SD X X O O 83+50 SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL- NAD 1983/1991 DATU M `(EYMAP O O O N N SCALE: 1" = 30' 0 15 30 60 STORM LEGEND 440 STORM PIPE STORM SE?WCE — — — — STORM EASEMENT EX/STING STORM PIPE STORM PIPE FLOW ARROW ❑❑ STORM STRUCTURE - TYPE 1 CB STORM STRUCTURE - TYPE 2 CB STANDARD NOTES 1. ALL STORM FRAMES SHALL BE VANED GRA TES PER 430 C.O.R STD DTL 204.2 UNLESS OTHERWISE NOTED. SEE DETAIL SHEET C4.33. 2. STORM FRAMES WITHIN SAG CURVES AT LOW POINTS SHALL BE BI-DIRECTIONAL VANED GRA TES PER C. O. R. STD DTL 204. J SEE DETAIL SHEET C4.33. J PIPE MA TER/AL SHALL CONFORM TO THE 2022 RSWOM CHAPTER 4, SECTION 4.2.1. AND TABLE 4.1.1.A2. 4. SEE SHEET C4.10 AND C4.11 FOR STORM SERVICE PLAN. 5. PIPE MA TER/AL SHOWN AS C-900 PVC MAY BE CLASS 52 DUCT/LE IRON /F DES/RED. 420 1 0/11/23 CIVIL ENGINEERING LANDSCAPE ARCHITECTURE PLANNING DESIGN SURVEYING 12100 NE 195th St, Suite 300 Bothell, Washington 98011 425.885.7877 R-425528 84+50 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SURFACE WATER UTILITY DEVELOPMENT ENGINEERING jfarah 12/06/2023 yqi 12/06/2023 N DATE: O CITY 0 F TOWNS ON 12TH 10/111202J 3916 & 3926 NE 12TH ST, RENTON, WA 98056 FIELDBOOK: RENTON PAGE: DRAWING NO: Planning/Building/Public Works Dept. ROAD & STORM DRAINAGE PLAN & PROFILE C4.08 NE 12TH ST SHEET: 28 OF, 93