HomeMy WebLinkAboutChange Order - 13DocuSign Envelope ID: 495AA381-5AA2-436F-9D9A-CA88573AF89B CITY OF RENTON Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: Thunder Hills Sewer Interceptor Rehabilitation Laser Underground and Earthworks, inc. CAG-23-048 c.o. #13 CONTRACTOR: SUMMARY OF PROPOSED CHANGE: Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: ITEM Additional Quantities Under This Change Order Unit Qty. Unit Price A78 NEW ITEM: LS 1.00 1,693.35 Furnish and Install 65 LF of 4-inch Wall Drain Pipe, for three rock wall footing drains Sub Total (Schedule A -Sewer) Sales Tax {10.1% for work performed before April 1, 2024) Total (Schedule A -Sewer) Total Price $1,693.35 $1,693.35 $171.03 $1,864.38 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT ESTIMATED NET CHANGE ESTIMATED CONTRACT TOTAL AFTER $2,052,252.99 $2,500,598.54 APPROVAL SIGNATURES: Approved By: Approved By: Approved By: Approved By: Approved By: Jesse Newman, Project Manager � Doo,Sioo,db,c (}J/U,Da�u; rlf'O"a'l'\\'l'Wl'lberg, Laser Underground and Earthworks, inc. �Dooos;oo,db,c rclMl..J �Ir™ off!l�f�1'ii, Utility Systems Director G..:,�;�.�:stucha Martin Pastucha, PW Administrator Cheryl Beyer, Renton City Attorney THIS ORDER CHANGE $1,864.38 $2,502,462.92 Date: 5/1/2024 3:52 PM PDT Date: 5/2/2024 3:43 AM PDT Date: 5/2/2024 7:49 AM PDT Date: 5/7/2024 I 11:46 AM PDT Date: H:\File Sys\WWP -WasteWater\WWP-27-03921 Thunder Hills Sewer Interceptor Rehabilitation\110 -Construction\Change Orders\CO 13 -Rock Wall Footing Drain Extension\Backup\CAG-23-048_CO 13-THSIR 1 Of 1 CAG-23-048, CO #13-24 Approved by Cheryl Beyer via email 4/24/24