Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LUA85-020
BEGINNINU OF FILE FILE TITLE MICRIYIL j 1 6 /1 -Oc9Oi AFFIDAVIT OF PUBLICATION Audrey DeJoie , being first duly sworn on oath states that he/she is the Chief Clerk of the NOTICE OF PUBLIC HEARING RENTON HEARING EXAMINER VALLEY NEWSPAPERS RENTON,WASHINGTON A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT Daily News Journal, Daily Record Chronicle, Daily Globe News HIS REGULAR MEETING IN THE COUN- CIL CHAMBERS ON THE SECOND Daily newspapers published six (6) times a week.That said newspapers FLOOR OF CITY HALL, RENTON, WASHINGTON'ON APRIL 2, 1985, AT are legal newspapers and are now and have been for more than six 9:99 A.M.TO CONSIDER THE FOLLOW- months prior to the date of publication referred to,printed and published ING PETITIONS: in the English language continuallyas dailynewspapers in KingRICHARDo C. SHORE gKent, Application to rezone approximately County, Washington. Valley Newspapers have been approved as legal 1.91 acres of property from G-1 to R-2 and newspapers by order of the Superior Court of the State of Washington for R-3 for future multi-family development,file R-01st side of Grant King County. Avenue located South at 1626 a Grant Avenue South. CITY OF RENTON,PARKS&RECRE-, The notice in the exact form attached, was published in the Daily News ATION DEPARTMENT Journal—, DailyRecord Chronicle_, DailyGlobe News , (and Application00-85 andfor site plan approval, l fe SA-020-85, for Substantial Shoreline not in supplement form) which was regularly distributed to its Development permit, file SM-001-85, to subscribers during the below stated period. The annexed notice a allow the constructionshelterof a di28 foot ed hexagonal picnic including a paved Notice of Public =ie aria; was published picnic patio and the demolition of the old picnic shelter;located along the north bank 139•r (i of the Cedar River in Liberty Park,betweenOnl.ia t'Cil 2'. 19 3> the streets of Bronson Way North and Houser Way North. Legal descriptions of the files noted above are on file in the Renton Building and The full amour,t of the fee charged for said foregoing publication is the Zoning Department. ALL INTERESTED PERSONS TO SAID sum of $ 29. )PETITIONS ARE INVITED TO BE PRE- SENT AT THE PUBLIC HEARING ON APRIL 2, 1985, AT 9:00 A.M. TO EX- PRESS THEIR OPINIONS. Ronald G. Nelson Building and Zoning Director Published in the Daily Record Chronicle March 22,1985. R9771 Subscribed an i sworn to before me this 27 t h day off 3 re n 19 85 . Notar ublic for the State o Washington, residing at Federal Way, Ci aYrprrl r--1 King County, Washington. I :? t` i u VN*87 Rev,sed 10/84 R 15 1985 TT g A — 6r2,0 - 8c5 AFFIDAVIT OF PUBLICATION Audrey D,1 a—, being first duly sworn on oath states that o a.o, Mfg` 2 m he/she is the Chef Clerk of the N o' a v c.c K a s_ 6 umammes3@p o p2 g <.mmA-....v VALLEY NEWSPAPERS ap D 0 -3 a .o» no H `m C zrE. aN,ip. -s . N =macZm . .77 Daily News Journal, Daily Record Chronicle, Daily Globe News o a z z . o 3 o m S S o, g o zk -1D 3. 2wmo—a,p s— Daily newspapers published six(6) times a week.That said newspapers o, m m m m.1 a .s r o O 13ox m < ..~ nm m Z are legal newspapers and are now and have been for more than six a m cn o o x m MILO grim n months prior to the date of publication referred to,printed and published a w m m 8 3 N§ Ns.go g m m C in the English language continually as daily newspapers in Kent, King g o a l al.d.2.o g 3. County, Washington. Valley Newspapers have been approved as legal n D m m io ° ,newspapers by order of the Superior Court of the State of Washington for King County.K 8 m m g m N N g v N The notice in the exact form attached, was published in the Daily News =T wgtq3 m z P. ; y Journal—, Daily Record Chronicle , Daily Globe News , (and <0-. a c-' ,o o ®=9.0 not in supplement form) which was regularly distributed to its m m j . a z -;c1 Nj 2: subscribers during the below stated period. The annexed notice a v 0 -N-`° 8 o®0 8 0 e m n Notice of vironm ntts 1 T-iF , tt p 5 M• w o ` * , a= — oL71eV1@ (rOiriD : S published x m a macro -' a t; °m a Q on ilUrch 11, 1985 0 w $—7 3.0 *m zs . m < n The full amount of the fee charged for said foregoing publication is thea o o 4(7 6._.° 7m5....9.2.P.33 o mao'. y sum of $'3_7L J Subscribed and sworn to before me this)l l th day of MLl re h 19 85 . 2 qi . Notary ublic for the State of Washington, Aft) r tii; f ! ' j?ii r.residing at Federal Way, d King County, Washington. 4.k;a. APR 1 pa VN#87 Revised 10/84 t.. i\ 1 5 1 J:I5 OF R4-,/17 O THE CITY OF RENTON MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 2 eel o BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER 9A FRED J. KAUFMAN. 235-2593 O9gTFD ESEPP4O April 26, 1985 Randy Berg City of Renton Parks & Recreation Department 200 Mill Avenue South Renton, Washington, 98055 RE: File No. SA-020-85; City of Renton Parks & Recreation Dept. Dear Mr. Berg: The Examiner's Report regarding the referenced application which was published on April 11, 1985 has not been appealed within the 14-day period established by ordinance. Therefore, this matter is considered final and is being transmitted to the City Clerk this date for riling. Please feel free to contact this office if further assistance or information is required. Sincerely, Fred J. Kaufman /pi, Hearing xaminer FJK:dk 0859E cc: Ci.y Clerk Building & Zoning Department AFFIDAVIT OF SERVICE BY MAILING STATE OF WASHINGTON ss. County of King DOTTY KLINGMAN being first duly sworn, upon oath, deposes and states: That on the 11th day of April 1985, affiant deposited in the mails of the United States a sealed envelope containing a decision or recommendation with postage prepaid, addressed to the parties of record in the below entitled application or petition. bef SUBSCRIBED AND SWORN to before me this // day of j 1 L.1985. kLiz2A-4-4004f;32-d-dNotaryPublicin _andor the State of Washington, residing at ~ therein. Application, Petition, or Case #: SA-020-85 - CITY OF RENTON PARKS AND RECREATION DEPT. The minutes contain a list of the parties of record.) 0846E April 11, 1985 OFFICE OF THE HEARING EXAMINER CITY OF RENTON REPORT AND DECISION. APPLICANT: CITY OF RENTON, PARKS AND RECREATION DEPARTMENT FILE NO. SA-020-85 LOCATION: Along the north bank of the Cedar River in Liberty Park, between Bronson Way North and Houser Way North. SUMMARY OF REQUEST: Site Approval to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio, and the demolition of the old picnic shelter. SUMMARY OF ACTION: Building and Zoning Department Recommendation: Approval Hearing Examiner Decision: Approved. BUILDING & ZONING The Building & Zoning Department Report was DEPARTMENT REPORT: received by the Examiner on March 26, 1985. PUBLIC HEARING: After reviewing the Building and Zoning Department Report, examining available information on file with the application, and field checking the property and surrounding area, the Examiner conducted a public hearing on the subject as follows: The hearing was opened on April 2, 1985, at 10:00 A.M. in the Council Chambers of the Renton Municipal Building. Parties wishing to testify were affirmed by the Examiner. The following exhibits were entered into the record: Exhibit #1 - Yellow file containing application, proof of posting and other documents pertinent to this request. Exhibit #2 - Site Plan A review of the subject proposal was given by Roger Blaylock, Zoning Administrator. It was noted that this request is to demolish the old picnic shelter and construct a new 28 ft. wide prefab hexagonal picnic shelter, complete with a paved picnic patio. The project is within 200 ft. of the shoreline and will require a separate Shoreline Management Permit, which has already been applied for. The Comprehensive Plan designates the park as a public use facility, and it is presently zoned P-1. The only concern expressed was that a fire hydrant be located within 150 ft. of the facility. There being no further comments, the Hearing Examiner called for testimony in support of the application from the applicant or their representative. Responding was Randy Berg City of Renton Parks and Recreation Department 200 Mill Avenue South Renton, Washington, 98055 Mr. Berg stated he concurred with the recommendation of staff, and asked if there were any questions from the Hearing Examiner or staff. There being none, it was noted for the record that there was no one else in the audience and no further comments received from staff. The hearing was closed at 10:15 A.M. City of Renton, Parks and RGt.d.eation Department SA-020-85 April 11, 1985 Page 2 FINDINGS 1. The applicant, City of Renton, Parks and Recreation Department, has requested approval of a site plan for a picnic shelter in Liberty Park. 2.The application file containing the application, the State Environmental Policy Act SEPA) documentation, the Building and Zoning Department Report, and other pertinent documents was entered in the record as Exhibit it 1. 3. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21 C, 1971, as amended), a Declaration of Non-Significance has been issued for the subject proposal by the Environmental Review Committee (ERC), the responsible official. 4. Plans for the proposal have been reviewed by all City departments affected by the impact of this proposal. 5.There was no opposition to the subject proposal from any member of the public. 6. The subject site is located along the north bank of the Cedar River in Liberty Park. The site is located between Bronson Way North and Houser Way North. 7. While the entire park is approximately 12 acres, the structure is approximately 28 feet wide along its longest dimension. A paved patio will also be installed adjacent to the structure. 8.The subject site is zoned P-1 (Public) and all structures in the zone require site plan approval. 9.The proposed addition will replace a deteriorated old shelter recently removed from the site. 10. A Shoreline Management Permit will be required since the site is located within 200 feet of the Cedar River. 11. The structure will be hexagonal in shape and has been approved for installation by the Park Board. 12. The patio area will carry over the hexagonal motif in a plaza type of arrangement. 13. The map element of the Comprehensive Plan designates the area in which the subject site is located as suitable for the development of public uses, but does not mandate such development without consideration of other policies of the plan. CONCLUSIONS 1.The subject proposal appears to serve the public use and interest. The new structure actually replaces a well used but deteriorated picnic shelter. The design has been approved by the Park Board and should blend with the surrounding play area. 2.The design feature, a hexagonal shape, will be carried over to the laying of concrete for the adjacent patio creating a small plaza effect at the site. 3. Landscaping will remain along the water front site and will not have any impacts on the site. 4. The proposal for a picnic shelter in an existing park also is compatible with the Comprehensive Plan which designates the site for public uses. DECISION The site plan is approved. City of Renton, Parks and Ru,.1eation Department SA-020-85 April 11, 1985 Page 3 ORDERED THIS 11 th day of April, 1985. C)) FRED J. KAUF AN HEARING EXA INER TRANSMITTED THIS 11th day of April, 1985 to the parties of record: Randy Berg City of Renton Parks and Recreation Department 200 Mill Avenue South Renton, Wa. 98055 TRANSMITTED THIS llth day of April, 1985 to the following: Mayor Barbara Y. Shinpoch Councilman Richard M. Stredicke Richard Houghton, Public Works Director Larry M. Springer, Policy Development Director Members, Renton Planning Commission Ronald Nelson, Building & Zoning Director Jim Matthew, Fire Marshall Roger Blaylock, Zoning Administrator Lawrence J. Warren, City Attorney Renton Record-Chronicle Pursuant to Title IV, Section 3015 of the City's Code, request for reconsideration must be filed in writing on or before April 25, 1985. Any aggrieved person feeling that the decision of the Examiner is based on erroneous procedure, errors of law or fact, error in judgment, or the discovery of new evidence which could not be reasonably available at the prior hearing may make a written request for review by the Examiner within fourteen (14) days from the date of the Examiner's decision. This request shall set forth the specific errors relied upon by such appellant, and the Examiner may, after review of the record, take further action as he deems proper. An appeal to the City Council is governed by Title IV, Section 3016, which requires that such appeal be filed with the City Clerk, accompanying a filing fee of $75.00 and meeting other specified requirements. Copies of this ordinance are available for inspection or purchase in the Finance Department, first floor of City Hall. The Appearance of Fairness Doctrine provides that no ex parte (private one-on-one) communications may occur concerning land use decisions. This means that parties to a land use decision may not communicate in private with any decision-maker concerning the proposal. Decision-makers in the land use process include both the Hearing Examiner and members of the City Council. All communications concerning the proposal must be made in public. This permits all interested parties to know the contents of the communication and would allow them to openly rebut the evidence. Any violation of this doctrine would result in the invalidation of the request by the Court. The Doctrine applies not only to the initial public hearing but to all Requests for Reconsideration as well as Appeals to the City Council. J I 1 r I z, \ 41 . • f5\\ ry, pclNc, ftNls is ur,, p s wp df° •• • Lt 6F' r Fly i rr rutiN , 14* N- 64*• -.!-; 7.; , • //: rv1470 f -. 44 • 6411,. 11--..,, f, i R1EA .... 414 P I • - AY, l NEW • ' 7 J N i r ikski.. r. j i 1 r1 1 r.• i • r , SI 1 ` v o 4,_ „1# lir I (. 1z • . ' -' ne rl i tA$ . 1/4, 111!11 -I 0 il CL,3_; _.,9,---;;7;:/ .‘• I / i•-•.; a rl nor I 7,ri/ I CVO c4, c- i.!1i..:.:--.-!•"-•...w....„.- T.'-.; z-!....) 4... — 44-.,- , y • 1 1 .. t1-, r/r -\ 17 TI I Q J 82 1. iti4itigl30- 2 r_ ... .....t-• r .: Lrrr- - O H pL Ira•S79 ty :63 fr1 , !rh 0III ' . Tr r A. ` r ;; V En Es H El s;j H a T' T • _. :eta aar7YaK •' h. y lita J. R - ` - , a ,G4a 1 ,. s . , •, . + c . 1 I. ' • . Z F7-: S . . I-. :7;•: • o .. v t7.47%'-- - 7 CVU ril a l S I ji laa t.vc • 1 {1, w +a.), , W I rnr1-: 11 11 di. . :. ler • \ Yes 2 O Oz 09 Z oI H jOH N 1 AiQ4;33 .: 9 limpjnv1oi. .- i !..5E- 1 r E{ T r441 fi, r 0 vP: H In T, r Q 3nv t_Ar_atiLi .; .a .i . ' , •:t.'in: 9Gttb r-u t • cl.::•'...: - .° . r. 9if - •• 1.4 •I rr:- .,-rte r 1a T-t-f': r -r = M : : rr rrr.- ., 2., .4- •'i4 I,,•• ---1 rt` •r 4' N • • --- m O Q t ;-., 1::r L T.f}".•~ . : r!'i 1 _.r..::^.ar':.•v-• ^.t: .-CO . a 1. .In U' A -J i- 3 lyqs ,. y.«, L_ i 'j ry' r N Ir o r• U W r111.nj1-. I iar •!,:i;i-• 1 xi.,:•TJ- _ _ ?,/ •'1)• 'IL \ ::=;.R,..;1_ A • r11 ` , J H U Z W W c ems:i o. a- ...,. ..• L.1 1._ a„ U a L+_9 ! ui e:.J._ a(s- i'n •. ..••., y f• _ I- 1 .. ... J 4,f rai• fa7de 10,11Ai r. ‘, z• Ir NJ D D (n a• b _`I rm :a:-s•rrT'^•T'.-S N T!`'^•' •F.-t,---' _- CO . I__• -J Z l lo• • --s•asas-_] L._e 1...i•i=•r.;a_,, .!-... •9 .1--i' • Z 4 0 CD GI a Z Z W W (n r'', :. f—,({ all' S 3nv 1tIvanH U r- r. ... In W Zi11I, 1 ;'T did t . p..r! ('9 t.r. U I- I- O ce W L•Z to N a a E n! 71\_ l .T '_ -_I L3s•" .01- f..,•r11f.-1-• •Ttr•'^ 7• r I Q.. •--• .••. rr ate r 57.1.1.l.rirt rr•Tr.r{=rr7 I} ^.- L kt- .I l- I`a 1. h'. L•. Q d W W W 0 • U 1 • ai, T u o••, r f{f[ < d::, :,,1,(..1 L ,..,:,,,0,-,--,-..--,„,,-;;,--: L on i W.1 i s 1.1".--4N'' _ - ;n'jiJ71da1• r.T:.1••••.• /,. , ems' f 9sE.Q.rr 11.._1 1:.. 4 1 t(_' Development of this project shall be undertaken pursuant to the following terms and conditions: This permit is granted pursuant to the Shoreline Management Act of 1971 and pursuant to the following: 1. The issuance of a license under the Shoreline Management Act of 1971 shall not release the applicant from compliance with federal, state and other permit requirements . 2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management Act of 1971 in the event the permittee fails to comply with any condition hereof. 3. A construction permit shall not be issued until thirty (30) days after approval by the City of Renton Building and Zoning Department or until any review proceedings initiated within this thirty (30) day review period have been completed. Zoning Administrator Date THIS SECTION FOR DEPARTMENT USE ONLY 1N REGARD TO A CONDITIONAL USE OR VARIENCE PERMIT DATE RECEIVED: APPROVED: DENIED: This Conditional Use/Variance permit is approved/denied by the Department pursuant to Chapter 90.58 RCW. Development shall be undertaken pursuant to the following additional terms and conditions: Date Signature of Authorized Department Official cc: D.O.E. , NW. District Office City of Renton Attorney General's Office Building and Zoning Department Public Works Department, Engineering Dept. Applicant 1411Z CITY OF RENTON HEARING EXAMINER PUBLIC HEARING APRIL 2, 1985 AGENDA COMMENCING AT 9:00 A.M.: COUNCIL CHAMBERS, SECOND FLOOR, RENT ON MUNICIPAL BUILDING The applications listed are in order of application number only and not necessarily the order in which they will be heard. Items will be called for hearing at the discretion of the Hearing Examiner. RICHARD C. SHORE Application to rezone approximately 1.91 acres of property from G-1 to R- 2 and R-3 for future multi-family development, file R-015-85; located on the east side of Grant Avenue South at 1626 Grant Avenue South. CITY OF RENTON, PARKS & RECREATION DEPARTMENT Application for site plan approval, file SA-020-85, and for Substantial Sh3reline Development permit, file SM-001-85, to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio an:i the demolition of the old picnic shelter; located along the north bank of the Cedar River in Liberty Park, between the streets of Bronson Way Ncrth and Houser Way North. I 1421Z BUILDING AND ZONING DEPARTMENT PRELIMINARY REPORT TO THE HEARING EXAMINER PUBLIC HEARING APRIL 2, 1985 APPLICANT: CITY OF RENTON, PARKS AND RECREATION DEPARTMENT FILE NUMBER: SA-020-85 A. SUMMARY & PURPOSE OF REQUEST: The applicant seeks site plan approval to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio and the demolition of the Id picnic shelter (file SA-020-85). The applicant has also applied for a substantial Shoreline Development Permit, SM-001-85. B. GENERAL INFORMATION: 1. Owner of Record: City of Renton 2.Applicant: City of Renton, Parks and Recreation Department 3. Location: Vicinity Map Attached)Located along the north bank of the Cedar River in Liberty Park, between Bronson Way North and Houser Way North. 4. Existing Zoning: P-1, Public Use 5.Existing Zoning in the Area: P-1, Public Use; B-1, Commercial. 6.Comprehensive Land Use Plan: Recreation 7.Size of Property: 12 acres 8.Access:Bronson Way North 9. Land Use: The subject site is currently used as a park. Picnic shelter is located approximately in same location as old picnic shelter. 10.Neighborhood Characteristics: North: Liberty Park Grounds and Commercial Uses East: I-405 and Cedar River Park South: Cedar River, Public Uses, Commercial Use. West: Liberty Park Grounds C.HI!;TORY/BACKGROUND: The subject site is part of the original city site and has been zoned P-1, Public Use since 1953 when the adoption of the first zoning code. D. PUELIC SERVICES: 1.Utilities: a. Water: A twelve-inch water line extends along Houser Way North near the subject site. In addition, a water supply well is located on the site. b. Sewer: Not applicable. c. Storm Water Drainage: Will not change existing pattern. 2. Fire Protection: Provided by the City of Renton as per ordinance requirements. PRELIMINARY REPORT TO THE HEARING EXAMINER CITY OF RENTON, PARKS AND RECREATION DEPARTMENT: SA-020-85 APRIL 2, 1985, 1985 PAGE 2 3. Transit: Not applicable. 4.Schools: Not applicable. 5.Recreation: The construction of the new picnic shelter will increase the recreational opportunity at Liberty Park. E. APPLICABLE SECTIONS OF THE ZONING CODE: 1.Section 4-710, Public District. F. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN OR OTHER OFFICIAL CITY DOCUMENT: 1.Facilities Objective, Community Facilities Goal, City of Renton Comprehensive Plan Compendium, 1985, p. 24. 2.Community Facilities Objective, Central Area Plan, City of Renton Comprehensive Plan Compendium, 1985, p. 63. 3.Comprehensive Park and Recreational Plan, City of Renton Comprehensive Plan Compendium, 1985, p. 71-78. G. DEPARTMENT ANALYSIS: 1.The applicant, the City of Renton, Parks and Recreation Department, is requesting site plan approval to allow the construction of a twenty-eight (28) foot wide hexagonal picnic shelter including a paved picnic patio adjacent to the structure. The facility will be within two hundred (200) feet of the Cedar River and a Substantial Development permit (SM-001-85) has been requested. 2.The proposal will also include new concrete plazas based on the hexagonal design system interfacing with existing concrete walks in the area. The proposal will replace an old picnic shelter that had basically deteriorated from use over the years. 3.The proposal complies with the intent and designation of Public Use designated by the Comprehensive Plan for Liberty Park. It also complies with the Comprehensive Park Plan. 4.The Environmental Review Committee has issued a Declaration of Non-Significance for the subject proposal. 5.Review of the proposal by City departments has yielded no apparent issues to be resolved. A fire hydrant will be located so that the facility will be within one hundred and fifty (150) feet of a fire hydrant. Some concern was expressed by the Building Division to require site plan approval of replacement of facilities and points to the waste in time and monies for such a review. H. DEPARTMENTAL RECOMMENDATION: Based upon the above analysis, it is recommended that the site plan approval request (SA-020-85) be approved. rr; "• ; O`i CO II 1 // I Th+ f 1.7nrr -•aev Jo tJ en. r + I, A N t- ..'yJ _ / I h : . . Ili / rI O R i i / c . 1r now I 2 H d I " ` G / II .` Ny E Ouvo7 p l1 1 r-+r+ 2 HO CHIp1. Iraq-^_r7a7 ay f at7 TJ.-t- - 1 / t\. 1C' 'r• '' O n am T. --, illillOj A.•• GJ E Litt". ; F -.. 0,-- Ti,`.- 3 H j' i`s a _.•:assll ,• a-7:7ai'd.ru ."A ,0Y.1 l w i a•.G; 3- E 0 2 f=i U cf) 0. ›, 1...1• •• 0 I 1.21i, ToBC.,s I•I. ,1:"j' ; JM1 ••'- f--• • ti,.•_•.,-t" r' H i.?r..• I,: ti...' ,a.•• -•- 1. w S : • :• t,- t , '. I h 0- A./F./moo N 2 Pa O CD a a. lS sr 3^s. - g _„.. t- I^ 2 H W 194i1,9a'^ xi II,•nic•wtf - ;1 ,7 y,.,.r. :.i, t r 1. H I O 3nv A71 r---. U Pa U) P 1-I H In 7.rJ-T-! f l.., i o l 7 li[TJ•'T.d l --, f Of-•' +-r-•-•- n U [ + i:7eiy ,,, ',,,n •• -• lL':C jn:•agF.3tL t •• r. r. a 6 rr:r •{ ii-1X-t-7':': w.r +t _ - -: i IJ.ri:i.— q %• I l' / 11 r....-..l tY` .I ,711.0 ^ 4;, ` • O Q 1•Tr+Tr m,,,„1 I• '+'a5r E }, 7 L,'.' 1 I;_.T..r3^. wt eft'.:yv-_^,\:-.tea . n C> Q J al Z nv 1319; , - •.+19%4_4-7 •ii1... L L+_:Y s' ` . •, . ! •r,',-.11 -'i-fr-,+ •... i - 11' 1y i a %a.tai Z ..'. sa. A ./ ... T •_ .. I ' ry ""q" r.I I . ._ j u U Z W W J q T, '`.'T'Tap p a•! --ce•.-ate: I-, L--- J U a L+_S b u r t•I ' 3i1T•Vi-TT T T_ b Q O (!1 N -• 3"'^ ._' jai a+la7'..•• C*wr'+,•_y.y. 1r •Z•t•, -1,r1+lf ral• jrd•. t.t:lAi.n,! i1- ,K1•N D O If) 17 i ir, tt:s:... ---:/=T-r.N'-.f•V ., I,. t • • .•'4__.,st- Z J O W Ul yy •• l -_--. r''{.1 S and 1/3Na Y n Z 1 J 1 1 I, I r ?1 ! r T _ U F- I- o W I j ' eels e S 7.7+ fy0f J I lu•Iv,.--•7 fit: '.I r•nr-r• r `_ , tl' X X a' O O v jp7c jj . T.a a.,.ri•n rr-rrri4=z!1 3nv ce..z•hi iLair: 17 b T T ` [ .Irt r } ldJyss"• 4 Q fl W W (1 U U l I r .i Y; r Fw r. z.r _..v.. ,i t T!T T , .A :...,,;:,0'.;:-,i,:1 p:: i. i s r • ` 1 t 0 T2 FF_Ji ,a.- 6_iklwiagiz-1 t: •i C: S,bbO t rs-LJ ata 1 i„ (T''7-t-'' i„ J r d1,474.:l• T c:_,. .• r. 1,,,... ELEM5NT 1! Single Family 81 Commercial t i•:,i ::::. ' i-••i.: Mu Low DensityM: is • ,•::••:.:.••: ltl-Family Office / Office Pc i::::•,.. Asi • • • 111b:-..c.:: i ...•it, J111111 ! / •L ' .::.....•;:::.•:::::. Medium Density 0.0.0.0•III 4 H:!::: ::::: •••acWa°0°. Public/Quasi-Pul:Multi-Fam4 •000,:„)„,00....• 1- 1 Isriiii0il: Aimee animas, i ire 4•••7 iH• it -1 ! : -:-.y ,.. . '' 1::::::: Hi••••:::.., :'i ghens yi • Multi-Family Light Industrial 1 111111111111 ''''''' -' •s111 I . 114 1: • •`111°Recreationoi' l - Wia Heavy Industrial V - I.; j.W..... c.^...'..,. 1, ';_i•,i7;;..,.' : Greenbelt Manufacturing P;e"... iv. • L.....,- ‘..._ 1,... .. C.: e..••• c r.11 f.:•'-', • s'e5:6-. -.E%-• •: c:,.,..*:,,,.r,' c • •-k--,-. r-,./.- loaf ',..c.: ..',,....--':,--•.-2-":::-..•.--:;,..-::;-,.Y.:Tig..::::::: c.,,,'P'‘.',..c..`:.:-...s.:-.:..•:iii„,..--- •- :-.-..-. -„,t. i. Ai b../ itts_l_•:..,_- 7,....-s,,,, 7,, ,,-. -4.g.,-,::,....,. .-,..:;F,,,e.:4.....Z.• -.r,,,•7,:•.,-11111."-- . -.,.., , . 1983 Hu'•;- ''',"-I':; e ...,•,..-, G.: ,;:::.`..?", -, 7::•;:,c...-,-:".•::'-'.......^-7,-,' -t'oce. -='"- 1 ‘ , ION itg- 1 ,11.L 4... ' '''':' ,; ,' e., '' , e..,_.t-::•:- 6. j.:',•C. a57.10 INMMO, : • ..... 1Z''.. ' i '• t;' im 11111111 mtilik il . 0........•16-:._., ,.. 00c,000. 74!b. 407.NN, t -...A -k v.c,. ist• .0.000.00• ,_ i1 4_.n 4". A„••. l:.:17 e •1;:(.-•,.-.‘.;' c' Zc.' i•::.."7.-.;-:.•. C,„-,,7', z-c. LAKE 1 INM=MIN i.,.. .19, ; 00 ...•..../., i:. :.-.c.., , ss .0 ';iie.`".:::0i §81ft‘ _."•'.,- ..'.7'.: SHINGTON ammoMVOS ,111011'6.• , 3.. -..--• LO-1411117.1• --- 14' 111;:111°°rrileri.----1 in 0.0.0 0• ! 111111'.11 00000 AI, ,,,,,,,'Wile &$ 1111110•11 1,191H-1. Vt..:"•••"-f 14. ' 3:1 00 0 0• - - /VIVO liTelf_ii%,-ma 4 , I•1111 00.0r delt,e.„.11. ... t., 0 ~.. um,i . . 777.,...r7 , i-iiiii-iiiiitAMENDdeler1.t.::'::::;.::..• •,,,T.111OWII•AV' 1.1111474‘‘,"\->.•"... r..._..._ Mity%,,,;,...., ua_ b•. i 11.:Ai ---•7:11It).4: 7.1%... g..-- 1 0111; 0..... :--• . •••-• • • • • • • 46A........." ..:Aso i „,,„i, .. 101.1...., . " .tic,,°,*E',::. .••••••••••••••••••••••• efe :6:441 1i §4411.111"-----'11515••• ..%::-. 6 N L.....i 1i ifrillariiill ' t•• IIIIILI0 . •0000000000.li qOgogag%•11 •••••••• • • • ••• 0.' 4, 6 i 0......- i, c•0 00 0 000 000000irg'0O°g:ii 4, !isitivf••,••• ••••••_•: ••• ••••• • • ..111:4111 p,-,,7-1,-.--.1 _4toogogo130g.st•vi• .•••-• • • • 1 .0.000000 1., • 4, • , • • • NMI JA••• -01011 .. t11•`q?sisigil •••••••• ••••••• •••••••• • .\ NJ.0,. . . 610010,44„.. .k 1A°.(0'020°0go'c', i., • • • • • • it.1:•? g°Pig.. o_ • • • r " 'fB1 ••••••••• ••• Illi di. 1 ,,i1 eivpi ,•`-i•••••••IT _ _4 1 •••••••,,,.•• \\ de .00000 00. • • • i • • • _,‘ •• I" ,Alia •• .%ge.0. 1 bilk .i.,.........mt ..... .. ,,.,,,,,,, :,,,,,,,,,,,,::.,::111q°02.40g0:•• e • • '0,.:::• :asia • • • • • any 0 0 0 00 • • • ........... a 4 dr0o_oc,...o. _ _ _ . - 1 13 ,i, • • ,,NIIP9)••0°.0:. :::i,:i'ii:isilil:i::::i:Eg.':.::::. a 11 -11.....:: \ k1: •4:,,,ggg,o,ggg:t-•,-,;0;0;.Amon IC:. c -- ./ ilt. 111-- t-----_. ,-- as. ...; VS .000%,Dooe000c,,T. •0000. #_...._ _-.4.;;;;;n. 000.00.0: 007:0::00:000000:00: 0:00:00:.: g.--. 7::...11 ...„0_,...coot,000.00i. .0g. ,... ..•80.8000.000.0c,•,....„..,,..„-","....:'' 91:•:, ell‘ °MI. ...0.; ii• .'2, .....::..11,......:::..::.....:.::i.. .. :•.i..:i:.i...ii...:•,IIT: 0000°0;000;0010100;00:1000:.01°000; 0; , 116:.:''.: H:::.:127,77: 111:111.:11.4131. 1. 1." 112':.: 1'..... 1::.!:.:.:: lir& %gg:3:3.%ggge'0;1.,: ,:ige Elliptifis!:, 00 mi :02.g.:0,f5,0gogogogoo .$1„..0.7„), III,mi 000000000.0?0.; ..) EV nrEramorr.• , ,1FN 1'14 mi. r". ''.. 17'''' r It .12141461e11:144ti Inlin ?ockeloVo"o°0.fecO°o°oVoVoZ• 1 :. •::,1.:. A I(14' --"' - 0-°°°0°0°0°0 00000000 0IfiLigeiGitm,111419b. Allilmill...rit "-1117i 4,,1111(,` II 0.00000\im:i: ,.00,..,00.000000000. 0;00.00000.000000000000000000000000., I: . il.:. i.i Atomiwzruvux__J...00.00.00.1 lizir:„.„,,..4_,Nwilip.ro. /01/\.,,,,,,.. \'';' r. r., 0. 0° 00700:00' I:: '::•:::,:::•::::::•::::,,:::::::::::,:::i:::i::!:::: ..o._ 77., 0.0 0 „. 00.000000000:0000:00000., .4 IL:. •.•..:::.:::..::.5.12::::,,,,,:,,,,„go:og., 0, 0 ,...,...cia,,..1,., 41. . ... .. 2..„,.., i'::i;:i.::i.::i.:::.::::::::': i:',....,(.0_093:0°00:0:00°0F. 4::,..,) •..::::...:.".. Inns Olt°°.'ciggggggg itinilisiims..ylr' gr.) /: •'0,11::_,..\ • 1111 :::"-,. ' ,: K:i*i:::::::::::: .,',(17. • 0°0°.. . :: :::•.•: -II 4?i• maws'soak •.0.0.0.0 0 II •IMO 011111111111Pe)• •.0.!,/ ir (,, g ( :::::::::::: :i0 ,t,-,,..,.../..,-...ifin•-•••• 10.00"1"1"V'°0-•, i,;.../46i.‘. 41,41k -111` ' -,...‹. .: ::li , '::i: :i::::!-::::::::- ,`1 of..,4'.. .,4,,i, fr.,'•;',,•,,,...-."-•.,_-- :.:::••••:'•-:::::•.11---------aiim•••••••;raii rt 0..• yria. i,:: •:.::::::::::::::::::::• . , ,-;,›;(,)..,„r.s.,'s',7•:,s;E.th•l•j-, .•.•::::::::•:•:•1•:•: ' NO 1:::14111:11:111•111....° .-'• ..i . ---,leak••O:'al .''''.*. ' ...''''''...",/,;ri 4:-:;4;-Q 115,, .)-;•'.) 2:‘7.' c',''':t .1::.:•: .:*::.: 1102•!!!!!!!!!!!s.E.ITIZIPM.P.e!!!!!!!!". ' ''^f'1,',..71.11b, -4i.;;;;,''',..'45??,:•,,,::!-(1)•,,..,.;'',..,.. . . t..7‘..ti:./;.`.••,?-;.•;:;5:-4:;•,:--'4n1•L, ...•?*::1:.:::.:. 1 ig.magi Wilunismov ova 11•11611111111•11•111 pin r.4 1,:.,....,, .,..,„‘„ . ,,... _, , ,.,... r ,... _, _ , ,..., ,,..,..,. ,_ cfM° all •:MA:: i.,`.''•,q.` ?• II ...V' '(4'5 '1,>•b'''-',1..!•%'?'?‘"•'. ;:,$•:•'"; j •(:' .. -!! MI VW' 111111111 , • 11:11:91‘,..,•, a','.., , -./.,•;,,,,,,,5, Anl!,, .•:.171M-11.1%14.711" 1 • 0 ."gi It 1 . .1).f ..1.3.1.0 '. 4.;?'.1.' ri• • 4- • •-•- ' :',Alta....- 4 umos.-.. • ..,;.,„, _ masmil: :§-:"- .401..op • - - - • ow_ ii. c •ret..;..,., _ „...,.,-,..,_ --.-..si• • A/ a. to ' ..-", _.,, .., t , A. '' .{;;,$;,(1i..‘ c' ''.'-.' c 'r%.-..;''sves.Is hl c5. •-. - -czMEV1111111,' -.:5::--::,,-•:,1c5f-..::,. .1 0444•...."4:',,. • :?....9,.;,,q1., '*gay.- ,., ' a 4'.11. "PA0 'iv Ye" ';`•., .:-re; :•,:- Ililm. MI .::::::‘,:••:.:,:.'::::,::::'..,... 0:.",",,...,,,,".1; pf i 6.,,,,,..„>.., :.- e- --- 7.7--,. .,„ I.,t.,I5.....,,,,,,, ,,,, . :,.-„,.. ,.., • .::,,.,:.::.„,,:,,,::::.......: if 1 y4....);-n..,•?.1:,,,,P ...e?.... x.,; 1",,:.).villA.,\ , --..,._ -.Rave: 1 00( • ; .. . -.•- oil mu, .i,i-::::-::::.::-.:,....,::.::tz.,,, „,ip‘.1/1% Ilk 6:lOr'.;4.1.?4 p•.;01.-..,.‘'..1!;?5.7.3..•......,:i.t.:,, e:r i• • ..,,,,:r..;:::,•;,::::-...,.., .:-•fill V i ril$,:ics•k(V•!'tN tC'''In!.P:47 D. m...T..... i'''S.ji••4; itWeL4f4.*".-ill..0•. t.0000.00:000000:6i;*• :}"-,•:`; ',,,,fg,(.?5`.6).7,,;:q.: , N --. Ct,. i-'6rc r:fi•1\' ''•\. ,.‘ 4 ..'cl`'el.:-. .,'. .ti:g : tjj Ai?c,,...;•L'?.., • I'"(-4 O° MOMPAMOM /4/ 1 3- .....;te.).f‘'' e'it!..CA',gi,':('-',Q;.,'•T..',11,'tk.';'!:: -i---- 534` 5 °• 0....; II ,10.644i., . -;,fT,iy:::!7‘,,0:r,'",;XIV".•i,•ri,l...,:17i.j-li'.V..i-1:',.0, 3:,.P:,9:.,:!, T.,, c•. .2 0.. j sesp-:....• 5:,,,b..!,... .,,.,. . ..,• ..1„,, ,. , ., )1,„.V.‘,, `t ,..)•v.,.,, 43.,.,• ,.N. o•-•,..11 0 61 A'-•' ',..C?.. 41-1 t) ' •-•' ' i • ' Lt.•'44' ‘'"- Z' •.5•' ' 4 gorg. fr..- tl....... 14 8 , i ..0:.:*:.:.:. '''''.LI>" .0'''', ;'.:'."‘•:,..',`,Y.ii. i,..0 o.0 fl'••i,•‘rt's'.ell '0"''.,C3'fi,,11i!,7U!,.•..:., ; , e "- --f N ..:':-i,:-::::: :::::::.. • t '.•s.5: , '' 'ANo:,< s ... a 0 .w. 1, !.. , _.....,_,I.•k!ik,'-At!.s;,-, k 4 • II',• '.' •°o°o°o°o°o'o '''.4.' \i ''.'::::':::':'::::',.'N-::::‘')':,'6('''.\••' ,' 711iiii.:ii!:iii:.,:i:::':ii:i.40- 661" , •„ 0000.0.001- A: n•••:- ' '1...3,.;,.1.3, .. • \H :•:••_. );.•• ''' fx'- ik' • / .:,,, Or 11111TINTI.... .- ,,,sk 0•••••••••,.,•. .t...t.,,,: .‘,.,„.;,,i;5,1,;,,,,,--. 1, ,,.... 1:..i 0. 0„..o., 000 ,,„.\0.c,,,, . p 4' 'a • VII‘,., r \ 4. 1 -,:,!..,.4di IT -- - •• - ' .. .•••••, 7 I I ai 1 1 I r 1 ts,.. 1 7 I _ f3AL.L- F"'Ea, ANN/ I St,% 111P<IWI 1_-%1-1141 eAJrrS i 0 , 1i . vv..,,( I*igALL i, 1I . L --/ op , .. . -';, Lisi.'it.v...' 1 0 GFN40 51:40 1 FLAY(turf. r 7 t115K-FK i'-•, 4., . PAKKII-16, Asy:, aqi.%• 1 1 P,11.644, FMK riA-T - / /,, ,'.. r r- : - lill•-•--' . — - • . • / '.' t !:Iir' ..;!.7 frilgt.- P1'"'' /'/ , • i . 1444,..',-; k t, _ .,.- / ..,• 1 ,t. 4tr '.--4....4416, ‘ pit-A , , . I AREA • • E wila-1 14E44 WoRK --- // y r Ci.17/... 1 i I 1 i I t.. /Y.----- //,'-''' 7 1' 1 ,011;• 1 J • se. e- 1 ; i 1 • I -VVVVVV- 4 e 5I-r- rL,A.L1 „.. v" .,... ....- A '.-.020•-•Ca/61-. REVIEWING DEPARTMENT/D SION : i ZE APPROVED El APPROVED WITH CONDITIONS Ei NOT APPROVED i2 yiDeA ZcQ(.1 ulIT,a ISo' Feet of s.neuc,cuae POO--oRt--)1 UC3L-tc Woz < s WIL-L. 1 i0STAc-t. c o0 CASs "RoAc4 RR+Ce +Uc -Sco - u1\^-p \c SLR IN, 0 1'11 S W I L 1- DATE : - ` _ Y5 - SIGNATURE OF I CTC AUTHORIZED REPRESENTATIVE REVISION 5/1992 REVIEWING DEPARTMENT/DIVISION : El- PROVED 1] APPROVED WITH CONDITIONS Ei NOT APPROVED Jef-7-1e440 dAitifttjA,-- -7 DATE : L/T AS r r, OF DIAEC TNTSIGTORl ED REPRESENTATIVE REVISION 5/1982 REVIEWING DEPARTMENT/DIVISION : eL_ APPROVED El APPROVED WITH CONDITIONS El NOT APPROVED U 0 Lv4f DATE r' Ati OF Ojk OR "'T' J REPRESENTATIVE REVIEWING DEPARTMENT/DIVISI( 7"-7L/Ty ,jV6 =4',E/AJG, EAPPROVED Eil APPROVED WITH CONDITIONS 0 NOT APPROVED 11ILITY APPIIIAL IISIE{I T1 3-'7- gS CITE CUM MUM • MI A/O UK CMUZ 1t1 IMI • IE1 I AID isus irMui11 CUM " M1E1 A/D MU 1011111 /1 twlw • KM NO hill 1111111811101T NU MU Mill u o 4 Mk MUM as MU • uu o_Np MUM INTER Plu B/Es , PPSS IP SEREI nM A/Q rii I FIRE MUST MUM II FIRE IFPT. y-ES F11F FL1N ANALYSIS Air _ 1 I c‘947 DATE : 3 — /3 0..c" SIGNATU OF DIRECT'' T';ORIZED REPRESENTATIVE REVISION 5/1982 REVIEWI G DEPARTMENT/DIVISION ; I Fi c z 1 n) t F l/1/ APPROVER APPROVED WITH CONDITIONS NOT APPROVED AD PHO 1)(ekz-.S ' )g CC.Z1(F z(/" 6: -1,-244-D --, e'?i -- / DATE : -7/i/.0 SIGNATURE OF .DIRECTOR 0 THORIZED REPRESENTATIVE REVISION 5/1982 REVIEWING DEPARTMENT/DIVISION ; 7 4........_ez... TLI APPROVED APPROVED WITH CONDITIONS El NOT APPROVED c-- ----.. 172 -----‘1----- j 2. DATE : SIGNATURE OF DIRECTOR "D AUTHORIZED REPRESENTATIVE REVIEWING DEPARTMENT/D . SION : PROVED El APPROVED WITH CONDITIONS NOT APPROVED L.I DATE ; SIGNATU OF DIREC ` AUTHORIZED REPRESENTATIVE REVISION 5/1982 REVIEWING DEPARTMENT/DIVISION : ErAPPROVED ri APPROVED WITH CONDITIONS ri NOT APPROVED A, IA DATE: ///‘71,t E LOFFtCT-0 ED REPRESENTATIVE REVISION 5/1982 0629N CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE ENVIRONMENTAL CHECKLIST NO.: ECF-028-85 APPLICATION NO(s).: SA-020-85, SM-001-85 DESCRIPTION OF PROPOSAL: Application for site plan approval and for Substantial Shoreline Development permit to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio and the demolition of the old picnic shelter. PROPONE NT: City of Renton, Parks & Recreation Department LOCATIOI'J OF PROPOSAL: Located along the north bank of the Cedar River in Liberty Park, between the streets of Bronson Way North and Houser Way North. LEAD AGENCY: City of Renton, Building and Zoning Department. The lead agency for this proposal has determined that it does not have a probable sign f=giant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2Xc). This decision was made after review of a completed environmental checklist and other Information on file with the lead agency. This inforn cation is available to the public on request. There is no comment period for this DNS Responsible Official: Environmental Review Committee City of Renton 200 Mill Avenue South, Renton, WA 98055 Phone: 235-2550 APPEAL: You may appeal this determination in writing to the City of Renton Hearing Examiner no later than March 25, 1985. You should be prepared to make specific factual objections. Contact City of Renton, Building aryl Zoning Department to read or ask about the procedures for SEPA appeals. DATE OF DECISION: March 6. 1985 PUBLICATION DATE: March 11. 1985 11 A1&.r.' onald G. t le son rry M. •; nger Building and Zoning Director Policy Deve •pmen Director Richard C. -ioughton Public Works Director OF R4 ,4 411 z BUILDING & ZONING DEPARTMENT RONALD G. NELSON — DIRECTOR l,MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540 90 co- 0, 9g7. 0 SEP BARBARA Y. SHINPOCH MAYOR March 26, 1985 Mr. John 'Nebley, Director Parks and Recreation Department 200 Mill /.venue South Renton, WA 98055 Re: Application for site plan approval, file SA-020-85, and for Substantial Shoreline Development permit, file SM-001-85, to allow the construction of a 28 foot wide he<agonal picnic shelter including a paved picnic patio and the demolition of the old picnic shelter; located along the north bank of the Cedar River in Liberty Park, be:ween the streets of Bronson Way North and Houser Way North. Dear Mr. Berg: The City of Renton Building and Zoning Department formally accepted the above mentioned application on February 26, 2985. A public hearing before the City of Renton Land Use Hearing Examiner has been scheduled for April 2, 1985. The public hearing commences at 9:00 a.m. in the Council Chambers on the second floor of City Hall. The appl cant or representative(s) of the applicant is required to be present at the public hearing. A copy of the staff report will be mailed to you before the hearing. If you have any quest ions, piL.ase call the Building and Zoning Department at 235-2550. Sincerely, ereltare..q. Roger J. Blaylock Zoning A dministrator RJB:JMM:cl 1425Z OF J?4 BUILDING & ZONING DEPARTMENT r RONALD G. NELSON - DIRECTOR a o 0 r MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540 90 co- 0, 9gTED SEP C- BARBARA Y. SHINPOCH MAYOR March 26, 1985 Mr. Randy L. Berg Parks and Recreation Department 200 Mill Avenue South Renton, WA 98055 Re: Application for site plan approval, file SA-020-85, and for Substantial Shoreline Development permit, file SM-001-85, to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio and the demolition of the old picnic shelter; located along the north bank of the Cedar River in Liberty Park, between the streets of Bronson Way North and Houser Way North. Dear Mr. Berg: The City of Renton Building and Zoning Department formally accepted the above mentioned application on February 26, 2985. A public hearing before the City of Renton Land Use Hearing Examiner has been scheduled for April 2, 1985. The public hearing commenoes at 9:00 a.m. in the Council Chambers on the second floor of City Hall. The app icant or representative(s) of the applicant is required to be present at the public hearing. A copy of t'he staff report will be mailed to you before the hearing. If you have any questions, please. call the Building and Zoning Department at 235-2550. Sincerely, 812 1 ' 4:111.4 Roger J. Blaylock Zoning Administrator RJB:JNM:cl 1425Z NOTICE OF PUBLIC HEARING RENTON HEARING EXAMINER RENTON, WASHINGTON A PUBLIC HEARING WILL BE HELD BY THE RENTON HEARING EXAMINER AT HIS REGULAR MEETING IN 1 HE COUNCIL CHAMBERS ON THE SECOND FLOOR OF CITY HALL, RENTON, WASHINGTON ON APRIL 2, 1985, AT 9:00 A.M. TO CONSIDER THE FOLLOWING PETITIONS: RIC HARD C. SHORE Application to rezone approximately 1.91 acres of property from G-1 to R-2 and R-3 for future multi-family development, file R-015-85; located on the east side of Grant Avenue South at 1626 Grant Avenue South. CITY OF RENTON, PARKS & RECREATION DEPARTMENT Application for site plan approval, file SA-020-85, and for Substantial Shcreline Development permit, file SM-001-85, to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio and the demolition of the old picnic shelter; located along the north bank of the Cedar River in Liberty Park, between the streets of Bronson Way No-th and Houser Way North. Legal des,:riptions of the files noted above are on file in the Renton Building and Zoning Departme nt. ALL INTI:RESTED PERSONS TO SAID PETITIONS ARE INVITED TO BE PRESENT AT THE PUB_IC HEARING ON APRIL 2, 1985, AT 9:00 A.M. TO EXPRESS THEIR OPINIONS. PUBLISH=D : March 22, 1985 Ronald G. Nelson Building and Zoning Director CERTIFICAT1ON I, JEANETTE SAMEK-McKAGUE, HEREBY CERTIFY THAT THREE COPIES OF THE ABOVE DOCUMENTS WERE POSTED BY ME IN THREE CONSPICUOUS PLACES ON THE PROPERTY DESCRIBED ABOVE AS PRESCRIBED BY LAW. ATTEST: Subscribed and sworn to before me, a Notary Fublic, in and for the State of Washington residing in , ,, (,t, on the 20th day of March, 1985. SIGNED: C.,1 .k- I OF IRA. p J o P t t) SEPTEMQ'. City of Renton Land Use Hearing Examiner will hold a PUBLIC HEARING in CITY COUNCIL CHAMBERS , CITY HALL ON APRIIL 2, 1985 BEGINNING AT 9:00 A.M. P.M. CONCERNING: SA-020-85, SM-0O1-85 El REZONE From To I I SPECIAL / CONDITIONAL USE PERMIT To x SITE APPROVAL SHORT PLAT/SUBDIVISION of Lots PLANNED UNIT DEVELOPMENT VARIANCE FROM__ Imo! SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT GENERAL LOCATION AND/OR ADDRESS: LOCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY MJ TH AND HOUSER WAY NORTH, LEGAL DESCRIPTION ON FILE IN THE RENTON BUILDING & ZONING DEPARTMENT. ENVIRONMENTAL DECLARATION SIGNIFICANT :i NON—SIGNIFICANT FOia FURTHER INFORMATION CALL. THE CITY OF RENTON BUILDING&ZONING DEPARTMENT 235-2550 F THIS NOTICE NOT TO BE REMOVED yvrir11014T RENT BUILDING & ZONING DEPI MENT DEVELOPMENT APPLICATION REVIEW SHEET ECF - 028 _ 85 APPLICATION NO(S) :SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (SUB. SHORELINE DEV. PERMIT) PROPONENT : CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE : NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE )EVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER IN;LUDING A PAVED PICNIC PATIO AND THE DEMOLITION OF VE OLD PICNIC SHELTER. LOCATION : _OCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. TO : El PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 3/6/85 Ej ENGINEERING DIVISION TF;AFFIC ENG . DIVISION SCHEDULED HEARING DATE : trILITIES ENG . DIVISION El FIRE PI•,EVENTION BUREAU El PARKS 2, RECREATION DEPARTMENT BUILDING & ZONING DEPARTMENT POLICE DEPARTMENT POLICY DEVELOPMENT DEPARTMENT El OTHERS : COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 : 00 P .M , ON MARCH 5, 1985 REVIEWING DEPARTMENT/DIVISION : I E APPROVED APPROVED WITH CONDITIONS NOT APPROVED 1, Ib N / 1.D L1A T cjjip c tijITi. ISo' FEEL S 1\Q-0-0RP c u_bo..<s our L JH 1 i.1STAc.I.D o QcC Ss op,c Piz\Sfc.c_e_y\A- pu p co sc. J P S W I c _ DATE : - - IC-- SIGNATURE OF I CT( AUTHORIZED REPRESENTATIVE ocu.C,f1Y R/1 QQ 1 RENT`"" BUILDING & ZONING DEN MENT DEVELOPMENT APPLICATION REVIEW SHEET CITY OF RENTON ECF - 028 _ 85 B 28 1985 POLICY APPLICATION NO(S) SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (Sl "`Ai T_II EPTEV. PERMIT) PROPONENT ; CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE ; NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER INCLUDING A PAVED PICNIC PATIO AND THE DEMOLITION OF HE OLD PICNIC SHELTER. LOCATION ; LCCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF E.RONSON WAY NORTH AND HOUSER WAY NORTH. TO : El PUBLIC V!ORKS DEPARTMENT SCHEDULED ERC DATE ; 3/6/85 ENGINEERING DIVISION ri TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE : l ] UTILITIES ENG , DIVISION U FIRE PREVENTION BUREAU PARKS & RECREATION DEPARTMENT BUILDIN3 & ZONING DEPARTMENT El POLICE DEPARTMENT El POLICY DEVELOPMENT DEPARTMENT Ell OTHERS ; COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 : 00 P ,M, ON MARCH 5, 1985 REVIEWING DEPARTMENT/DIVISION ; LI- PVROVED E APPROVED WITH CONDITIONS NOT APPROVED 6-x-te64ze DATE : LF //e.s sic r<c OF DIRECTOR'; i " 'TLV 7.,7 ) REPRESENTATIVE l2EVl'EON 5/1982 RENT BUILDING & ZONING DEN INDENT 4 DEVELOPMENT APPLICATION REVIEW SHEET ECF - 028 _ 85 APPLICATION NO(S) :SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (SUB. SHORELINE DEV. PERMIT) PROPONENT : CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE : NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER INCLUDING A PAVED PICNIC PATIO AND THE DEMOLITION OF HE OLD PICNIC SHELTER. LOCATION : LOCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. TO : 0 PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 3/6/85 a ENGINEERING DIVISION ri TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE : El UTILITIES ENG , DIVISION 0 FIRE PREVENTION BUREAU E] PARKS & RECREATION DEPARTMENT BUILDING & ZONING DEPARTMENT El POLICE DEPARTMENT E POLICY DEVELOPMENT DEPARTMENT El OTHERS :. COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 : 00 P ,M, ON MARCH 5, 1985 REVIEWING DEFARTMENT/DIVISION ; eL EAPPROVE: El APPROVED WITH CONDITIONS El NOT APPROVED c;5./-727- iriVe e DATE' rtL OF •• v OPOR 4"T.,, REPRESENTATIVE DCVI4tAY 14/1ORO RENT BUILDING & ZONING DEP4 MENT DEVELOPMENT APPLICATION REVIEW SHEET ECF - 028 _ 85 APPLICATION II0(S) :SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (SUB. SHORELINE DEV. PERMIT) PROPONENT : _ CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE : NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER INC_UDING A PAVED PICNIC PATIO AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION : LOCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. TO : Ei PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 3/6/85 0 ENGINEERING DIVISION TRPFFIC ENG . DIVISION SCHEDULED HEARING DATE : El UTILITIES ENG . DIVISION l I FIRE PREVENTION BUREAU El PARKS & RECREATION DEPARTMENT 0 BUILDING & ZONING DEPARTMENT 0 POLICE DEPARTMENT E POLICY DEVELOPMENT DEPARTMENT El OTHERS :_ COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 :00 P .M. ON MARCH 5, 1985 REVIEWING DEPARTMENT/DIVISION : T/L/Ty ,,/ii/A-4.,e/zv Er APPROVED El APPROVED WITH CONDITIONS Ei NOT APPROVED I ITIiITT APPROVAL SMUT it gs LATE COMM AIMIT • WITEI p UTE CMS AIIUNEIT - SEVEN AID STSTErI IMPRINT Cann • 1LATEI Ay() , STSTEI IEIEUNREIT CNAHE • SEIEI A/D SPECIAL ASSEU*IT il11 CLASH • PATER u p SPECIAL MOO OT MEN CIARIE • Still A/0 APPI11E1 HATER PUI Es AP MIDI SEWER PLAN APPRIEEI FIRE HYDRANT LOCATIONS IT FIRE AEPT. y/ S FIRE FLOW ANALYSIS AZD 017 DATE :_ SIGNATUR OF DIRECTC T''ORIZED REPRESENTATIVE RENT BUILDING & ZONING DEP 'WENT DEVELOPMENT APPLICATION REVIEW SHEET ECF — 028 — 85 APPLICATION NO(S) :SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (SUB. SHORELINE DEV. PERMIT) PROPONENT : CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITi_E : NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER INCLUDING A PAVED PICNIC PATIO AND THE DEMOLITION OF VE OLD PICNIC SHELTER. LOCATION : LOCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. TO : Eil PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 3/6/85 0 ENGINEERING DIVISION 0 TRAFFIC ENG . DIVISION SCHEDULED HEARING DATE : UTILITIES ENG . DIVISION 0 FIRE PREVENTION BUREAU fl PARKS & RECREATION DEPARTMENT 0 BUILDINS & ZONING DEPARTMENT 0 POLICE DEPARTMENT E POLICY DEVELOPMENT DEPARTMENT El OTHERS COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 : 00 P .M. ON MARCH 5, 1985 REVIEWING DEFARTMENT/DIVISION ; 7'&/J f t= < <t_ sec- ) n) t P, //'Y 12 APPROVEL El APPROVED WITH CONDITIONS El NOT APPROVED Air Fro 1,(& 5 it . -7,„_.jr".3r----) 19ri.„—*.L1-).__, S--ef DATE :3 SIGNAT REOF DIRECTOR 0 TUCTHORIZEDREPRESENTATIVE RENT BUILDING & ZONING DEP4 MENT DEVELOPMENT APPLICATION REVIEW SHEET ECF - 028 _ 85 APPLICATION NO(S) :SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (SUB. SHORELINE DEV. PERMIT) PROPONENT : CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE : NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER INCLUDING A PAVED PICNIC PATIO AND THE DEMOLITION OF VE OLD PICNIC SHELTER. LOCATION : LOCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. TO : PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE : 3/6/85 0 ENGINEERING DIVISION TF:AFFIC ENG , DIVISION SCHEDULED HEARING DATE : DUI ENG , DIVISION 1 FIRE PFEVENTION BUREAU 0 PARKS 8 RECREATION DEPARTMENT E BUILDING & ZONING DEPARTMENT E POLICE DEPARTMENT POLICY DEVELOPMENT DEPARTMENT El OTHERS : COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 : 00 P .M. ON MARCH 5, 1985 REVIEWING DEPARTMENT/DIVISION : APPROVEI; I: APPROVED WITH CONDITIONS 0 NOT APPROVED DATE : SIGNATURE OF DIRECTOR --' AUTHORIZED REPRESENTATIVE oC\/ICIAY R /1A09 RENT BUILDING & ZONING DEN MENT DEVELOPMENT APPLICATION REVIEW SHEET ECF — 028 _ 85 APPLICATION NO(S) :SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (SUB. SHORELINE DEV. PERMIT) PROPONENT : CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE ; NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER INCLUDING A PAVED PICNIC PATIO AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION : LOCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. TO : 0 PUBLIC W)RKS DEPARTMENT SCHEDULED ERC DATE : 3/6/85 0 ENGINEERING DIVISION I JTRAFFIC ENG , DIVISION SCHEDULED HEARING DATE : UTILITIES ENG , DIVISION FIRE PREVENTION BUREAU 0 PARKS & RECREATION DEPARTMENT BUILDING & ZONING DEPARTMENT 0 POLICE DLPARTMENT El POLICY DEVELOPMENT DEPARTMENT El OTHERS :_ COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 : 00 P .M, ON MARCH 5, 1985 REVIEWING DEPARTMENT/DIVISION ; EFAPPROVED 0 APPROVED WITH CONDITIONS NOT APPROVED DATE : SIGNATU OF BIREC e AUTHORIZED REPRESENTATIVE RFVM!QN S/1982 RENT BUILDING & ZONING DEP4 MENT DEVELOPMENT APPLICATION REVIEW SHEET ECF - 028 .. 85 APPLICATION NO(S) :SA-020-85 (SITE PLAN APPROVAL) , SM-001-85 (SUB. SHORELINE DEV. PERMIT) PROPONENT : CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE : NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER INCLUDING A PAVED PICNIC PATIO AND THE DEMOLITION OF 1,HE OLD PICNIC SHELTER. LOCATION : LOCATED ALONG THE NORTH BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. TO : 0 PUBLIC 4ORKS DEPARTMENT SCHEDULED ERC DATE : 3/6/85 EN3INEERING DIVISION TR,AFFIC ENG , DIVISION SCHEDULED HEARING DATE : UT :LITIES ENG , DIVISION 0 FIRE PREVENTION BUREAU El PARKS & RECREATION DEPARTMENT Ei BUILDING & ZONING DEPARTMENT 11 POLICE DEPARTMENT El POLICY DEVELOPMENT DEPARTMENT OTHERS :_ COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT BY 5 : 00 P ,M, ON MARCH 5, 1985 REVIEWING DEPARTMENT/DIVISION : APPROVED El APPROVED WITH CONDITIONS 0 NOT APPROVED DATE : /27Wds./ a r+- TARE0RCTO ED RE RESENTATIVE Q Ctilel 1M R/1Q119 NOTICE ENVIRONMENTAL DECLARATION APPLICATION NO. SA-O20-85, SM-1101-85, ECF-028-85 PROPOSED ACTION APPLICTION FOIE PLAN APPROVAL AND FOR SHR.STANTIA] SHORFI INF DFVFI OPMFNT PFRMTT TO Al LOW THE CONSTRUCTION OF A 23' WIDE HEXAGONAL PICNIC SHFI TFR I NCI I ID I NG A PAVED PATIO ANILTHF DEMOLITION OF OLDS HELTER. GENERAL LOCATION AND OR ADDRESS LOCATED ALONG T-E NORT- 3ANK OF THE FDAR RIVER iN IIRFRTY PARK) BETWEEN THE STRF S OF BRONSON WAY NORTH AND HOI ISFR WAY NORTH. POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION. THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE [ E.R.C. ] HAS DETERMINED THAT THE PROPOSED ACTION EJDOES ID ES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE ENVIRONMENT. AN ENVIRONMENTAL IMPACT STATEMENT DWILL WILL NOT BE REQUIRED. AN APPEAL OF THE ABOVE DETERMINATION MAY BE FILED WITH THE RENTON HEARING EXAMINER BY 5:00 P.M., MARCH 25, 1985 FOR FURTHER INFORMATION CONTACT THE CITY OF RENTDN BUILDING & ZONING DEPARTMENT 235-2550 DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION I 0629N CITY OF RENTON DETERMINATION OF NON-SIGNIFICANCE ENVIRONMENTAL CHECKLIST NO.: ECF-028-85 APPLICATION NO(s).: SA-020-85, SM-001-85 DESCRIPTION OF PROPOSAL: Application for site plan approval and for Substantial Shoreline Development permit to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio and the demolition of the old picnic shelter. PROPONENT: City of Renton, Parks & Recreation Department LOCATION OF PROPOSAL: Located along the north bank of the Cedar River in Liberty Park, between the streets of Bronson Way North and Houser Way North. LEAD AGENCY: City of Renton, Building and Zoning Department. The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21 C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS Responsibl: Official: Environmental Review Committee City of Renton 200 Mill Avenue South, Renton, WA 98055 Phone: 235-2550 APPEAL: You may appeal this determination in writing to the City of Renton Hearing Examiner no later than March 25, 1985. You shoulj be prepared to make specific factual objections. Contact City of Renton, Building and Zoning Department to read or ask about the procedures for SEPA appeals. DATE OF DECISION: March 6, 1985 PUBLICA' ION DATE: March 11, 1985 onald G. Ne son PlaitM. 3 nger 111 Building aid Zoning Director Policy Deve •pmen Director Richard C. Houghton Public Works Director 0628N NOTICE OF ENVIRONMENTAL DETERMINATION ENVIRONMENTAL REVIEW COMMITTEE RENTON, WASHINGTON The Environmental Review Committee (ERC) has issued a declaration of non-significance for the following projects: RICHARD C. SHORE (ECF-022-85) Application to rezone approximately 1.91 acres of property from G-1 to R-2 and R-3 for future multi-family development, file R-015-85; located on the east side of Grant Avenue South at 1626 Grant Avenue South. CITY OF RENTON PARKS & RECREATION DEPARTMENT (ECF-028-85) Application for site plan approval, file SA-020-85, and for Substantial Shoreline Development permit to allow the construction of a 28 foot wide he:<agonal picnic shelter including a paved picnic patio and the demolition of the old picnic shelter, file SM-001-85; located along the north bank of the Cedar River in Liberty Park, between the streets of Bronson Way North and Houser Way North. Further nformation regarding this action is available in the Building and Zoning Departm€nt, Municipal Building, Renton, Washington, 235-2550. Any appeal of ERC action mist be filed with the City of Renton Hearing Examiner by March 25, 1985. Published: March 11, 1985 UbLiIV E ONMENTAL REVIEW COMMIT TE- AGENDA MARCH 6, 1985 THIRD FL DOR CONFERENCE ROOM: COMMENCING AT 10:00 A.M. PENDING: ECF-009-35 TOM BARR (ROSA REZONE) R-009-85 ECF-119-34 MOUNT OLIVET CEMETERY COMPANY, INC. SP-116-8z OLD BUSI\JESS: ECF-022-35 RICHARD C. SHORE R-015-85 Application to rezone approximately 1.91 acres of property from G-1 to R-2 and R-3 for future multi-family development; located on the east side of Grant Avenue South at 1626 Grant Avenue South. NEW BUS:NESS: ECF-026-85 PUGET SOUND POWER & LIGHT COMPANY SME-003-85 METRO LOOP, TALBOT-O'BRIEN 115KV LINE. Application for Shoreline Management Exemption permit to allow the construction of a 115 KV power line. The proposed power line will extend from near the intersection of Powell Avenue S.W. and S.W. 10th Street for approximately 1,700 feet to the METRO Substation near the intersection of Monster Road S.W. and S.W. Grady Way. ECF-027-85 DR. W. EUGENE BRAIN CU-019-E5 Application for conditional use permit to allow the construction of a orthodontic clinic having 4,677 square feet of area on two floors; located on the west side_of Talbot Road South at the 3900 block. t ECF-028- 85 CITY OF RENTON, PARKS & RECREATION DEPARTMENT SA-020-85 Application for site plan approval and for Substantial Shoreline SM-001-E 5 Development permit to allow the construction of a 28 foot wide hexagonal picnic shelter including a paved picnic patio and the demolition of the old picnic shelter; located along the north bank of the Cedar River in Liberty Park, between the streets of Bronson Way North and Houser Way North. CORRESPONDENCE: ECF-018 -85 DIANA J. PEFFER R-012-8`- Letter from Diana J. Peffer to ERC regarding wildlife at site of SP-013-E5 Valley Office and Industrial Park. (Southwest corner of East Valley Road and S.W. 19th Street.) RONMENTAL CHECKLIST REVIEW SH 1 REVIEWING DEPARTMENT: DATE CIR;ULATED: FEBRUARY 27, 1985 COMMENTS DUE: MARCH 5, 1985 ECF - 028 _ 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL) , SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 2.8 FOOT WIDE HEXAGONAL PICNIC SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE AREA: 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE INADEQUATE 1) Ea1 th 2) All t/ 3) Water 4) Plants 5) Animals 6) Energy and Natural Resources 7) Environmental Health 8) Land and Shoreline Use 9) Housing 10) Aesthetics 11) Lig it and Glare 12) Recreation 13) Historic and Cultural Preservation 14) Traisportation 15) Public Services L 16) Utilities COMMENTS: RECOMMENDATION: 1,71 DNS \ f--1 MITIGATED DNS fl EIS REVIEWED BY xS 7,3TITLE: DATE:3/cP/e--- FORM #14 RONMENTAL CHECKLIST REVIEW SHI REVIEWING DEPARTMENT: I 1 4 DATE CIRCULATED: FEBRUARY 27, 1985 COMMENTS DUE: MARCH 5, 1985 ECF - 023 _ 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL) , SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC 'SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE AREA: 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE INADEQUATE 1) Earth 2) Al:' 3) Wa%er 4) Plants 5) An _mals 6) Energy and Natural Resources 7) Environmental Health 8) Land and Shoreline Use 9) Housing 10) Ae5 thetics 11) Licht and Glare 12) Recreation 13) Historic and Cultural Preservation 14) Transportation 15) Put lic Services _ C- 16) Utilities v COMMENTS: RECOMMENDATION: ir7f DNS IP\ n MITIGATED DNS I EIS REVIEWED BY: DATE: _ kd741,, /9g3"-- FORM #14 CITY OF RENTON RONMENTAL CHECKLIST REVIEW SH g 2 6 1985 REVIEWING DEPARTMENT: /._)p (_) C 0 POUCY OFV LOPr.AChsiT (1CPT DATE CIRCULATED: FEBRUARY 27, 198 COMMENTS DUE: MARCH 5, 1985 ECF — 028 _ 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL) , SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TI1LE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE AREA: 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE ..,— INADEQUATE 1) Earti 2) Air_ 3) Water l 4) Plarts 5) Aninals l/ 6) Eneigy and Natural Resources 7) Env' ronmental Health 8) Land and Shoreline Use 9) Housing 10) Aes:hetics Jam_ 11) Light and Glare 12) Recreation i- 13) Historic and Cultural Preservation 14) Transportation 15) Public Services 16) Utilities COMMENTS: RECOMMENDATION: DNS MITIGATED DNS El EIS REVIEWE[) BY: J a TITLE DATE: e FORM #14 IRONMENTAL CHECKLIST REVIEW SH REVIEWIN3 DEPARTMENT: DATE CIRCULATED: FEBRUARY 27, 1985 COMMENTS DUE: MARCH 5, 1985 ECF - 023 _ 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL) , SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: CITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE AREP : 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE INADEQUATE 1) Earth 2) Air 3) Wat2r 4) Plaits 5) Animals 6) Energy and Natural Resources 7) Environmental Health 8) Land and Shoreline Use 9) Housing 10) Aesthetics 11) Light and Glare 12) Recreation 13) Historic and Cultural Preservation 14) Trarsportation 15) Public Services 16) Utilities y COMMENTS: RECOMMENDATION: EO DNS 1 MITIGATED DNS EIS REVIEWED BY: i2TITLE: 74 ,-/TI1 4A(L7//1%. ,die j DATE: 8S FORM ##14 IRONMENTAL CHECKLIST REVIEW SF REVIEWING DEPARTMENT: F i 2 E DATE CIRLULATED: FEBRUARY 27, 1985 COMMENTS DUE: MARCH 5, 1985 ECF - 028 _ 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL) , SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: CITY OF RENTON, PARKS AND RECREATION DEPARTMENT FEB 2 A 1985, PROJECT TITLE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DEiCRIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE ARE4: 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE INADEQUATE 1) Earth 2) Air 3) Water 4) Plants 5) Animals 6) Energy and Natural Resources 7) Environmental Health 8) Land and Shoreline Use 9) Housing 10) Aesthetics 11) Light and Glare 12) Recreation 13) Historic and Cultural Preservation 14) Transportation 15) Public Services 16) Utilities COMMENTS : RECOMMENDATION: I \'J DNS 1 MITIGATED DNS 1 EIS REVIEWED BY: TITLE 6'G' 1t FORM #14 4 IRONMENTAL CHECKLIST REVIEW SH REVIEWING DEPARTMENT: P tt e S DATE CIRCULATED: FEBRUARY 27, 1985 COMMENTS DUE: MARCH 5, 1985 ECF - 028 - 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL), SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: :ITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCFIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS Of BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE AREA: 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE INADEQUATE 1) Earti 2) Air_ 3) Water 4) Plarts 5) Aninals 6) Eneigy and Natural Resources 7) Env'_ronmental Health 8) Land and Shoreline Use 9) Housing 10) Aesthetics 11) Light and Glare 12) Recreation 13) Historic and Cultural Preservation 14) Transportation 15) Public Services 16) Utilities COMMENTS: RECOMMENDATION: 17-71 DNS n MITIGATED DNS EIS n 4. REVIEWED BY: I / W TITLE: J ( DATE: `7 „/C,,/ FORM #14 IRONMENTAL CHECKLIST REVIEW SH REVIEWING DLPARTMENT: 136 L I C E DATE CIRCULATED: FEBRUARY 27, 1985 COMMENTS DUE: MARCH 5, 1985 ECF - 028 _ 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL) , SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: :ITY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCFIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE AREA: 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE INADEQUATE 1) Eart i 2) Air_ 3) Water 4) Plants 5) Animals 6) Eneigy and Natural Resources 7) Environmental Health 8) Lane and Shoreline Use 9) Hous,ing 10) Aesthetics 11) Light and Glare 12) Recreation 13) Historic and Cultural Preservation 14) Traisportation 15) Public Services 16) Utilities COMMENTS: RECOMMENDATION: 1 DNS El MITIGATED DNS I i EIS REVIEWED BY: (' ea:4*c— TITLE: f ;iZ, DATE: „ 2575 J FORM #14 IRONMENTAL CHECKLIST REVIEW SF REVIEWING DI:PARTMENT: L: J c DATE CIRCULATED: FEBRUARY 27, 1985 COMMENTS DUE: MARCH 5, 1985 ECF - 028 _ 85 APPLICATION NO(s). SA-020-85 (SITE PLAN APPROVAL) , SM-001 -85 (SUB. SHORELINE MGMT) PROPONENT: 7ATY OF RENTON, PARKS AND RECREATION DEPARTMENT PROJECT TITLE: NEW PICNIC SHELTER AT LIBERTY PARK. BRIEF DESCFIPTION OF PROJECT: APPLICATION FOR SITE PLAN APPROVAL AND FOR SUBSTANTIAL SHORELINE DEVELOPMENT PERMIT TO ALLOW THE CONSTRUCTION OF A 28 FOOT WIDE HEXAGONAL PICNIC SHELTER AND THE DEMOLITION OF THE OLD PICNIC SHELTER. LOCATION: LOCATED ALONG THE BANK OF THE CEDAR RIVER IN LIBERTY PARK, BETWEEN THE STREETS OF BRONSON WAY NORTH AND HOUSER WAY NORTH. SITE AREA: 12 ACRES BUILDING AREA (gross): IMPACT REVIEW ON ENVIRONMENTAL ELEMENTS ADEQUATE INADEQUATE 1) Earth 2) Air_ 3) Water 4) Plants 5) Animals 6) Energy and Natural Resources 7) Environmental Health 8) Lanc and Shoreline Use 9) Housing 10) Aesthetics 11) Light and Glare 12) Recreation 13) Historic and Cultural Preservation 14) Transportation 15) Public Services 16) Utilities COMMENTS: RECOMMENDATION: DNS n MITIGATED DNS EIS REVIEWEE BY: TITLE: DATE: v FORM #14 o L,ITY OF RENTO FILE NO(S) Es BUILDING & ZONING DEPARTMENT 7 r- - L 1,C -:. `_, MASTER APPLICATION NOTE TO APPLICANT: Since this is a comprehensive application form, only those items rela£ed to your specific type of applications) are to be completed. Please print or type. Attach additional sheets if necessary.) APPLICANT I I TYPE OF APPLICATION NAME FEES CITY OF RENTON PARKS DEPARTMENT Q REZONE*(FROM TO ADDRESS 200 Mill Avenue South 98055 0 SPECIAL PERMIT* ED CITY ZIP TEMPORARY PERMIT* Renton, WA 0 CONDITIONAL USE PERMIT* SITE PLAN APPROVAL TELEPHONE Q SPECIAL PERMIT FOR GRADE AND FILL 235-2560 No. of Cubic Yards: CONTACT PERSON Q VARIANCE* From Section: Justification Required NAME A Randy L. Berg ADDRESS SUBDIVISIONS: 200 Mi 1 l Avenue South 98055 ED SHORT PLAT CITY ZIP Q TENTATIVE PLAT Renton, WA Q PRELIMINARY PLAT TELEPHONE Q FINAL PLAT 235-2560 0 WAIVER Justification Required) OWNER NO. OF LOTS: NAME PLAT NAME: CITY OF RENTON ADDRESS PLANNED UNIT DEVELOPMENT: 200 Mill Avenue South 98055 Q PRELIMINARY CITY ZIP 0 FINAL Renton , WA P.U.D. NAME: TELEPHONE 235-2560 EJ Residential E3 Industrial QCommercial n Mixed LOCATION MOBILE HOME PARKS: PROPERTY ADDRESS LIBERTY PARK Q TENTATIVE Bronson Way N. & Houser Way N. EXISTING USE PRESENT ZONING t-1 PRELIMINARY Park p_l i_J FINAL PROPOSED USE PARK NAME: Park NUMBER OF SPACES: a ENVIRONMENTAL REVIEW COMMITTEE SQ. FT. ACRES m AREA:523 ,000 12 TOTAL FEES STAFF USE ONLY -- ADMINISTRATIVE PROCESSING TE TA PL--. , 1' i--. ----.,APPLICATION RECEIVED BY:r II nJ ((L l '1i' I ^ l% L 11 V! L APPLICATION DETERMINED TO BE: iii F E B 2 61985 Accepted Incomplete Notification Sent On By: Initials) cawiiimitizoNINO DEPT. ADDITIONAL MATERIAL RECEIVED BY: APPLICATION DETERMINED TO BE: Ft e:). /7 -I.9 0 Accepted QIncomplete Notification Sent On By: Initials) ROUTED TO: CEI Building CM Design Eng. 2j Fire LEI Parks ES Police t8 Policy Dev. LJ( Traffic Eng. Ei Utilities nr 7Tct'n 1 n, .. . Legal description of property (if more space is required, attach a separate sheet). That portion of government lot 2, in section 17, township 23 north range 5 east, W.M. , in King County, Washington lying southerly of the southerly right-of-way of Bronson Way North and lying northerly of the Cedar River waterway right-of-way (commercial waterway no. 2) AFFIDAVIT I,i rivY L ERG) being duly sworn, declare that I am authorized representative to act for the property owner,=owner of the property involved in this application and that the foregoing statements and answers herein contained and the information herewith submitted are in all respects true and correct to the best of my knowledge and belief. SUBSCRIBED AND SWORN TO BEFORE ME THIS p d( DAY OF fY 19 NOTARY PUBLIC IN AND FOR THE STATE OF WASHINGTON,RESIDING AT Name of Notary u lic)Signature f Owner) ie((& /97/6i ' oo !>'/l L 1 1/L Address) Address) TO/-4 (mot//& . City) State) (Zip) g-06) 2 35- Telephone) Acceptance of this application and required filing fee does not constitute a complete application. Plans and other materials required to constitute a complete application are listed in the "Application Procedure." Form #174 OF FEB FEB 2 619851' ECF: I c.F - oay ecsi t% © o eli t'i Vri `ent on LU: D a z o 9A 0 ENVIRONMENTAL CHECKLIST ItED SEP'.EP Purpose of Checklist: The State Environmental Policy Act (SEPA), chapter 43,21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for aliproposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instructions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply." Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmer tal agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional informatioi that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impacts. Use of Checklist for Nonproject Proposals: (Please Type or Print Legibly) Complete this checklist for nonproject proposals, even though questions may be answered 'does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJI=CT ACTIONS (part D). For nonproject actions (actions involving decisions on policies, plans and programs), the referer ces in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area," respectively. A. BACKGROUND 1.Name of proposed project, if applicable: New Picnic Shelter at Liberty Park . 2. Name of applicant: City of Renton Parks Department 3. Address and phone number of applicant and contact person: 200 Mill Ave . South Renton Wa 98055 235-2560 4.Date checklist prepared: 5.Agercy requesting checklist: City Of Renton , Building and Zoning 6. Proposed timing or schedule (including phasing, if applicable): Construction in the Spring - 1985 7.Do you have any plans for future additions, expansions, or further activity related to or connected with this proposal? if yes, explain. NO 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. None 10. List any governmental approvals or permits that will be needed for your proposal, if known. City of Renton Building Permit , Shoreline Management Substantial Development Permit , Site Plan Approval . 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Place a 28 ' wide hexagonal Picnic shelter in Liberty Park at the Bank of the Cedar River . Project includes a paved picnic patio along the bank and demolition of the old picnic shelter . 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topography map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. Liberty Park , directly across the Cedar River from City Hall . B. ENVIRONMENTAL ELEMENTS 1. EARTH a. General description of the site (circle one); L flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 40 % at the Rive Bank . c. What general types oil soils are found on the site (for example, caly, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Sandy loam d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. No 2 - 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximately quantities if known. 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and appaoximately quantities if known. No 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals . . .; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. Non(' c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. Run off from roof of shelter and from picnic patio will be channeled into a new catch basin . Run off will then be routed into the existing storm drainage system. 2) Could waste materials enter ground or surface waters? If so, generally describe. No 4 - e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. Steps will be taken to channel runoff from roof or paving into catch basins to avoid erosion of the River Bank. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? 25% h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: F 2.AIR a. What types of emissions to the air would result from the proposal (i.e., dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. None anticipated b. Are there any off-site sources of emission? Fo c. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. WATER a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Cedar River 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. Yes . Both the picnic shelter and the patio are adjancent to the River Bank. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None 3 - d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: 4. Plants a. Check or circle types of vegetation found on the site: l X deciduous tree: alder, maple, aspen, other li1X evergreen tree: fir, cedar, pine, other OX Shrubs DX grass o crop or grain o Wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other o water plants: water lily, eel grass, milfoil, other o other types of vegetation b. What kind and amount of vegetation will be removed or altered? 2500 Sq . Ft . of lawn area will be paved as a picnic patio. c. List threatened or endangered species known to be on or near the site. None. d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: Nome 5.Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: Birds: Hawk, heron, eagle, songbirds, other N n h i n s star 1 thgs , gulls Mammals: deer, bear, elk, beaver, other or r a s i nn a i dec."- Fish: bass, salmon, trout, herring, shellfish, other Ra 1 mnn C>>PkPrs , game fish b. List any threatened or endangered species known to be on or near the site. None c. Is the site part of a migration route? If so, explain. No 5 - d. Proposed measures to preserve or enhance wildlife, if any: None 6. Energy and Natural Resources a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. One duplex receptical ( 110 V) will be placed in the shelter for use by picnicing groups . b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: None 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. No 1) Describe special emergency services that might be required. None 2) Proposed measures to reduce or control environmental health hazards, if any: None b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Freeway and surface street traffic , occasional train across Houser , and Emergency vehicals exiting Fire Station 12 . 6 - 2) What types and levals of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. None 3) Proposed measures to reduce or control noise impacts, if any: None 8. Lanc and Shoreline Use a. What is the current use of the site and adjacent properties? Park b. Has the site been used for agriculture? If so, describe. No c. Describe any structures on the site. Grand Stand , Liberty Park Community Building , Renton Library, Henry Moses Pool Building, several small buildings for maintenance , pumping and storage . d. Will any structures be demolished? If so, what? Yes , the old picnic shelter e. What is the current zoning classification of the site? P - 1 f. What is the current comprehensive plan designation of the site? Recreation g. If applicable, what is the current shoreline master program designation of the site? Urban h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. i. Approximately how many people would reside or work in the completed project? None j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: None 7 - 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: None 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. ITT/A c. Proposed measures to reduce or control housing impacts, if any: N/A 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed. 13 ' Shelter will be structural steel , supported and completely open . b. What views in the immediate vicinity would be altered or obstructed? None c. Proposed measures to reduce or control aesthetic impacts, if any: None 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? None b. Could light or glare from the finished project be a safety hazard or interfere with views? 10 c. What existing off-site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: Non,, 8 - 12. Recreation a. What designated and informal recreational opportunities are in the immediate vicinity? Athletics , swimming, picnicing, jogging , etc . b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: The intent of the project is to increase the Recreational opportunities , particularly for picnicers in the Civic Center area . 13. Hist)ric and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. c. Proposed measures to reduce or control impacts, if any: No impacts anticipated 14. Tra nsportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. Access to Park from Houser , Bronson and from Mill via City Hall parking lot . b. Is site currently served by public transit? If not, what is the approximately distance to the nearest transit stop? Yea c. How many parking spaces would the completed project have? How many would the project eliminate? No change in existing parking d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe indicate whether public or private). No 9 - e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. Yes , B.N . tracks across Houser from the Park site . f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. None - little increase in park use is anticipated . g. Proposed measures to reduce or control transportation impacts, if any: None 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No b. Proposed measures to reduce or control direct impacts on public services, if any. Moo 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. The picnic facilities will use electric and water facilities already available on the site . C. SIGNATURE I. the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non-significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. Proponent: Name Printed: RRndy T, . Borg 10 - 176 11-8-84 ENDING' OF FILE FILE TITLE