Loading...
HomeMy WebLinkAbout04249 Renton WA.Rpt.0005ARev1.2024-04-04.Concrete Compressive Strength Test.GREENCONCRETE SAMPLING REPORT Report Number:M7241122.0005A Service Date:04/04/24 20225 Cedar Valley Rd Ste 110 Report Date:05/02/24 Revision 1 - 28-day results Lynnwood, WA 98036-6365 Task:Reinforced Concrete 425-742-9360 Client Project Chick-fil-A Inc Chick-fil-A #04249 Renton, WA (T) Attn: Kari Teresa 375 Rainier Ave S 5200 Buffington Road Renton, WA 98055 Atlanta, GA 30097-3508 Project Number: M7241122 Services: Special Inspections / Materials Testing Terracon Rep.: Joseph Allen Reported To:Jim Hibbard with ESI Contractor:ESI Report Distribution: See attached distribution list. Reviewed By:____________________________________ Aaron Vanderpol Group Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. DM005, 04-29-22, Rev.11 Page 1 of 1 General Information Jim Hibbard with ESI requested Terracon to be on site for concrete sampling for the following members: pavement. These member(s) are being constructed by ESI. The results of observation(s) for today were reported to Jim Hibbard with ESI. The Terracon representative arrived on site at 0915 and departed at 1315. Permit Number: C23000412. Reinforcing Steel Reinforcing steel was previously inspected by Joe Allen with Terracon on 4/4/2024. Concrete Placement Terracon performed concrete sampling for the following: Element Location Yardage Supplier Mix ID Mix Description Pavement North drive thru lane.52 Corliss C4000A Normal Weight, 4000-psi, air-entrained concrete Placement Method: Boom Pump Tests Performed The following tests were performed and were in accordance with project specifications: Slump, Air Content, Temperature.A total of 4 compressive strength specimens [1 Sets] for lab curing were fabricated. Compliance Statement Based on our observations, cast-in-place concrete construction activities at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications. Report Number: Service Date: Report Date: Task: Client Renton, WA 98055 375 Rainier Ave S Chick-fil-A #04249 Renton, WA (T)Chick-fil-A Inc Attn: Kari Teresa 5200 Buffington Road Atlanta, GA 30097-3508 425-742-9360 Lynnwood, WA 98036-6365 20225 Cedar Valley Rd Ste 110 Reinforced Concrete M7241122.0005A 04/04/24 05/02/24 Revision 1 - 28-day results CONCRETE COMPRESSIVE STRENGTH TEST REPORT Project - M7241122 Permit No.: C23000412 Specified Strength:28 days Mix ID: Supplier: Batch Time: Truck No.: C4000A Corliss Material Information 0933 172 Plant: Ticket No.: 02 20023648 Field Test Data Test Air Content (%): Result Specification 5 1/2 6.0 60 46 4,000 Slump (in): psi @ Concrete Temp. (F): Ambient Temp. (F): Plastic Unit Wt. (pcf): Yield (Cu. Yds.): Sample Information Sample Date: Sampled By: Weather Conditions: Sample Time:04/04/24 1015 Joseph Allen Cloudy with showers. 52 11 10 0 North drive thru lane - west end.Sample Location: Placement Method:Pump Water Added Before (gal): Water Added After (gal): Accumulative Yards:Batch Size (cy): North drive thru lane.Placement Location: Sample Description:4-inch diameter cylinders Laboratory Test Data Set Avg Diam.Area DateDate Test Age at Load Max Strength Comp Frac No.ID Spec Received Tested (days)Type(in)(sq in)(lbs)(psi) Tested ByCond. Cyl. 1 1 3.98 12.44 04/05/24 04/11/24 7 41,250 3 CMSGood 3,320 1 2 3.99 12.5 04/05/24 05/02/24 28 52,180 AJVGood 4,170 1 3 4.00 12.57 04/05/24 05/02/24 28 51,480 AJVGood 4,100 1 4 4.00 12.57 04/05/24 05/02/24 28 51,380 AJVGood 4,090 Average (28 days) 4,120 Initial Cure:Final Cure:Inside Moist Room Comments:Average compressive strength of 28 day cylinders complies with the specified strength. Not tested for plastic unit weight. Samples Made By: Terracon Special Inspections / Materials TestingServices: Reported To: Contractor: Report Distribution: See attached distribution list.Aaron Vanderpol Group Manager ESI Jim Hibbard with ESI Reviewed By: ASTM C 31, ASTM C39, ASTM C138, ASTM C143, ASTM C172, ASTM C231, ASTM C1064, ASTM C1231Test Methods: Terracon Rep.: Joseph Allen The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 of 1CR0001, 3-31-22, Rev.7 Report Date: Service Date: Report Number: Task: M7241122.0005A 04/04/24 05/02/24 20225 Cedar Valley Rd Ste 110 Lynnwood, WA 98036-6365 425-742-9360Reinforced Concrete Revision 1 - 28-day results Distribution List Distribution Page (1) Chick-fil-A Inc, Kari Teresa (1) Barghausen Consulting Engineers, Inc., Alex Bell (1) City of Renton WA, Development Engineering (1) City of Renton WA, Patrick Decaro (1) City of Renton WA, Yong Qi (1) ESI Construction Inc, Eric Quevedo (1) ESI Construction Inc, Jim Hibbard (1) Jones Lang Lasalle, Agustin Solaberrieta (1) Jones Lang Lasalle, Maggie Nuckols (1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Myndi Kraft