Loading...
HomeMy WebLinkAboutMFP24001710.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP24001710 IVR Number: 24001710 Permit Information Permit Name: Lumen P.177669 3717 Lincoln Ct NE Address/Location:04/02/2024Application Date:3345700188Parcel Number: 3717 LINCOLN CT NE Permit Type:05/14/2024Issue Date:Franchise Permit Work Class:05/14/2025Expiration Date:Minor Utility Job Number: P.177669Franchise Type:Telephone Description: Moving existing pedestal 2' east of current location to accommodate new sidewalk being built. Restoration per City of Renton standards Contacts Name Address PhoneTypeBilling Nathan Macleod Lumen 7850 S Trafton St, Bldg B Tacoma, WA 98409 C: (253) 583-6283ApplicantX Dwight Montague Lumen H: (253) 590-6480 C: (253) 590-6480 Applicant Cheyenne Classen North Sky Communications 2112 97th Ave E Tacoma, WA 98444 Contact Michael Smith North Sky Communications 21320 84th Ave S Kent, WA 98032 C: (206) 305-5881Contractor Business License Number: 36846Construction Contractor: NORTHSC857Q4 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner QWest/Century Link - Billing 23315 66th Ave S Kent, WA 98032 Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 3/18/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 3/18/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2.The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: ▪Include map(s) showing the location of the project and work area. ▪Be legible lettering and clear, contrasting, symbols of viewing or printing. ▪Must indicate street names, and north arrow and scale. ▪Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. -Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: P.177669 Permit #: Site Address: 3717 Lincoln Ct NE, Renton, WA 98056 Work Date: From Monday To Friday____3:00____ Work Time: Start ___8 am_______ End __3:00_______ Construction Company: Northsky Communications Contact Name: Phone/Cell: 253 221 6766 Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering Jamie Beckwith 16701 SE McGillivray BLVD Vancouver 98409 Pedestal is in conflict with new sidewalk to be built. Lumen to relocate pedestal 2' east of current location. MFP24001710 Scott Warlick CED 5/14/2024 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 3/18/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: •Must have approved Traffic Control Plan (TCP) prior to commencing the work. •Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. •WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •All permit conditions shall be met. NOTES: •Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. •Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. •In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 3/18/2021 •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) Dwight Montague 04/02/24 LINCOLN AVE NE @ NE 38TH STRELOCATE PEDESTALONE-LANE TWO-WAY OPERATION Comments: RELOCATE PEDESTAL LOCATED OFF ROADWAY.ONE-LANE TWO-WAY TRAFFIC OPERATION.RESTRICTED PARKING THRU WORK ZONE.FLAGGERS ASSIST WITH ALL DRIVEWAYS.FLAGGERS ASSIST WITH ALL PEDESTRIANS.NOTIFY RESIDENCES PRIOR TO ALL WORK.NTRAFFIC CONTROL PLANJOB # P. 177669. C. 45PERMIT # LEGENDCONESFLAGGERWORK AREAWORK TRUCKComments: SIGN SPACINGMPH "X"20 > 100'25-30 200'35-40 350'45+ 500'Jeffrey Hubbard Comments: CHANNELIZATION SPACINGMPH TAPER TANGENT25 / 30 20' 40'35 / 45 30' 60'ONE-LANE TWO-WAY TAPER 50' TO 100' NOT TOSCALE Comments: MERGING TAPER LENGTHTAPER ("L") LANE WIDTH L MPH 10' 11' 12'SHIFTING 20 70 75 80TAPER 25 105 115 1651/2 L 30 150 165 180 35 205 225 245SHOULDER 40 270 295 320TAPER 45 450 495 5401/3 L 50 500 550 600 Designed For: LUMEN Project # P. 177669. C. 45Jeffrey D. HubbardTraffic Control SupervisorWA TCS # ES2000151Draw Date: 3/30/2024Phone 253-737-5198jhubbard.tcp@gmail.com_______________________Date:3/30/2024 Author:Jeffrey D. Hubbard, Traffic Control Supervisor Project:P. 177669. C. 45CERT:WA TCS # ES2000151 LUMEN:Certified Traffic Control Plan LOCATION:RENTON, WAComments: General Requirements1. All signs and spacing to conform to the MUTCD and City of RENTON Requirements.2. Channelizing devices are 28" traffic cones with retro reflective material.3. All signs are 36" x 36" B/O unless otherwise specified.4. Alert affected local residents and businesses.5. Crew is required to leave a minimum 11' for lane width.6. Work hours will be determined by City of RENTON. TCP PROPOSAL: NOT VALID W/O R-O-W JURISDICTION APPROVAL STAMPUNLAWFUL FOR ANYONE (OTHER THAN R-O-W APPROVAL JURISDICTION)TO ALTER W/O CONSENT FROM AUTHOR (JHUBBARD.TCP@GMAIL.COM) X200' +-X200' +-X200' +-BEPREPAREDTO STOPDRIVEWAYX200' +-X200' +-X200' +-ROADWORKAHEADBEPREPAREDTO STOPX100' +-X100' +-X100' +-ROADWORKAHEADBEPREPAREDTO STOP RELOCATEPEDESTALWORK AREA10' X ~50'2525LINCOLN AVE NE LINCOLN AVE NELINCOLN CT NEDEAD END ROADWORKAHEADROADWORKAHEADNE 38TH ST20 20SPEEDLIMIT20 SPEEDLIMIT25 SPEEDLIMIT20 SPEEDLIMIT25SIDEWALKNOFROMTOTOW AWAY AREAPHONE 684-5444YOUR COMPANY NAME 555-5555PARKINGNOFROMTOTOW AWAY AREAPHON E 68 4- 54 44YOUR COMPA NY NAME 5 55 -5 555PARKINGNOFROMTOTOW AWAY AREAPHON E 68 4- 54 44YOUR COMPA NY NAME 555 -5 555PARKING NOFROMTOTOW AWAY AREAPHONE 684-5444YOUR COMPANY NAME 555-5555PARKINGwww.invarion.comMFP24001710 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF BEFORE YOU DIG811CALL TWO WORKING DAYSRNGE:SECT:TOWN:GEO CODE:WC CLLI:TOTAL EXISTING CONDUIT USED:TOTAL NEW BORE:TOTAL NEW DIRT TRENCHESTIMATED TOTALSTOTAL NEW AERIAL:SIDEWALK (PCC) R&R:ASPHALT (AC) R&R:S.F.S.F.L.F.L.F.L.F.L.F.TOTAL NEW ASPHALT TRENCH:L.F.TOTAL NEW S/W TRENCH:L.F.00000000”NVICINITY MAPSCOPE OF WORK:NARRATIVE: THIS IS A CUSTOMER DRIVEN RELOCATION - BART JOB. A PEDESTAL IS IN CONFLICT WITH THE NEWSIDEWALK TO BE BUILT. THE PEDESTAL ALSO SITS IN A DIRT HILL. LUMEN TO LOWER OUR BURIED COPPER LINEALONG THE CONSTRUCTION AREA AND RELOCATE THE PEDESTAL 2FT EAST OF EXISTING LOCATION. NEWPEDESTAL TO SIT IN THE FUTURE PLANNER STRIP.DIG AND EXPOSE OUR COPPER CABLE ALONG LINCOLN CT NE AROUND THE PEDESTAL. RELOCATE THE PEDESTAL2FT EAST OF PEDESTAL'S EXISTING LOCATION.REMOVE TERMINAL IN PEDESTAL (NO WORKERS).®FIBER ENGINEER: BILLY C. HERNANDEZPHONE NO: (253) 458-6549DRAFTED BY: MOUNTAIN LTD/DL - 03/21/2424N532P.177669W23717 LINCOLN CT NERENTON, WA 9805613MFP24001710 TTEE CATV CATV CATV GG TS TS WW S S SD SD IRRIG IRRIG C/L C/L R/W R/W R/W P/L P/L B/C B/C B /C EOP EOP TTTUSAMEEPWREETVTVVTSVWSSDVETTTXXX'XXX'XXX'XXX'XITEM #STATIONPOLE OWNERPROPOSED HOAPOLE NUMBER(S) - CTL/PWR/OTHERITEM#STAHT-CL-YRXX'-X"POLE#MAKE READYEXISTING ATTACHMENTSNOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTJOB:SH OF RNGE:SECT:TOWN:GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS®FIBER ENGINEER: BILLY C. HERNANDEZPHONE NO: (253) 458-6549DRAFTED BY: MOUNTAIN LTD/DL - 03/21/2424N532P.177669W23717 LINCOLN CT NERENTON, WA 9805623MFP24001710 NOTICE-NOT FOR DISCLOSURE OUTSIDE OF CENTURYLINK AND AFFILIATES EXCEPT UNDER WRITTEN AGREEMENTRNGE:SECT:TOWN:JOB:SH OF GEO CODE:WC CLLI: BEFORE YOU DIG811CALL TWO WORKING DAYS®FIBER ENGINEER: BILLY C. HERNANDEZPHONE NO: (253) 458-6549NOTE:THIS IS A CUSTOMER DRIVEN RELOCATION - BART JOB. A PEDESTAL IS IN CONFLICT WITHTHE NEW SIDEWALK TO BE BUILT. THE PEDESTAL ALSO SITS IN A DIRT HILL. LUMEN TOLOWER OUR BURIED COPPER LINE ALONG THE CONSTRUCTION AREA AND RELOCATETHE PEDESTAL 2FT EAST OF EXISTING LOCATION. NEW PEDESTAL TO SIT IN THE FUTUREPLANNER STRIP.DIG AND EXPOSE OUR COPPER CABLE ALONG LINCOLN CT NE AROUND THE PEDESTAL.RELOCATE THE PEDESTAL 2FT EAST OF PEDESTAL'S EXISTING LOCATION. REMOVETERMINAL IN PEDESTAL (NO WORKERS).#33457001883717DRAFTED BY: MOUNTAIN LTD/DL - 03/21/2424N532P.177669W23717 LINCOLN CT NERENTON, WA 9805633 EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W TTT2'NOTE:EX 300PR BURIED COPPER LINE.NOTE:NEW SIDEWALK BOUNDARIES.#33457001863723#33457001903711#33457001923705TTNOTE:PROP 300PR BURIED COPPER LINE.NOTE:PEDESTAL TO BE RELOCATED 2FTEAST OF CURRENT LOCATION. TOSIT IN THE FUTURE PLANNER STRIP.MFP24001710RESTORATION PER CITY OF RENTON STANDARDS