Loading...
HomeMy WebLinkAboutLUA72-708- Large Format at eee eS ay ne A hagas Siar pen sce IOS = ei ROSATO LOS ae praca ? “PRefsar bo ASD NE Se Read wiNG " vi wh Sarg es — os baad > Xe cae PR el ote — 4 [S s > x | 7 ; x ° = Nettie cag i De ee mam SG 3 oa ——__y~_g- R/W REQUIREMENTS nae”) ee ae es ae ee | CALEIN FEE TEMPORARY N TEMPORARY PERMANENT “or om 6 — eee OWNER CONST PERMIT | EASEMENT OWNER CONST. PERMIT | EASEMENT = eames a: | : re wv? : to) 50 106 sO Ol | al F i co- r yp BEG TO3N-RAE METRO INDUSTRIAL DISTRICT 3 — ciTY O RENTON ae 4f of cg ys : PUGET SOUND 90 Te if ° POWER AND LIGHT 2 “a ae F.4. DICKSON /-6 /. / <E- ¢ $0. J53RD os: ME€B INVESTMENTS _25 a RJ. BALCOM 4 ai Lee [e>8 puct TELE. conpuit—}-}4 4° GAS PIPELINE <— 6) REVISIONS NORTHERN PACIFIC RAILROAD Co. = 5 J.A. (ISAACSON ae aa m [E> 24" METRO PIPELINE ay, i SYMBOL DESCRIPTION DATE [APPROVED PACIFIC COAST RAILROAD COMPANY 8 4 B. ISAACSON eF :0O$ B. ISAACSON | —|2 WATERLINE <6 Co ati ———— OLYMPIC NATURAL MINOR CORRECTIONS 5/¥e8 GUC. WASHINGTON STATE HIGHWAY ia I] CHRIS PALZER — . OG EARLINGTON GARDENS ADDITION if 1 GAS CO. PIPELINE [7° : on. MUNICIPALITY OF METROPOLITAN WASHINGTON NATURAL GAS ¥ ee ee Sree ae eee [81 AWC. SEATTLE PIPELINE EASEMENT 2 me CO. PIPELINE EASEMENT i ‘ey rd 2 - | - b F : PI, 675+97.72 ; REVISED NOTE 3 sh | p a ha AML EXCAVATION DATA | / \ N 173,196.10 | is acer (4) | R/W WIDTH ADJUSTED ne. FROM TO CUBIC : =! J.A.ISAACSON ©" O25 | STA. 688+00| STA.675+48%| Y2159 YZ :. 4 Abe) Shc -— . Ot | < & Mo Lit & ot — Lg | ss Hl " y ZW | ~— ~ a > q \ 0. cri fs) ‘ ‘ pa | , | —"< 675 +00 = o = 225 a. | END TRANSITIO ~* ak Lil 2 li | O& N.PR.R. R/W PUGET | a O ) La I \ SOUND © — Pa WASHINGTON STATE ~ > = POWER & 1" ar a ui HIGHWAY R/ B it ul g LIGHT CO. | ee eee wi G Zo : oa ae TEMPORARY. CONSTRUCTION L ~ xt O I 1 at | + TF “ | \ |_ 400 . APPARENT PROPERTY LINE ie O}ul \ “i ae ay \ R/W \ , CURVE DATA | et he 50 \ A= 33° 56°57" s | as 1 \ 50 D = 20° Hush \ T = 87.45 ad La 169.75 : \ : BUILDING \ | rT CURVE DATA T A = 47° 42’ 46" = D= {5° R= 381.97 ; T= 168.92 ae : tL = 318.09 T ; | 4 - Cee: HIGHWAY R/W ee = Ae : , od ) Boe : ; = 18.934 Wj . eel 7 s\3 ry ; Att *\3 & W J fA m , — = A\L 2 ‘ ia rE a Lo | ae mn PP 4 r.) i | l ray WASHINGTON NATURAL GAS PIPE 10° EASEMENT i S T i L PI 681+14.04 E1653, 759 Ly i735 ; HOUSE T x: DE. SE Zs = 4, 00 ee t Rot . | %& —— INTERSTATE. , *405 : t ; ae. PER 4 (TO REMAIN UN(>IST URBED) | 1 i R J. BALCOM é ig Dy eee ai es APPARENT PROPERTY LINE 7 e _ APPARENT NOTES i | APPARENT PROPERTY LINE (BEGIN TRANSITION) ~ L ors \ \PROPERTY : |. The temporary constru¢tion permit shall be obtained for a period of 36 ae ee \ EINE ' months from beginning of construction and shall terminate at end of this LAND RIGHTS WORK MAP \ } period or upon completion of the construction work, whichever occurs first. \ | Wie 2. All fences, buildings, trees, and bridges within the permanent P- ] CHANNEL \ eae : easement and temporary construction permit limits shall be removed \ and disposed of unless noted otherwise EAST GREEN RIVER WATERSHED PROJECT i RO PIPELINE ' 3. Tempora truct it hall be for use by the GREEN lO°R/W HIGHWAY BRIDGE RIVER FLOOD CONTROL ZONE DISTRICT. rae ooheenel oe storage (To REMAIN UNDISTURGRES of canemucton equomeni ond materi cluding, spots removed from | GREEN RIVERFLOOD CONTROL. ZONE DISTRICT, KING COUNTY, WASHINGTON i sae permit areas shall become the property of the landowner upon T — 4 YorTve | Sepiroticn, of a sarenre: U.S. DEPARTMENT OF AGRICULTURE : \ \ OLD R NTON 4 All co-ordinates are based on the Washington State co-ordinate system. SOIL CONSERVATION SERVICE \ te ea oe i i ee oie ee, CAL en \ in tabulations | ined ni J . | \ : TUKWILA aed an, = es Pas nb been obta by planimetering or Rees VLU. rae B | H- 67 Approved oy : Ay YU e , | peek “ HIGH WAY 6. All pipelines are to be located in positions that do not block channel : Tite, STATE. COCA See a as 4 se ey ta 2o flow. Pipelines shall pass under the channel bottom or over the Drawn. G.L J. _. 142@] }-----------~~----------------------- x ap i channel at a minimum elevation of +16.0' M.S.L. Title KING COUNTY ENGINEER = UNDISTURBED) oy es o e traced Ws. mwits-—is--+- ~<a =p eeet - | Orawing Mo ETRO PIPELINE 2 Waterway to be left open, culvert to b tolled See SHEET 4 for details of powerline crossing and railroad and 3 me \ | ‘oREMAIN- UNDISTURBED) a oe | ——we GO eas 1 ; 4 ieley ; Be : oe highway bridge crossings and water ,gas and sewer pipeline crossings. Checked WA. L.C. Pe 1-68 i EG-LR. Ol. 02 R-)08-7A $$