HomeMy WebLinkAbout04249 Renton WA.Rpt.0007.2024-04-22.Masonry Observations.GREENMASONRY OBSERVATIONS REPORT Report Number:M7241122.0007 Service Date:04/22/24 20225 Cedar Valley Rd Ste 110 Report Date:04/23/24 Lynnwood, WA 98036-6365 Task:Masonry Inspection 425-742-9360 Client Project Chick-fil-A Inc Chick-fil-A #04249 Renton, WA (T) Attn: Kari Teresa 375 Rainier Ave S 5200 Buffington Road Renton, WA 98055 Atlanta, GA 30097-3508 Project Number: M7241122 Services: Special Inspections / Materials Testing Terracon Rep.: Joseph Allen Reported To:Jim Hibbard with ESI Contractor:ESI Report Distribution: See attached distribution list. Reviewed By:____________________________________ Myndi Kraft Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM014, 04-29-22 Rev.5 Page 1 of 1 Permit No: C23000412 General Information Jim Hibbard with ESI requested Terracon be on site for masonry observation, reinforcing steel observation of the following elements: walls. These elements are being constructed by ESI. The results of observation(s) for today were reported to Jim Hibbard with ESI. The construction documents referenced for this inspection include: Structural plans dated 12/21/2023. Masonry Observations Construction Type Masonry Block Type/Size Elevation /Location Comments Status Walls Normal Weight 8" - CMU (2) Top of footing to 9'-4"/SW corner of New lot. Complies A total of 1 set(s) of 3 masonry prisms were prepared by the masonry contractor. Please reference prism compressive strength report number M7241122.0007A. Referenced document(s) were to details on S-602. Weather procedure(s) were not followed. Reinforcing Steel Observations Construction Type Elevation /Location Vertical Reinforcement Summary Bond Beam Reinforcement Summary Lintel Reinforcement Summary Embedded Items Comments Status Walls (1) Top of footing to 9'-4"/SW corner of New lot. #6 rebar at 8" on center.(2) #5 rebar in top of wall course.(2) #5 rebar in 2 courses above door. Embed plates in top course.Complies Vertical bar positioners were not utilized. Referenced document(s) were Details on S-602.,. Compliance Statement Based on our observations, masonry activities observed at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications. Photo Log Report Number:M7241122.0007 Service Date:04/22/24 20225 Cedar Valley Rd Ste 110 Report Date:04/23/24 Lynnwood, WA 98036-6365 Task:Masonry Inspection 425-742-9360 Chick-fil-A IncAttn: Kari Teresa CT0001, 10-16-13, Rev.10 Page 1 of 1 (P1) Grout fill for trash bin enclosure. (P2) Grout fill of trash bin enclosure. Report Date: Service Date: Report Number: Task: M7241122.0007 04/22/24 04/23/24 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360Masonry Inspection Distribution List Distribution Page (1) Chick-fil-A Inc, Kari Teresa (1) Barghausen Consulting Engineers, Inc., Alex Bell (1) City of Renton WA, Development Engineering (1) City of Renton WA, Patrick Decaro (1) City of Renton WA, Yong Qi (1) ESI Construction Inc, Eric Quevedo (1) ESI Construction Inc, Jim Hibbard (1) Jones Lang Lasalle, Agustin Solaberrieta (1) Jones Lang Lasalle, Maggie Nuckols (1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Myndi Kraft