Loading...
HomeMy WebLinkAboutAddendum - 1AMENDMENT NO. 1 TO CAG-24-019 THIS AMENDMENT, dated for reference purposes only as April 18, 2024, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Reid Middleton, Inc. (“Consultant”). The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-24-019, dated February 5, 2024, to provide necessary services for the 800 Building Structural Assessment (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, change the time for performance, and change the compensation in order to perform additional surveys of the settlement below the building. NOW THEREFORE, It is mutually agreed upon that CAG-24-019 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit B, which is attached and incorporated herein. 2. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $15,964 from $9,500 to $25,464, plus any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actually performed according to the rate(s) or amounts specified in Exhibit B, which is attached and incorporated herein. 3.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. CAG-24-019, Adden #1-24 Approved by Alex Tuttle via email 4/18/2024 Amendment No. 1 to PROFESSIONAL SERVICES for Renton Municipal Airport 800 W Perimeter Road Building Structural Assessment, Renton, Washington April 18, 2024 This Amendment modifies Exhibit A, dated January 8, 2024, of the Agreement between Reid Middleton, Inc. (Reid Middleton) and the City of Renton (the Client). Provisions of the original Agreement shall apply except as follows: In a letter report written by Reid Middleton, dated March 8, 2024, it was recommended that further study be undertaken to identify the current size, quantity and location of voids beneath the existing ground floor slab. This 2003 report recommended filling the existing voids with grout. It is not clear whether these voids were ever filled with grout. This further study is intended to provide the City of Renton with more current information about the state of the voids underneath the slab and to identify whether the quantity or size of voids has worsened since 2003. The scope of services described in this Amendment are additional services intended to add to the services already provided. A. SCOPE OF SERVICES 1. Slab Scanning Services to scan the ground slab to locate voids beneath it. Scan2Core will also drill into the slab in select locations to measure the height/depth of voids beneath the slab. The drilling is anticipated to occur only in areas of the building with no floor finishes to avoid disturbing (or the need to repair) floor finishes. It is not expected that Scan2Core will scan/measure the entirety of the ground floor slab. Rather, Scan2Core will measure in select locations and compare the information to the measurements taken in 2003. The primary purpose of the scanning is to assess whether grout repair was ever conducted after 2003 and generally assess how much additional ground settlement has occurred since 2003 in selected locations. Scan2Core will spend a maximum of (4) days on site. 2. Underslab Grout Repair Cost Estimate cost estimating subconsultant ProDims will develop a cost estimate for the concept-level repair of the ground floor slab by injection of grout into the voids beneath the slab. The cost estimate will be informed by the GPR scanning conducted in Section A Item 1 and other available information. The cost estimate will be developed in Microsoft Excel in the Uniformat Work Breakdown Structure format. Mr. William Adams Renton Municipal Airport April 18, 2024 File No. 262024.014.000 Page 2 3. Engineering Report and Subconsultant Coordination Reid Middleton will coordinate with and observe the work of Scan2Core. Reid Middleton will also be on site with Scan2Core during a portion of their slab scanning work. Reid Middleton will develop a concept-level repair construction scope of work for the injection of grout into the voids beneath the slab and convey this information to the cost estimator. Reid Middleton will write a letter report summarizing the observations, measurements, and results from the slab scanning and cost estimation services. Reid Middleton will also make recommendations, as appropriate, based on the results of the services including an opinion of possible repercussions if no building repair work is performed. 4. Additional services requested by Renton Municipal Airport, City of Renton or recommended follow-up work noted in the letter report. B. COMPENSATION 1. For services described in Section A, Items 1, 2, and 3, Reid Middleton shall be paid on a time-plus-expense basis in accordance with the provisions of Reid Middleton s Exhibit A, Schedule of Charges Effective July 1, 2023, or on a basis of such other mutually satisfactory arrangements as may be negotiated. Reid Middleton has not utilized all its fee from the original Agreement. It is anticipated that any unused portion of fee from the original agreement will be repurposed for the below tasks. The unused fee will not cover the entirety of the services listed below but is expected to cover a portion of it. The total budget will be limited to the following: Engineering 1. Item 1, Slab Scanning Services $ 7,705 2. Item 2, Underslab Grout Repair Cost Estimate $ 2,259 3. Item 3, Engineering Report and Subconsultant Coordination $ 6,000 TOTAL Services $ 15,964 2. For services described in Section A, Item 4 - plus- Exhibit , Schedule of Charges Effective July 1, 2023, or on the basis of such other mutually satisfactory arrangements as may be negotiated. Mr. William Adams Renton Municipal Airport April 18, 2024 File No. 262024.014.000 Page 3 We appreciate the opportunity to submit this proposed Amendment to Exhibit A, dated January 8, 2024, of our Agreement. The terms of this amendment will become effective when confirmed by your signature within 90 days. If you wish to pursue this project after that time, this amendment may then be renegotiated. If the terms are acceptable, please sign your acceptance below and return one executed copy to Reid Middleton. If you have any questions or comments, please call. Sincerely, Reid Middleton, Inc. Paul Crocker, P.E., S.E. Senior Engineer Director, Structural Engineering Attachments: 1. Scan2Core Fee Proposal 2. ProDims Fee Proposal ACCEPTED: Renton Municipal Airport By Title Date mmt\O:\24\014 Renton 800 W Perimeter Rd Bldg Str Assmt\Contract\2_Amendment #1\RM Fee Est & Scope\240418 800 W Perimeter Bldg Structural Assessment - Reid Middleton - Amendment for GPR Scanning_Revised.docx\kao 520 Kirkland Way Suite 301 Kirkland, WA 98033 P-425-828-0500 F-425-828-0700 www.prodims.com April 17, 2024 Senior Engineer, Structural Group Reid Middleton, Inc. 728 134th Street SW Suite 200 Everett, WA 98204 Reference: City of Renton Building Slab Repairs Cost Estimating Services Dear Kenny, Regarding the scope of work of 4-15-24 via email enclosed is our fee proposal to provide a cost estimate during the conceptual design formatted in Uniformat in MS Excel. Design Phase Cost Estimating Fees: Design Phase Cost Estimates Hours Not To Exceed T+M Rate/hour Hourly Total Fee - NTE Days to Complete the Estimates Conceptual Cost Estimate 8 $245.59 $1,964.72 2 Total $1,964.72 Schedule to complete the work is noted above for each of the estimates. Included is: Develop construction cost estimate based on the drawings, design narratives, reports and photos for the submittals. The construction cost estimate is developed in MS Excel and formatted in Uniformat WBS with Spreadsheet Summary. Updating the cost estimate based on the team and owner feedback within two weeks of delivering the estimate. Team meetings via conference calls/on-line. Excluded from the estimating work is: Site visits and on-site meetings. Major reformatting of the estimates. Owner soft costs estimate. Construction schedule, Life Cycle Costs and value engineering studies are also excluded. Contract Paperwork: Should this proposal be accepted please address the contract to Duane Mask, President and forward to Dennis Teschlog; Senior Estimator. Terms and Conditions: -Fee Proposed to only the company referenced above and is not transferable to another firm. -Fees are based upon available information of the scope of work at the time of the proposal. Should the scope change please contact us to equitably adjust fees. -This fee proposal is good for 180 days from the date above for acceptance. -The work in this fee proposal is to be completed within 365 days from the date of acceptance. Requested Design Team Information: -Please provide one estimating set of design team plans (½ size are fine) and specifications via package. Thank you for considering our services on this project and work look forward to providing value to the design team process. Please contact me at 425-828-0500 or cell 425-299-7430 if you have questions regarding this fee proposal. Sincerely, Dennis Teschlog Dennis Teschlog Senior Estimator PRODIMS cc: project file