CAG-22-062, CO #12-24
Approved by Cheryl Beyer via email 4/3/2024
Change Order No. ____12_____
Contract No.: CAG 22 062
Contract Title: Bronson Way Bridge Seismic Retrofit and Painting
Project No.: TED4004020 Page 2 of 3
THE CONTRACT IS MODIFIED AS FOLLOWS:
Description of Change:
The Change Order reconciles the estimated bid item quantities to the adjusted final bid item
quantities of the Work completed.
Reason for Change:
At the time of bid, the bid item quantities are based on estimates of the Work to be performed.
Once the Work is completed, the adjusted final quantities are known for each bid item included
in the contract (including executed change orders). To reconcile the total contract amount with
the total payment for Work completed, this change order is necessary to reconcile the quantity
of each bid item included in the contract at the time of bid with the adjusted final quantity of
each bid item included in the contract at the time of completion of the Work.
Affects DBE Work:Yes No N/A (Not FHWA Funded)
Materials:
N/A
Plans:
N/A
Equitable Adjustment:
This Change Order does not include an equitable adjustment per Section 1 09.4 of the 2022
WSDOT/APWA Standard Specifications. This Change Order adjusts the estimated Bid quantities
to the adjusted final quantities of each bid item included in the Work completed. The awarded
contract amount was $2,505,667.00. The sum total of Change Orders 1 thru 11 increased the
contract amount by $88,814.72 to a total of $2,594,481.72. The net change in contract amount
as a result of this change order is $3,597.50. This results in a total final contract amount of
$2,598,079.22. The quantity reconciliation summary is attached.
Extension of Time:
The Time for Completion is extended 0 Working Days.
Change Order No. ____12_____
Contract No.: CAG 22 062
Contract Title: Bronson Way Bridge Seismic Retrofit and Painting
Project No.: TED4004020 Page 3 of 3
Sections 1 04.4and 1 04.5of the 2022WSDOT/APWA Standard Specifications shallgovern this
ChangeOrder.TheWorkofthereferencedContractismodifiedtoincludethechangesdetailed
herein.The paymentprovided forherein shallconstitutethecomplete andfinal settlement for
all costs of labor, equipment, materials, overhead, profit, permit fees, andall other claims that
may be made by the Contractor as a result of this change.
Attachments to this Change Order:
Field Directive
Equitable Adjustment Determination
Determination of Additional Working Days
Engineers Estimate of Change Order Cost
Engineers Calculation of Additional Working Days
Contractors Quote
Plans
Project Labor List
Contractors Equipment List including rates per AGC WSDOT Equipment Rental
Agreement
Summary of invoices for rented equipment
Summary of invoices for materials
CHANGE ORDER NO. 12 QUANTITY RECONCILIATION
Project Name:
City Project Number:
City ContractNumber:
Contractor:
CHANGE
ORDER
BID ITEM ITEM DESCRIPTION SPEC. UNIT QUANTITY UNIT PRICE AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT NUMBER
1 STRUCTURE SURVEYING 1 05 L.S. 1 $16,610.00 $16,610.00 1 $16,610.00 0 $0.00
2 SPCC PLAN 1 07 L.S. 1 $5,000.00 $5,000.00 1 $5,000.00 0 $0.00
3 NO TRESPASSING SIGN 1 07 EACH 6 $500.00 $3,000.00 6 $3,000.00 0 $0.00
4 HEALTH AND SAFETY PLAN 1 07 L.S. 1 $5,000.00 $5,000.00 1 $5,000.00 0 $0.00
5 FA SITE CLEANUP OF BIO. AND PHYSICAL HAZARDS 1 07 EST. 1 $5,000.00 $5,000.00 0 $0.00 1 $5,000.00 11
6 MOBILIZATION 1 09 L.S. 1 $270,000.00 $270,000.00 1 $270,000.00 0 $0.00
7 PROJECTTEMPORARY TRAFFIC CONTROL 1 10 L.S. 1 $280,000.00 $280,000.00 1 $280,000.00 0 $0.00
8 FLAGGERS 1 10 HR 480 $80.00 $38,400.00 0 $0.00 480 $38,400.00 11
9 OTHER TRAFFIC CONTROL LABOR 1 10 HR 480 $80.00 $38,400.00 246 $19,680.00 234.00 $18,720.00
10 CONSTRUCTION SIGNS CLASS A 1 10 S.F. 1,034 $45.00 $46,530.00 120 $5,400.00 914 $41,130.00 3
11 SEQUENTIAL ARROW SIGN 1 10 HR 7,392 $5.00 $36,960.00 5,715 $28,575.00 1,677 $8,385.00
12 PORTABLE CHANGEABLE MESSAGE SIGN 1 10 HR 8,064 $9.00 $72,576.00 8,932 $80,388.00 868 $7,812.00
13 ROADSIDE CLEANUP 2 01 EST. 1 $5,000.00 $5,000.00 0.036446 $182.23 0.963554 $4,817.77
14 REMOVING PORTION OF EXISTING BRIDGE 2 02 L.S. 1 $30,000.00 $30,000.00 1 $30,000.00 0 $0.00
15 SEALING EXISTING LONGITUDINAL AND TRANSVERSE JOINT 5 03 L.F. 65 $35.00 $2,275.00 50 $1,750.00 15 $525.00 7
16 HMA SAWCUT AND SEAL 5 03 L.F. 402 $35.00 $14,070.00 402 $14,070.00 0 $0.00
17 PAVED PANEL JOINT SEAL 5 03 L.F. 170 $45.00 $7,650.00 170 $7,650.00 0 $0.00
18 HMA CL. 1/2 IN. PG 58H 22 5 04 TON 111 $1,000.00 $111,000.00 116 $116,000.00 5 $5,000.00 4
19 JOB MIX COMPLIANCE PRICE ADJUSTMENT 5 04 CALC. 1 $1.00 $1.00 0 $0.00 1 $1.00 11
20 COMPACTION PRICE ADJUSTMENT 5 04 CALC. 1 $1.00 $1.00 0 $0.00 1 $1.00 11
21 ASPHALT COST PRICE ADJUSTMENT 5 04 CALC 1 $1.00 $1.00 583.56 $583.56 584.56 $584.56
22 WORK ACCESS BEARINGS 6 01 L.S. 1 $40,000.00 $40,000.00 1 $40,000.00 0 $0.00
23 BRIDGE JACKING 6 01 L.S. 1 $60,000.00 $60,000.00 1 $60,000.00 0 $0.00 5
24 CONC. CLASS 4000 FOR BRIDGE 6 02 C.Y. 4 $9,750.00 $39,000.00 4 $39,000.00 0 $0.00 5
25 PRECAST BEARING PEDESTAL 6 02 EACH 4 $6,000.00 $24,000.00 4 $24,000.00 0 $0.00
26 ST. REINF. BAR FOR BRIDGE 6 02 LB. 1,910 $10.00 $19,100.00 1,976 $19,760.00 66 $660.00 5
27 DEFICIENT STRENGTH CONC. PRICE ADJUSTMENT 6 02 CALC 1 $1.00 $1.00 0 $0.00 1 $1.00 11
28 EXPANSION JOINT MODIFICATION BRIDGE DECK 6 02 L.F. 115 $470.00 $54,050.00 0 $0.00 115 $54,050.00 8
29 EXPANSION JOINT MODIFICATION BRIDGE SIDEWALK 6 02 L.F. 24 $500.00 $12,000.00 0 $0.00 24 $12,000.00 8
30 ELASTOMERIC PAD SUPERSTR. 6 02 EACH 4 $9,940.00 $39,760.00 4 $39,760.00 0 $0.00
31 MODIFY BRIDGE DRAIN ROADWAY 6 02 EACH 4 $3,500.00 $14,000.00 0 $0.00 4 $14,000.00 9
32 MODIFY BRIDGE DRAIN SIDEWALK 6 02 EACH 4 $2,500.00 $10,000.00 0 $0.00 4 $10,000.00 11
33 CLEANING AND PAINTING 6 07 L.S. 1 $539,000.00 $539,000.00 1 $539,000.00 0 $0.00
34 SEALING AND CAULKING PACK RUST 6 07 L.F. 500 $15.00 $7,500.00 214 $3,210.00 286 $4,290.00
35 CONTAINMENT OF ABRASIVES 6 07 L.S. 1 $412,125.00 $412,125.00 1 $412,125.00 0 $0.00
36 TESTING AND DISPOSAL OF CONTAINMENT WASTE 6 07 EST. 1 $50,000.00 $50,000.00 3.8771558 $193,857.79 3 $143,857.79 11
37 REMOVING EXISTING OVERLAY FROM BRIDGE DECK 6 08 S.Y. 1,174 $29.00 $34,046.00 1,187 $34,423.00 13 $377.00
38 BRIDGE DECK REPAIR 6 08 EST. 1 $16,000.00 $16,000.00 0 $0.00 1 $16,000.00 8
39 WATERPROOF MEMBRANE BR. NO. RENTON 42 6 08 S.Y. 973 $32.00 $31,136.00 978.5 $31,312.00 5.5 $176.00
40 EROSION/WATER POLLUTION CONTROL 8 01 EST. 1 $20,000.00 $20,000.00 0 $0.00 1.00 $20,000.00 11
41 INLET PROTECTION 8 01 EACH 16 $250.00 $4,000.00 6 $1,500.00 10.0 $2,500.00
42 STREET CLEANING 8 01 HR 16 $300.00 $4,800.00 3 $900.00 13.00 $3,900.00
43 WATTLE 8 01 L.F. 100 $10.00 $1,000.00 0 $0.00 100 $1,000.00 11
44 HIGH VISIBILITY FENCE 8 01 L.F. 100 $5.00 $500.00 0 $0.00 100 $500.00 11
45 CURB REPAIR 8 05 L.F. 40 $675.00 $27,000.00 0 $0.00 40 $27,000.00 8
46 CONCRETE REPAIR 8 05 EST. 1 $31,000.00 $31,000.00 0 $0.00 1 $31,000.00 8
47 PLASTIC STOP LINE 8 22 L.F. 11 $100.00 $1,100.00 10 $1,000.00 1 $100.00
48 PLASTIC TRAFFIC ARROW 8 22 EACH 3 $700.00 $2,100.00 3 $2,100.00 0 $0.00
49 PROFILED PLASTIC LINE 8 22 L.F. 1,100 $11.25 $12,375.00 542 $6,097.50 558 $6,277.50 6
50 TEMPORARY FENCING 8 26 L.F. 104 $25.00 $2,600.00 317 $7,925.00 213 $5,325.00
51 SITE SECURITY 8 27 L.S. 1 $10,000.00 $10,000.00 1 $10,000.00 0 $0.00
$2,505,667.00 $2,348,691.96 $156,975.04
$12,000.00 $11,561.51 $438.49
$0.00 $0.00 $0.00
$0.00 $44,167.50 $44,167.50
$24,816.00 $24,816.00 $0.00
$31,880.00 $31,880.00 $0.00
$87.75 $6,365.25 $6,277.50
$1,400.00 $1,330.00 $70.00
$26,518.00 $113,532.00 $140,050.00
$1,360.00 $15,360.00 $14,000.00
$375.00 $375.00 $0.00
$43,413.97 $0.00 $43,413.97
$88,814.72 $249,387.26 $160,572.54
$2,594,481.72 $2,598,079.22 $3,597.50TOTAL =
CHANGE ORDER NO. 2 TOTAL =
CHANGE ORDER NO. 3 TOTAL =
CHANGE ORDER NO. 4 TOTAL =
CHANGE ORDER NO. 5 TOTAL =
CHANGE ORDER TOTALS =
CHANGE ORDER NO. 10 TOTAL =
CHANGE ORDER NO. 11 TOTAL =
CHANGE ORDER NO. 6 TOTAL =
CHANGE ORDER NO. 7 TOTAL =
CHANGE ORDER NO. 8 TOTAL =
CHANGE ORDER NO. 9 TOTAL =
PAYMENTS CHANGE ORDER NO. 12
FINAL TOTALS CHANGE
BID SCHEDULE SUBTOTALS =
CHANGE ORDER NO. 1 TOTAL =
CONTRACT
Combined Construction, Inc.
TED4004020
Bronson Way Bridge Seismic Retrofit and Painting
CAG 22 062
Page 1 of 1