Loading...
HomeMy WebLinkAboutEx_05_Landscape_PlanMAPLE V A L L E Y H W Y 15 4 T H P L S E 15 2 N D A V E S E MAPLE V A L L E Y H W Y 15 4 T H P L S E 15 2 N D A V E S E LOT 3 KC SP N O . L99S 3 0 1 9 AFN 2 0 0 1 8 3 1 9 0 0 0 0 2 15 2 N D A V E S E MAPLE V A L L E Y H I G H W A Y - S R 1 6 9 KIDS OFFICE (10'X8'6") CARE (9'9"X9') YOUTH PASTOR (10'X9') WORSHIP PASTOR (8'X10') I.T./ STOR. JAN. SM CONF (13'6"X9') DIRECTOR (10'X8'6") FINANCE SUITE HR/PAY (10'X8'6'') KIDS OFFICE (10'X8'6") KIDS OFFICE (10'X8'6") KIDS BREAK AREA GROUP PASTOR (8'X10') YOUTH WORSHIP FIR E SP R I N K Δ 1 5 2 N D A V E S E RESTORE EXISTING LAWN AREA, TYP RESTORE EXISTING LAWN AREAS, TYP LANDSCAPE CALCULATIONS TOTAL SITE AREA 2,463,754 SF (56.56 ACRES) TOTAL IMPERVIOUS SURFACES 487,928 SF (11.20 ACRES) TOTAL LANDSCAPE/PERVIOUS AREAS 1,975,882 SF (45.36 ACRES) PROPOSED NEW LANDSCAPE AREAS 3,575 SF (0.082 ACRES) 140,065 SF - EXISTING LANDSCAPE AREAS (shown around perimeter of existing building)* excludes natural areas in calculation 3,575 SF - PROPOSED LANDSCAPE AREAS (shown around proposed building) *Landscape Areas are based on available survey data DATE: NUMBER: PROJECT:New Life Church - Renton May 15, 2023 LLA0404.23 TITLE: DESIGN:MJL DRAWN:MJL CHECKED:EW SHEET: SCALE: NE W L I F E C H U R C H 15 7 1 1 1 5 2 N D A V E S E RE N T O N , W A 9 8 0 5 8 PROJECT ADDRESS: 21 1 1 S o u t h C S t r e e t , T a c o m a , W A 9 8 4 0 2 2 5 3 - 2 0 9 - 4 0 5 3 | M o g h a n @ L y o n L A . c o m REVIEW SET NOT FOR CONSTRUCTION La n d s c a p e A r c h i t e c t s , LL C REVISIONS: REV 1: REV 2: REV 3: Know what's below. before you dig.Call R DRAWING SET: PRELIMINARY SUBMITTAL L1.00 OVERALL SITE PLAN 1" = 70'-0" Graphic Scale: 1" = 70'-0" at full size (24" x 36") 0 35'70'140'280' SEE L1.01 SEE 2/L1.02 SEE 1/L1.02 RECEIVED 07/06/2023 AMorganroth PLANNING DIVISION DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A KIDS OFFICE (10'X8'6") CARE (9'9"X9') YOUTH PASTOR (10'X9') WORSHIP PASTOR (8'X10') I.T./ STOR. JAN. SM CONF (13'6"X9') DIRECTOR (10'X8'6") FINANCE SUITE HR/PAY (10'X8'6'') KIDS OFFICE (10'X8'6") KIDS OFFICE (10'X8'6") KIDS BREAK AREA GROUP PASTOR (8'X10') YOUTH WORSHIP FI R E SP R I N K Δ 1 5 2 N D A V E S E (3) TREES TO BE REMOVED X X X PLANT SCHEDULE QTY. BOTANICAL NAME COMMON NAME SIZE & SPACING, NOTES SHRUBS 6 Choisya ternata Mexican Orange Blossom 3 gal, spacing as shown 33 Mahonia aquifolium 'Compacta'Compact Oregon Grape 3 gal @ 3' OC, triangular spacing 14 Nandina domestica 'Gulf Stream'Gulf Stream Heavenly Bamboo 3 gal @ 3' OC 8 Pieris japonica 'Mountain Fire'Mountain Fire Pieris 3 gal @ 5' OC 22 Prunus laurocerasus 'Otto Luyken'Otto Luyken Laurel 3 gal @ 4' OC 14 Spiraea betulifolia 'Tor'Birchleaf Spirea 3 gal @ 3' OC GROUNDCOVERS / GRASSES 89 Arctostaphylos uva-ursi Kinnikinnick 'Vancouver Jade'4" pot @ 3' OC 'Vancouver Jade' 6 Calamagrostis × acutiflora Feather Reed Grass 1 gal @ 4' OC, triangular spacing ‘Karl Foerster’ 35 Pennisetum alopecuroides Little Bunny Fountain Grass 1 gal @ 2' OC 'Little Bunny' 47 Calluna vulgaris 'Firefly'Firefly Heather 1 gal @ 30" OC EXIST. LIGHT POST TREES 2 Abies lasiocarpa Subalpine Fir 6'-8' ht, uniform & full bodied, B&B 5 Acer buergerianum Trident Maple 2" cal & 8'-12' ht min, 35' OC, fully branched & uniform, spacing as shown, B&B 2 Acer truncatum 'Warrenred'Pacific Sunset Maple 2" cal & 8'-12' ht min, fully branched & uniform, spacing as shown, B&B SPECIAL SUN MIXTURE 8,700 SF ± Perennial Ryegrass 80%By Country Green Turf Farms Fine Fescue 20%Seeding Rate: 6-8 lbs per 1,000 sf X Existing trees to be removed for construction 8 trees proposed to be removed 9 trees proposed to be add. Greater than 1:1 replacement LANDSCAPE SPECIFICATIONS & NOTES 1.SCOPE OF WORK a.The landscaping and irrigation work is part of a larger site project resulting in disturbance to the site, landscape and irrigation. As such, the landscape contractor shall coordinate all work with the general contractor, both before any construction begins, and during the course of construction. 2.MATERIALS a.Topsoil. Topsoil A shall be a 3 way blend of the following products; sandy loam, sand and organic compost (40-40-20). Refer to Specifications b.Mulch. Mulch shall be dark fine mulch, applied to a 2” compacted depth on all beds. Mulch available from Pacific Topsoil 800-884-7645 c.Fertilizer. Agraform 21-gram tablet time release fertilizer shall be used in all plantings. Place 1 for each ground cover, 2 for each shrub and 4 for each tree. They shall be placed in the plant pits as detailed. Also, top dress all plants with a suitable 'starter' fertilizer. d.Tree Stakes. Tree stakes shall be 2” diameter x 8' length Lodgepole pine. Fasteners shall be 1” PVC Chain-Lock, placed as detailed. 3.SOIL PREPARATION a.Prior to any landscape work, contractor shall remove, or have removed, all debris from the other building trades from the landscape surfaces. NO landscape work shall commence until the areas are cleared of other trades debris. b.Cultivate the existing ground surface to a minimum depth of 8” and remove all rocks over 1”, existing roots and other debris. c.Fine grade the subgrade to adjoining surfaces in preparation of adding specified topsoil. d.Beds. Place a minimum of 8” of specified topsoil on all beds and till or cultivate the topsoil a minimum depth of 8”. Remove all rock and debris which may surface. Finished grade of topsoil shall be 2.5” below adjoining paved surfaces, allowing 2” for mulch. Therefore, finished grade shall be 1/2" below paved surface. 4.PLANTING OF TREES, SHRUBS AND GROUNDCOVERS a.Contractor responsible to verify quantities. b.Contractor is to confirm that all beds are prepared and ready for planting, without interference with other trades. c.Layout all plants as per plan and approval by Landscape Architect or Owner's Rep, making sure the plants are orientated to give best appearance to the viewer. d.Pit plant all plants into prepared soil and plant per the details. While planting, water the plants into the plant pits thoroughly soaking the root balls and soil. Place fertilizer tablets as specified, filling plant pits with specified topsoil. Top dress fertilize when completed. e.Trees planted 5' or less from paved surfaces shall be planted with root barrier control. f.Shrubs and groundcover shall be planted to attain coverage of 90% of the planting area within 3 years. 5.SOD PREPARATION a.Place approx. 4" of specified soil mix to prepare the areas prior to placing sod, filling all depressions and removing all high spots. Compact uniformly with a water filled drum. b.Install sod, making sure the sides and ends are butted tightly together. After sod is installed, roll it with a water filled drum. c.Installed sod must be flush with plant beds and adjoining concrete surfaces. d.Water with automatic irrigation to assure well rooting and growth of the lawn. e.Fence off areas from foot traffic or others through establishment period and until final approval. f.Mow a minimum of 2x before when lawn is long enough for mowing prior to final approval. 6.LAWN ESTABLISHMENT a.Confirm a full coverage, working automatic irrigation system, prior to installation of lawn. Mow every 7-10 days until established and approved. 7.WARRANTY a. All landscaping shall be warranted for one year from FINAL ACCEPTANCE. Plants requiring replacement shall be of the original variety and size as specified herein. 8.IRRIGATION a.An automatic irrigation system shall be installed through the Bidder Design process b.Contractor to confirm location of controller with owner. c.Contractor to provide Coverage Test for approval by Landscape Architect or Owner. d.Contractor to provide As-Built Drawing of irrigation system. DATE: NUMBER: PROJECT:New Life Church - Renton May 15, 2023 LLA0404.23 TITLE: DESIGN:MJL DRAWN:MJL CHECKED:EW SHEET: SCALE: NE W L I F E C H U R C H 15 7 1 1 1 5 2 N D A V E S E RE N T O N , W A 9 8 0 5 8 PROJECT ADDRESS: 21 1 1 S o u t h C S t r e e t , T a c o m a , W A 9 8 4 0 2 2 5 3 - 2 0 9 - 4 0 5 3 | M o g h a n @ L y o n L A . c o m REVIEW SET NOT FOR CONSTRUCTION La n d s c a p e A r c h i t e c t s , LL C REVISIONS: REV 1: REV 2: REV 3: Know what's below. before you dig.Call R DRAWING SET: PRELIMINARY SUBMITTAL L1.00 LANDSCAPE PLAN 1" = 20'-0" Graphic Scale: 1" = 20'-0" at full size (24" x 36") 0 10'20'40'80' DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A 15 2 N D A V E S E MAPLE V A L L E Y H I G H W A Y - S R 1 6 9 STREET TREES, 35' OC RESTORE EXISTING LAWN AREA LAWN, MATCH EXISTING RESTORE EXISTING LAWN AREA (4) TREES TO BE REMOVED X X X X LIMITS OF WORK, REFER TO CIVIL LIMITS OF WORK, REFER TO CIVIL MAPLE V A L L E Y H W Y MAPLE V A L L E Y H W Y RESTORE EXISTING LAWN AREA X (1) TREE TO BE REMOVED LIMITS OF WORK, REFER TO CIVIL DATE: NUMBER: PROJECT:New Life Church - Renton May 15, 2023 LLA0404.23 TITLE: DESIGN:MJL DRAWN:MJL CHECKED:EW SHEET: SCALE: NE W L I F E C H U R C H 15 7 1 1 1 5 2 N D A V E S E RE N T O N , W A 9 8 0 5 8 PROJECT ADDRESS: 21 1 1 S o u t h C S t r e e t , T a c o m a , W A 9 8 4 0 2 2 5 3 - 2 0 9 - 4 0 5 3 | M o g h a n @ L y o n L A . c o m REVIEW SET NOT FOR CONSTRUCTION La n d s c a p e A r c h i t e c t s , LL C REVISIONS: REV 1: REV 2: REV 3: Know what's below. before you dig.Call R DRAWING SET: PRELIMINARY SUBMITTAL L1.02 FRONTAGE LANDSCAPE PLAN 1" = 20'-0" Graphic Scale: 1" = 20'-0" at full size (24" x 36") 0 10'20'40'80' SE E 2 / L 1 . 0 2 SE E 1 / L 1 . 0 2 FRONTAGE LANDSCAPE PLAN2 FRONTAGE LANDSCAPE PLAN1 DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A SCALE: 1" = 1'-0" CONIFER PLANTING DETAIL COVER SOIL LOOSENED AREA WITH 3" OF MULCH, AS SPECIFIED. KEEP MULCH 3" AWAY FROM TREE TRUNK SOIL BACKFILL (SEE SPECS) PLACE ROOTBALL ON SOLID SOIL REMOVE BURLAP FROM TOP 12 OF ROOTBALL TILL COMPACTED SUBGRADE AS SPECIFIED DIG THE PLANTING PIT AT LEAST TWICE THE SIZE OF THE ROOTBALL PLACE TOP OF ROOTBALL 1" ABOVE LEVEL GROWING IN NURSERY NOTES: 1. FERTILIZE & WATER AS SPECIFIED FOLLOWING PLANTING. 2. SEE SPECS FOR ADDITIONAL INFORMATION 3. SEE STAKING DETAILS. SCALE: NTS SCALE: 1" = 1'-0" CONIFER TREE STAKING 2/ 3 H E I G H T O F T R E E 2" Ø LODGE POLE STAKE. PLACE OUTSIDE ROOTBALL 1" CHAIN LOCK TREE TIE 3 ' M I N 45°-60° 8 " M I N SCALE: NTS SCALE: 3/4" = 1'=0" DECIDUOUS TREE PLANTING DETAIL PLACE ROOTBALL ON SOLID SOIL NOTE: 1. DO NOT FERTILIZE. WATER AS NECESSARY FOLLOWING PLANTING. 2. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION. 3. SEE STAKING DETAILS SPECIFIED TOPSOIL DIG THE PLANTING PIT AT LEAST 3 TIMES THE SIZE OF THE ROOTBALL COVER SOIL LOOSENED AREA WITH 3" OF MULCH, AS SPECIFIED. KEEP MULCH 3" FROM TREE TRUNK STRONG STOUT STEMS AND BUDS ROTOTILL COMPACTED SUBGRADE AS SPECIFIED WIDE BRANCH ATTACHMENT REMOVE ALL BURLAP FROM ROOTBALL SCALE: NTS SCALE: 3/4" = 1'=0" DECIDUOUS TREE STAKING DETAIL TO B O T T O M B R A N C H E S STAKE TO PENETRATE 12" MIN. BELOW BOTTOM OF PLANTING PIT1' 2" Ø LODGE POLE STAKE. PLACE OUTSIDE ROOTBALL (2) 1" CHAIN-LOCK TREE TIES SCALE: NTS SCALE: 1/2" = 1'-0" SHRUB PLANTING DETAIL FG SPREAD ROOTS OF BASE ROOT PLANTS OUT OVER CONE OF HAND-FIRMED TOPSOIL CONE OF HAND-FIRMED TOPSOIL FOR BALL & BURLAP PLANTS NOTES: 1. USE PLANT STARTER SOLUTION DURING PLANTING OPERATION. FEED AS SPECIFIED. 2. SHRUBS SHALL BEAR SAME RELATION TO FINISHED GRADE AS IT BORE TO PREVIOUS EXISTING GRADE. TOP OF ROOTBALL SHALL BE 1" ABOVE FINISHED GRADE SAUCER TOPSOIL BACKFILL (SEE SPECS) REMOVE ALL BURLAP FROM ROOT BALL MULCH, AS SPECIFIED 3" M I N 18 " M I N 6" 12" MIN SCALE: NTS SCALE: 1" = 1'-0" GROUNDCOVER PLANTING DETAIL 6" 6" 1 FERTILIZER TABLET SPECIFIED TOPSOIL MULCH, AS SPECIFIED SCALE: NTS EQ. 1. 5 x SP R E A D EQ . BACK OF CURB OR LANDSCAPE BED EDGE GROUNDCOVERS, TYP NOTE: 1.ALL GROUNDCOVER SHALL BE PLANTED AT EQUAL TRIANGULAR SPACING AS PER PLAN, UNLESS SHOWN OTHERWISE 2.SET GROUNDCOVER BACK FROM CURB OR WALKWAY AT LEAST 1-1/2 TIMES THE SPREAD OF SUCH GROUNDCOVER 1 2 3 4 5 6 SCALE: 1/2" = 1'-0" TREE & SHRUB SLOPE PLANTING DETAIL EXIST. SUBGRADE SCALE: NTS 12" MIN FINISHED GRADE ORIGINAL GRADE MULCH, AS SPECIFIED PLANTING SOIL & FERTILIZER BLEND INTO EXIST. SLOPE SAUCER BUILT ON LOW SIDE PLANT SET AT ORIGINAL DEPTH EXIST. SUBGRADE 12" MIN FG ORIGINAL GRADE MULCH, AS SPECIFIED. KEEP 3" AWAY FROM TRUNK PLANTING SOIL & FERTILIZER BLEND INTO EXIST. SLOPE SAUCER BUILT ON LOW SIDE PLANT SET AT ORIGINAL DEPTH 7 DATE: NUMBER: PROJECT:New Life Church - Renton May 15, 2023 LLA0404.23 TITLE: DESIGN:MJL DRAWN:MJL CHECKED:EW SHEET: SCALE: NE W L I F E C H U R C H 15 7 1 1 1 5 2 N D A V E S E RE N T O N , W A 9 8 0 5 8 PROJECT ADDRESS: 21 1 1 S o u t h C S t r e e t , T a c o m a , W A 9 8 4 0 2 2 5 3 - 2 0 9 - 4 0 5 3 | M o g h a n @ L y o n L A . c o m REVIEW SET NOT FOR CONSTRUCTION La n d s c a p e A r c h i t e c t s , LL C REVISIONS: REV 1: REV 2: REV 3: Know what's below. before you dig.Call R DRAWING SET: PRELIMINARY SUBMITTAL L1.03 PLANTING DETAILS As Shown DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A DATE: NUMBER: PROJECT:New Life Church - Renton May 15, 2023 LLA0404.23 TITLE: DESIGN:MJL DRAWN:MJL CHECKED:EW SHEET: SCALE: NE W L I F E C H U R C H 15 7 1 1 1 5 2 N D A V E S E RE N T O N , W A 9 8 0 5 8 PROJECT ADDRESS: 21 1 1 S o u t h C S t r e e t , T a c o m a , W A 9 8 4 0 2 2 5 3 - 2 0 9 - 4 0 5 3 | M o g h a n @ L y o n L A . c o m REVIEW SET NOT FOR CONSTRUCTION La n d s c a p e A r c h i t e c t s , LL C REVISIONS: REV 1: REV 2: REV 3: Know what's below. before you dig.Call R DRAWING SET: PRELIMINARY SUBMITTAL L1.04 PLANT IMAGES As Shown PLANT IMAGES DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A