Loading...
HomeMy WebLinkAboutEx_19_Construction_Mitigation 10317 8th Ave NE Seattle, WA 98125 509.336.9200 CONSTRUCTION MITIGATION DESCRIPTION: NEW LIFE CHURCH - RENTON September 20, 2023 PROPOSED CONSTRUCTION DATES: APRIL 2023 – FEBRUARY 2024 HOURS AND DAYS OF OPERATION: M-F 7AM-5PM PROPOSED HAULING TRANSPORTATION ROUTES: FROM THE SITE TO 152ND TO 169 MAPLE VALLEY HIGHWAY MEASURES TO BE IMPLEMENTED TO MINIMAZE DUST, TRAFFIC, AND TRANSPORTATION IMPACTS, EROSION, MUD NOISE, AND OTHER NOXIOUS CHARACTERISTICS: BUILDING CONSTRUCTION WILL BE DONE BETWEEN HOURS OF NORMAL OPERATION. NORMAL CONSTRUCTION NOISE WILL BE MADE. FOR THE POWER LINE CONSTRUCTION ALL PRECAUTIONS OF TRAFFIC, TRAFFIC ATTENDANTS, DUST MITIGATION AND EROSION CONTROL WILL BE IMPLEMENTED TO AVOID ANY SUCH NUISANCES. ANY SPECIAL HOURS PROPOSED FOR CONSTRUCTION OR HAULING (I.E. WEEKENDS, LATE NIGHTS): NONE AT THIS TIME PRELIMINARY TRAFFIC CONTROL PLAN: ALL TRAFFIC DUE TO THE CONFIGURATION OF THE SITE WILL BE THROUGH 152ND STREET AND 169TH. IF ANY SPECIAL ACCOMODATIONS NEED TO BE MADE CONTRACTOR WILL PROVIDE A PLAN AND ATTENDANTS TO DIRECT TRAFFIC AS NECESSARY. DocuSign Envelope ID: 8DC95E5E-DFD2-4FC3-AECA-A837B4E4B02A