Loading...
HomeMy WebLinkAboutHaevin Ridge As-Built.(2024.01.12)_v46'-0" Wood ScreenFence (Red)Street Tree20' StreetLight OffsetWater Meter (typ.)Bio-RetentionStreet Light PoleS i d e w a l kDriveway (typ.)Tree to be Removed(typ.)Dispersion Trench(typ.)Tree to be Retained(typ.)6'-0" WoodScreen Fence(Red)6'-0" Wood ScreenFence (Red)S i d e w a l kGENERAL NOTES:1. Coordinate work with other trades as required. Determinelocation of underground utilities and perform work in a mannerwhich will avoid possible damage. Coordinate with UtilitiesUnderground Location Center and Owner for locations ofexisting underground utilities, etc. servicing or routed throughthe site.2. Provide protection of all property, persons, work in progress,structures, utilities, walls, walks, curbs and paved surfacesfrom damages incurred arising from this work. The Contractorshall pay for any such damage at no additional cost to theOwner.3. Prior to beginning any construction activities, arrange anon-site pre-construction meeting with Owner's Representativeto discuss and review Tree Protection Measures aroundexisting trees to be retained (if noted).4. During construction, keep pavements, building clean.Protect site and adjacent properties from damage due toconstruction operations, operations by other Contractors/tradesand trespassers. Unfinished and completed work shall beprotected from damage by erosion or trespassing, and propersafeguards shall be erected to protect the Public.5. Staking and Layout: Immediately notify Landscape Architectin writing of any variance between plans and actual site.Landscape Architect has the right to adjust the location ofelements. Verify layout with Landscape Architect prior to anyinstallation work.6. Verify installation conditions as satisfactory to receive work.Do not install any site elements until any unsatisfactoryconditions are corrected. Beginning of work constitutesacceptance of conditions as satisfactory. When conditionsdetrimental to plant growth/contructed elements, areencountered such as rubble fill, adverse conditions, orobstructions, notify Landscape Architect.7. New Landscape Plantings will be watered by a BidderDesign Automatic Irrigation System submitted for approval toOwner's Representative prior to beginning landscapeconstruction.PLANTING NOTES (cont.):texture shall be used as an amendment. Provide textural andnutrient analysis for review and approval. Minimum soilspecifications after amendments shall show a minimum organiccontent of 10% (by weight) and pH shall be between 5.5- 7.0.See BMP T5.13 in WDOE Stormwater Management Manual forWestern Washington.2. Soil Preparation: Planting Beds: See City of RentonStandard Plan-264.00 Soil Amendment Sections Options 2,3and 4/ Planting Beds for scarifying and amended soil depths.All Other Pervious Areas Other than Planting Beds (above):See City of Renton Standard Plan -264.00 Soil AmendmentSections Options 2,3 and 4/ Turf Areas for scarifying andamended soil depths.Bio-Retention Facility: See Civil Plans for Bio-RetentionPlanter grading, cross section and underdrain (if required).Place imported (or amend existing soils) and mulches per 2017City of Renton Surface Water Design Manual Section 6.8Bioretention Facility Designs.3. Fertilize all installed plants during backfill operations (exceptfor Bio-retention Facility) with 4-2-2 Agro Transplanter asrecommended by Manufacturer.4. Substitutions or changes in materials and placement shallbe made only on the written change orders as agreed betweenContractor, Landscape Architect, City and Owner.5. Mulch all newly planted ornamental beds with a minimumthree inch (3") depth of approved coarse bark 'mulch' mix orArborist's Chips. Finish grade of mulch shall be 1" belowadjacent hard surfaces/ walls.IN COMPLIANCE WITH CITY OF RENTON STANDARDS6. Stake trees per detail and as directed by LandscapeArchitect.TREE REPLACEMENT/ DENSITY CALCULATIONS:(See also TREE RETENTION PLAN and Consulting Arborist Report)Tree Replacement Requirements:Total Significant Trees- 31Significant Trees Required to be Retained- (30% of 31) = 9.3Significant Trees Retained- 9 (736,737,746,752,753,758,759,766,A)Total Quantity of Trees to be Replaced- 0.0Tree Density Requirements:2 trees per 5000 s.f. of Lot6 Lots times 2 trees each = 12 trees (@ 1-1/2" ea.) = 18 inchesTotal Tree Inches Provided- 111 inches(Deciduous Trees= 55 inches, Conifer Trees= 28 (qty.) x 2" ea. = 56 inches) 2019 Copyright Glenn Takagi LandscapeArchitect. All Rights Reserved. All drawn andwritten information incorporated herein is aninstrument of professional practice and is theproperty of Glenn Takagi Landscape Architectand not to be used in whole or in part withoutthe written authorization of Glenn TakagiLandscape Architect.PLANTING NOTES:1. Planting soil for new planting areas shall be an approvedCompost cultivated into the existing prepared subgrade. Ifexisting subsoil is determined to be not suitable by LandscapeArchitect, a pre-mixed garden soil with a 'Sandy Gravelly Loam'AS-BUILT - PLAT LANDSCAPE End PostLine PostLine PostEnd Post1 x 6 Board2 x 6 Cedar Fence Boardsw/ 12" gap.Use full length boards tospan two posts; alternatejoints. Face boards toinside of Plat.Finish Grade. Keep BottomBoard a Min. 2" Clear ofTop of Mulch.4 X 4 Pressure TreatedPosts on Galv. Pipe.Compacted SubgradeELEVATION VIEWPLAN VIEWIN COMPLIANCE WITH CITY OF RENTON STANDARDSAS-BUILT - PLAT LANDSCAPE