HomeMy WebLinkAboutLUA-06-010_Report 01Le gend
D R~I!\~J I ~II(J" System E"~l o~ur e
C S«c -o ut llrc
N
,,0 11lD '00 W+E
F~~t S
FIGURE 1
Neighborhood Detail Map
Maplewood Incident
Renton , Washington
Goms PP60-1
I-'H-1%-FI 9 1.m,d
0 1105:06
OP l C
Map lewood ~.E~.~~~"
CO", .. "on".lnc
t
~
! I " ~ ~ .--It--
! ~ 11"i .. '
1 , . I _·s~ , -I
•
\\1, ,
II ! I z I '" ,~ \ 'I I ~
G
I
,
I" I I ~ '" , p , • , , III <
1 . \ ~ \11 ~,
~--11~i ~
~
II
1\' II'
I
I
10 I __ -.J
0 ~i ~ <::
i , ~ ~
" ~ l
i@ I
~ ~ :D" "' • • it ~¥ • -n
" ~ I , G) f'" • • ~
~H ~[ ~$
~ · -g. m ", :l" Sl. • '" S~ ~
~ o· .. , "-,
~~C .J(~ ,. OJ
CITY OF RENTON
PLANNING / BUILDING / PUBLIC WORKS
MEMORANDUM
Date: March 27, 2006
To: City Clerk's Office
From: Stacy Tucker
Subject: Land Use File Closeout
Please complete the following information to facilitate project closeout and indexing by the City
Clerk's Office.
Project Name:
LUA (file) Number:
CrOSS-References:
AKA's:
Project Manager:
Acceptance Date:
Applicant:
Owner:
Contact:
· PID Number:
ERC Decision Date:
ERC Appeal Date:
Maplewood Soil Remediation
LUA-06-01O, TP
Keri Weaver
February 21, 2006
Neil Norcross, Olympic Pipe Line Co.
City of Renton
Neil Norcross, Olympic Pipe Line Co.
162305912907; 162305906602
Administrative Approval: March 6, 2006
"; · Appeal Period Ends: March 20, 2006 • ~~ __________________________ ~ ________________________________________ i
,
Public Hearing Date: •
Date Appealed to HEX:
By Whom:
HEX Decision: Date:
Date Appealed to Council:
By Whom:
Council Decision: Date:
Mylar Recording Number: ~~------~------------------------------------------------:i
Project Description: TEMPORARY USE PERMIT FOR THE CONTINUATION OF SOIL REMEDIATION'
ORIGINALLY UNDERTAKEN UNDER FILE NOS. LUA98-136 AND LUAOO-135 AND LUA03-084.'
ACTIVITY INCLUDES ONGOING REMOVAL OF HYDROCARBONS FROM GROUNDWATER RESULTING t
· FROM A 1985 VALVE LEAK WEST OF MAPLEWOOD PARK. I
, Location: 3524 SE 5th Street, Maplewood Park & 3400 SE 6 th Street I
· Comments: 1
TEMPORARY USE PERMIT
City of Renton File Number: LUA06-010, TP
Project Name: Maplewood Soil Remediation
Location: 3524 SE 5th St, Maplewood Park, and 3400 SE 6th St
King County Assessor's Account Numbers: 162305912907 and 162305906602
Owner Name: City of Renton
Applicant Name: Neil Norcross, Olympic Pipe Line Co., 2319 Lind Ave SW, Renton,
WA 98055
Project description: The applicant requests a permit to maintain the use of existing north and
south equipment enclosures in Maplewood Park for continuation of soil remediation originally
undertaken under File Nos. LUA98-136, LUAOO-135 and LUA03-084. Activity includes ongoing
removal of hydrocarbons from groundwater resulting from a 1985 valve leak west of Maplewood
Park. The remediation is being conducted under the Model Toxics Control Act as administered
by the Washington State Department of Ecology and the Puget Sound Clean Air Agency.
Date of Permit Issuance: March 6, 2006
Date of Expiration: March 6, 2008
~ / .. Ii ~7I~'" (~It' ,~ . i. i U t /
Approved by the City of Renton
Development Services Division Director
Date
Appeals: Appeals must be filed in writing by March 20, 2006 together with the required $75.00
application fee to the City of Renton Hearing Examiner, City of Renton, 1055 South Grady Way,
Renton. WA 98055. Appeals to the Examiner are governed by City of Renton Municipal Code
Section 4-8-110. Additional information regarding the appeal process may be obtained from the
Renton City Clerk's Office, (425) 430-6510.
City of Ren.~.. Department of Planning I Building I Public ~
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: -P\cV\~:vi f'.,( ~ COMMENTS DUE: MARCH 3, 2006
APPLICATION NO: LUA06-010, TP DATE CIRCULATED: FEBRUARY 21, 2006
APPLICANT: Neil Norcross, Olympic Pipe Line Co, PROJECT MANAGER: Keri Weaver
PROJECT TITLE: Maplewood Soil Redemption Temp Use Permit PLAN REVIEW: Mike Dotson
SITE AREA: 1 acres BUILDING AREA (gross): N/A
LOCATION: 3524 SE 51h & 3400 SE 61h St WORK ORDER NO: 77544
SUMMARY OF PROPOSAL: Temporary Use Permit for the continuation of soil remediation originally undertaken under file Nos.
LUA98-136 and LUAOO-135 and LUA03-084. Activity includes ongoing removal of hydrocarbons from groundwater resulting from a
1985 valve leak west of Maplewood Park.
A. ENVIRONMENTAL IMPACT (e.g. Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housil1Q
Air Aesthetics
Waler Li ht/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
Airport Environment
10,000 Feet
14,000 Feet
ull' V'" '''--'' ''-'"
RECEIVED
FEB 20 2006
BUILDING DIVISION
B. POLICY-RELATED COMMENTS
C. CODE-RELA TED COMMENTS
We have reviewed application with particular attention to those areas in which we have expertise and have identified areas of probable impact or
iovrmation is needed to properly assess this proposal. ----m ... '----V2 Y/d/ ~~?a~te~~7~~~--------------
City of Remvn Department of Planning / Building / Public W ,.0
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: (~lYlAjA1 en COMMENTS DUE: MARCH 3, 2006
APPLICATION NO: LUA06-01 0, TP DATE CIRCULATED: FEBRUARY 21,2006
APPLICANT: Neil Norcross, Olympic Pipe Line Co, PROJECT MANAGER: Keri Weaver
PROJECT TITLE: Maplewood Soil Redemption Temp Use Permit PLAN REVIEW: Mike Dotson
SITE AREA: 1 acres BUILDING AREA (Qross): N/A
LOCATION: 3524 SE 5'h & 3400 SE 6'h St WORK ORDER NO: 77544
SUMMARY OF PROPOSAL: Temporary Use Permit for the continuation of soil remediation originally undertaken under file Nos,
LUA98-136 and LUAOO-135 and LUA03-084. Activity includes ongoing removal of hydrocarbons from groundwater resulting from a
1985 valve leak west of Maplewood Park.
A. ENVIRONMENTAL IMPACT (e,g. Non-Code) COMMENTS
Element afthe Probable Probable More Element of the Probable Probable More
Environment Minor Major Information
Impacts Impacts Necessary
Environment Minor Major Information
Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Waler Liqht/G/are
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy! HistoridCufturaf
Natural Resources Preservation
Airport EnVironment
10,000 Feel
14,000 Feel
..... 11' v~ ,., .... ".v ..
RECEIVED
FEB 20 2006
BUILDING DIVISION
B. POLICY-RELA TED COMMENTS
C, CODE-RELA TED COMMENTS
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or
areas wheai4 additional information ;s needed to properly assess this proposal.
/
Ddte
City of Ren,_ .. Department of Planning! Building! Public \1\
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: fi '("C COMMENTS DUE: MARQM""3, 2006·
APPLICATION NO: LUA06-010, TP DATE CIRCULATED: FEBRUARY 21, 2006 .
APPLICANT: Neil Norcross, Olympic Pipe Line Co. PROJECT MANAGER: Keri Weaver
PROJECT TITLE: Maplewood Soil Redemption Temp Use Permit PLAN REVIEW: Mike Dotson
SITE AREA: 1 acres BUILDING AREA (qross): NfA
LOCATION: 3524 SE 5th & 3400 SE 6th St I WORK ORDER NO: 77544 [
SUMMARY OF PROPOSAL: Temporary Use Permit for the continuation of soil remediation originally undertaken under file Nos.
LUA98-136 and LUAOO-135 and LUA03-084. Activity includes ongoing removal of hydrocarbons from groundwater resulting from a
1985 valve leak west of Maplewood Park.
A. ENVIRONMENTAL IMPACT (e_g, Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housino
Air
Water
Plants ~
Land/Shoreline Use Utilities
Animals
Environmental Heallh Public SeNices
Energy!
Natural Resources
ArHggFeet
B. POLICY-RELA TED COMMENTS
C. CODE-RELA TED COMMENTS
ith particular attention to those areas ;n which we have expertise and have identifie areas of probable impact or
needed to properly assess this proposal.
Date
NOTICE OF APPLICATION
A Master Application has been filed and accepted witll the Development Services Division of the City (If Renton.
TI'111 following briefly de5cribas the applicati<ln and the necessary Public Approvals.
PROJECT NAME/NUMBER: Maplewood 50,1 Redemption Temp Use Perm"t l LUAoe·01 0, TP
PROJECT DESCRIPTION: Ternp0rllry Use Penn,! for the continuation 01 SOil remediation on91nally
.... ndertakan under File Nos. LUA9B-136, LUAOO-135 and LUA03_0B4 Activity Incl~'des ongomg removal oj hydrocarbons
from g-ourldwater resulting from a 1985 valve le~k west of Maplewood Park.
PROJECT LOCATION: 3524 SE 5'" SI. Maplewood Park, and 3400 SE 6'" 51
PUBLIC APPROVALS: NfA
APPliCANT/PROJECT CONTACT PERSON Ne~ Norcross, tel 425·235-7743
COrT,ments on the abo~e applicatiOn mUSl be submttad In Writing to Keri Weallar, Project Manager. Dellelopment Services
DiviSion, t 055 South Grady Way, Renton, WA 96055, by 5.00 PM on March 3, 2006, 11 you have questions about this
proposal, or wish to be made a party of record and receille additional notification by mail. contact the Project Manager at
(425) 430·7382. Anyone who submits wntten comments will automatically become a party of record and will be noll/ie\! 01
any deCISion on this proj&cl.
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
DATE OF APPLICATION:
NOTICE OF COMPLETE APPLICATION:
February 7, 2006
February 17, 2006
, ...... '"" r·,. ""'-_""",..." ,. -"' .. " ,,,""'" .... .-,-~, ~~o{U
""'"'_"",",""ox.o",,~'".
~~:.:: __ -: .. ~ M~"
, ''''"'_'~'''_w_,~. __ , , ... ,.~.,~".,~,~-,-",."
If you wouid like to be made a party 01 record to receive further Intormetior on thiS proposed project, complete nils form
and ret'Jrn to City of Renton, Development Planning. 1055 Sowtn Grady Way, Renton, WA 98055
F.te Name! No Maplewood Soil Redemption Temp Use Permit! LUAOe·Ql0, TP
NAME
ADDRESS
TELEPHONE NO. ____________ _
CERTIFICA TION
I, Derek. Jo • .".{" , hereby certify that:3 copies of the above document
were posted by me in ~ conspicuous places or nearby the described property on
SIGNED:_D..k:::...J(Q~L,,-", ______ =~ __ _ r
ATTEST: Subscribed and sworn ~e,fore me, a Notary Public, in and for the State Of~~h)gt~n ,~esiding in
kLJOv((oJp ,onthe '2~~day {2.b 200/ Ot{t/llfd-------
CHARLES F. KOKKO NOTARY PUBLIC SIGNATURE:
NOTARY PUBLIC
STATE OF WASHINGTON
COMMISSION EXPIRES
MARCH 19,2006
A Master Application has been filed and accepted with the Development Services Division of the City of Renton.
The following briefly describes the application and the necessary Public Approvals.
PROJECT NAME/NUMBER: Maplewood Soil Redemption Temp Use Permit/ LUA06-010, TP
PROJECT DESCRIPTION: Temporary Use Permit for the continuation of soil remediation originally
undertaken under File Nos. LUA98-i36, LUAOO-135 and LUA03-084. Activity includes ongoing removal of hydrocarbons
from groundwater resulting from a 1985 valve leak west of Maplewood Park.
PROJECT LOCATION: 3524 SE 5th St. Maplewood Park, and 3400 SE 6th St
PUBLIC APPROVALS: N/A
APPLICANT/PROJECT CONTACT PERSON: Neil Norcross, tel: 425-235-7743
Comments on the above application must be submitted in writing to Keri Weaver, Project Manager. Development Services
Division. 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on March 3, 2006. If you have questions about this
proposal. or wish to be made a party of record and receive additional notification by mail, contact the Project Manager at
(425) 430-7382. Anyone who submits written comments will automatically become a party of record and will be notified of
any decision on this project.
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
DATE OF APPLICATION:
NOTICE OF COMPLETE APPLICATION:
DATE OF NOTICE OF APPLICATION:
w_. + T'i;ST'Il (.<p." '9'8) §P_'. SIJ;, POOBE: (..,.", '~98)
M<N<ITORI»G ww. (C<. ..... PfC P'PE u'E COWP......-j
... ~ SPAACING ""-cL
". ~ffiI.lONITOltING"ELL
'0", "ONITO~'HG WEll NOT lQ(:l."(Q I~ ,~.~
;:'''0> Clrr Qf" ~ENTtm WELL
IIW_'", -.-.00"£0 "ECOlE .... \o£U.
--' ""-""'OONEO "-'PO. =<M' .... s.,.,;rEw
..... FOR"ER p~ooucr SUP
No, .. , '"' I""",;"". 01 ." 1"",",<. ,_own 0" OP"'"~""""
1. TP_l ... ,.,,,.,.d 0 tho '0""" ',,",,'.oo~, ,~_II
"" ...... _,,-
February 7, 2006
February 17, 2006
February 17. 2006
""'., .. 7ft!
OPLC ....,...,. 00<_""" '",",fIll
''''''''' ~"""" Pft '"'" _~_
" .... -"~ ..... -. ..,,;;: .....
1 .". '/C'!" """" 0' •
"'"0::,<>00
Cou""
NEtGHBORHOOD
DETAIL MAP . ,
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton , Development Planning, 1055 South Grady Way, Renton. WA 98055.
File Name / No.: Maplewood Soil Redemption Temp Use Permit f LUA06-01 0, TP
NAME:
ADDRESS· ________________________________________________________________ ___
TELEPHONE NO.: __________________________ __
CITY F RENTON
Planning/Building/Public Works Department
Gregg Zimmerman P.E., Administrator
February 17, 2006
Neil Norcross
Olympic Pipeline Company
2319 Lind Ave SW
Renton W A 98055
Subject: Maplewood Soil Redemption Temporary Use Permit
LUA06-010, TP
Dear Mr. Norcross:
The Development Planning Section of the City of Renton has determined that the
subject application is complete according to submittal requirements and, therefore, is
accepted for review.
You will be notified if any additional information is required to continue processing your
application.
Please contact me at (425) 430-7382 if you have any questions.
Sincerely,
~
Keri Weaver
Senior Planner
--------------lo-S-S-s-ou-th-G--ra-dy--W-ay--.R-e-n-to-n-,W--M-h-in-~-o-n-9-8-0S-S-------------~
CSi2) Th,; oaoer contains 50% recvcled matenal. 30% oost consumer
AHEAD OF THE CL:RVl:.
UJ+arolo
City of Renton
LAND USE PERMIT FEB-12006
RECEIVED MASTER APPLICATION
PROPERTY OWNER(S) PROJECT INFORMATION
NAME: City of Renton PROJECT OR DEVELOPMENT NAME: Remediation System
Maplewood Historic Fuel Release -Olympic Pipe Line Co.
ADDRESS: 1055 Grady Way
PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE: 3524
SE 5th Street, Maplewood Park and 3400 SE 6~ Street.
CITY: Renton ZIP: 98055
TELEPHONE NUMBER: KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): 162-
305-912907 and 162-305-906602
APPLICANT (if other than owner)
NAME: Neil Norcross EXISTING LAND USE(S): Residential Park and Utility Right-
of-Way
COMPANY (if applicable): Olympic Pipe Line PROPOSED LAND USE(S): No Proposed Changes
Company
ADDRESS: 2319 Lind Ave SW EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
Residential single family.
CITY: Renton ZIP: 98055 PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION
(if applicable): Not Applicable
TELEPHONE NUMBER 425-235-7743
EXISTING ZONING: R-8
CONTACT PERSON PROPOSED ZONING (if applicable): Not Applicable
NAME: Same as Applicant SITE AREA (in square feet): 1 acre
SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE
COMPANY (if applicable): DEDICATED: Not Applicable
SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS:
ADDRESS: Not Applicable
PROPOSED RESIDENTIAL DENSITY IN UNITS PER NET
CITY: ZIP:
ACRE (if applicable): Not Applicable
NUMBER OF PROPOSED LOTS (if applicable): Not
TELEPHONE NUMBER AND E-MAIL ADDRESS:
Applicable
NUMBER OF NEW DWELLING UNITS (if applicable): Not
Applicable
Q: web/pw idevservifonnsiplanni n gimastcra pp. doc 01110/06
PRO CT INFORMATION (continu )L-______ --,
NUMBER OF EXISTING DWELLING UNITS (if applicable): PROJECT VALUE: (Extensionbfprevious Land Use Permit)
Not Applicable
SQUARE FOOTAGE OF PROPOSED RESIDENTIAL
BUILDINGS (if applicable): Not Applicable
SQUARE FOOTAGE OF EXISTING RESIDENTIAL
IS THE SITE LOCATED IN ANY TYPE OF
ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE
SQU~ FOOTAGE (if applicable):
BUILDINGS TO REMAIN (if applicable): Not Applicable ..t"AQUIFER PROTECTION AREA ONE
SQUARE FOOTAGE OF PROPOSED NON-RESIDENTIAL o AQUIFER PROTECTION AREA TWO
BUILDINGS (if applicable): Not Applicable
o FLOOD HAZARD AREA
SQUARE FOOTAGE OF EXISTING NON-RESIDENTIAL
BUILDINGS TO REMAIN (if applicable): Not Applicable o GEOLOGIC HAZARD
NET FLOOR AREA OF NON-RESIDENTIAL BUILDINGS (if o HABITAT CONSERVATION
applicable): Not Applicable o SHORELINE STREAMS AND LAKES
NUMBER OF EMPLOYEES TO BE EMPLOYED BY THE
NEW PROJECT (if applicable): Not Applicable o WETLANDS
LEGAL DESCRIPTION OF PROPERTY
___ sq. ft.
___ sq. ft.
___ sq. ft.
___ sq. ft.
___ sq. ft.
(Attach legal description on separate sheet with the following information included)
SITUATE IN THE SW/SE QUARTER OF SECTION.1Q, TOWNSHIP 23 N, RANGE R 5 E, IN THE CITY OF
RENTON, KING COUNTY, WASHINGTON.
TYPE OF APPLICATION & FEES
List all land use applications being applied for:
1. Temporary Use Permit 3.
2. 4.
Staff will calculate applicable fees and postage: $ ___ _
AFFIDAVIT OF OWNERSHIP
I, (Print Name/s) JJ~.I ( tJv '<.sr::)-S~. ' declare that I am (please check one) _ the current owner of the property
involved in this application or ~ the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing
statements and answers herein contained and the information herewith are in aJi respects true and correct to the best of my knowledge and belief.
I J certify that I know or have satisfactory evidence that Nt-\ \ N Q rifo0 ~ rL signed this instrument and acknowledged it to be his/her/their free and voluntary act for the
, uses and purposes mentioned in the instrument.
A"' .. =
Notary (Pnnt)_'+_-+_=--f-_-"---"'-"--'-'-'-""-'--
My appointment expires:_---'./_·":If-!--'c'--~...:,'I,L-~--'{~-~!"--' __ _
( I
Q:wcb/pwidevserv/foollS/planninglmasterapp.doc 2 01110106
Delta
Environmental
Consultants, Inc.
Solving environment-rdated business problem., worldwide
4006 148th Avenue NE
Redmond, Washington 98052 USA
425.882.3528 800.477.7411
fax 425.869.1892
February 1,2006
Laureen Nicolay
City of Renton
Division of Development Services -Land Use Permits
1055 S. Grady Way
Renton. WA 9S055
Subject:
Laureen:
Temporary Use Permit
Olympic Pipe Line Company (OPI.C)
Maplewood Site
Renton, WA
Delta Project No. G07H6-PP60-1
www.deltaenv.com
This letter and the attached documents are provided for the extension of an existing Tcmporary Cse Permit for the
maintenance of the existing south and north equipment enclosurcs at the OPLC Maplewood site located in the
southeastern portion of Maplewood Park and north of Maplewood Park on SI:: 5th Street in Renton, Washington.
Attached to rhis letter 8re the following documents:
• Suhmittal requirements
• Waiver of submittal requirements form
• One copy of PMT reductions of drawings included with the application
• Check fix S 100.00
As a separate package, we arc enclosing five sets of the following documents:
• Land lise permit master application
• Site narrative
• Ncighborhood details (figure I)
• Site and utilities plan (figure 5)
• Proper1y owners list (if required)
Please fed lree (0 contact Tanya Lane regarding any questions you may have regarding (his submittal via her oftice
phone: (425) 498-7711, or cell phone: (425) 301-2741.
Sincerely,
DEL TA ENVIRONMENT AI, CONSULTANTS, INC
I~R.,~ (F'I<:$VN 1-1tCd
Eric Larsen, LH.G. -~
Senior Proj ect Manager
ee: Tonya Lane, Delta/Seattle
Eric Buckler, Delta/Seattle
'-' ~ " ..... , , ........ , ~ , ...... " r.l!::Jl/tjl
ABATEMENT AGREEMENT
TEMPORARY USE OEVELOPME~
rrTY OFqj IJrANNING .. __________________________ r,ON
city of Remon Development Services Division
1055 South Grady Way, Renlon, WA 96055
Phone: 425-430-7200 Fax: 425-430-7231
FEB -72006
RECEIVED
I, _.LN,.,e",-i:..../ ""N"'oa.<-=,,"""' ... Sl--____________ being the Applic;ant for the TemporEIIY Use
Permit at the location of:
hereby authorize the City of Renton to summarily eliminate the Temporary Use and all evidence of the use if
H has nol been removed as required by the lenns of the permit. I also agree to reimburse the City for any
expense incurred in abating this Temporary Use,
Signature; 711 Ancvvs=}-
Print Name:
Date:
STATE OF WASHINGTON )
)SS
COUNTY OF KING )
I certify that I ~now or have satisfactory evidence that 0 c-, ~ tVa .-c..ro<:, <:. signed
this instrument and acknowledged it to be hislherltheir free and voluntary act for the uses and purposes
mentioned in the instrument.
Dated:
" in and for the state of Washington
Notary: (Print) 1,1;{ . Ic,/ i; '" )(~
My appointment expires:
Q;\WEBIPWlDEVSERVlFonnslPlanning\lcmpuse.doc09/0S/03 9
TOTAL P.01
DEVELOPMENT SERVICES DIVISION
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
LAND USE PERMIT SUBMITTAL WAIVED MODIFIED COMMENTS: REQUIREMENTS: BY: BY:
Calculations 1
Colored Maps for Display 4
Construction Mitigation Description 2 AND 4 ~
Deed of Right-of-Way Dedication 2
Density Worksheet 4
Drainage Control Plan 2 \ hL
Drainage Report 2 II} Ii -J-.-
Elevations, Architectural, AND 4 ~. tbl
Environmental Checklist, ;)-p.
Existing Covenants (Recorded Copy) 4
Existing Easements (Recorded Copy) 4
Flood Hazard Data 4 Sll
Floor Plans 3 AND 4 0R
Geotechnical Report 2ANO' 0CbZ
Grading Plan, Conceptual 2
Grading Plan, Detailed 2
Habitat Data Report 4 \'Jl
Improvement Deferral 2
Irrigation Plan 4
King County Assessor's Map Indicating Srte 4
Landscape Plan, Conceptual,
Landscape Plan, Detailed 4
Legal Description 4
List of Surrounding Property Owners 4
Mailing Labels for Property Owners 4
Map of Existing Site Conditions 4
Master Application Form 4
Monument Cards (one per monument) 1
Neighborhood Detail Map 4
This requirement may be waived by:
1. Property Services Section
2. Public Works Plan Review Section
PROJECT NAME: ----'MAf-'--"'t""I~="--------
3. Building Section DATE: ____________________ __
4. Development Planning Section
Q:\WEB\PW\DEVSERv\Forms\Planning\waiver.xls 11/04/2005
DEVELOPMENT SERVICES DIVISION
WAIVER OF SUBMITIAL REQUIREMENTS
FOR LAND USE APPLICATIONS
LAND USE PERMIT SUBMITTAL WAIVED MODIFIED COMMENTS: REQUIREMENTS: BY: BY:
Parking, Lot Coverage & Landscaping Analysis.
Plan Reductions (PMTs).
Plat Name Reservation.
Postage.
Preapplication Meeting Summary •
Pu blic Works Approval Letter,
Rehabilitation Plan,
Screening Detail ,
Site Plan 2 AND.
Stream or Lake Study, Standard.
Stream or Lake Study, Supplemental,
Stream or Lake Mitigation Plan.
Street Profiles 2
Title Report or Plat Certificate 4
Topography Map J
TraffIC Study 2
Tree Cutting/Land Clearing Plan. <~J)
Urban Center Design Overlay District Report 4
Utilities Plan, Generalized 2
Wetlands Mitigation Plan, Final 4
Wetlands Mitigation Plan, Preliminary 4
Wetlands Report/Delineation, (:-,y
Wireless:
Applicant Agreement Statement 2 AND J
Inventory of Existing Sites 'AND'
Lease Agreement, Draft 2 AND J
Map of Existing Site Conditions 2 AND J
Map of View Area, AND'
Photosimulations 'AND J
This requirement may be waived by:
1. Property Services Section PROJECTNAME: __________________________ __
2. Public Works Plan Review Section
3. Building Section DATE: ________________________ __
4. Development Planning Section
Q:\WEB\PW\OEVSERv\Forms\Planning\waiver.xls 11104/2005
SITE NARRATIVE
FEB -7 2006
RECEIVED
A fuel leak at the OPLC Maplewood block valve site circa 1985 resulted in a
series of environmental site assessments to assess the potential impacts of the incident.
The assessments indicated that weathered gasoline-and diesel-range petroleum
hydrocarbons from the leak were present in groundwater and in soil within the zone of
water table fluctuation beneath a portion of the surrounding neighborhood. OPLC
instituted a remediation program that, based on recent groundwater monitoring data, has
resulted in the reduction of the extent of groundwater impacts at concentrations greater
than the Model Toxics Control Act [MTCA 1 Method A cleanup criteria.
Benzene concentrations in groundwater are provided in Figure 2. The plume of
gasoline-range petrolewn hydrocarbons in excess of MTCA Method A criteria has been
reduced from approximately 1,200 feet in length to approximately 150 feet in length
(along the primary axis to the west-southwest, in the direction of groundwater flow)
(Figure 3). The 2005 plume width was roughly 75 feet along its secondary axis
perpendicular to the groundwater flow direction. No measurable free product has been
encountered during these monitoring events.
Diesel-range petroleum hydrocarbon impacts to groundwater above MTCA
Method A eleanup criteria is contained in three groundwater "pockets". These pockets
are locatcd near wells MW-25 and MW-50 to the west; wells MW-13, MW-14 and MW
16 in the central portion of the site; and wells MW-IS, MW-19, and MW-20 in the
eastern portion of the site (Figure 4). Monitoring wells around the periphery of these
pockcts have demonstrated petroleum hydrocarbon values below Method A cleanup
levels. This observation is anticipated and consistent with continued degradation of the
TPH-D impact to the groundwater by chemical and biological mechanisms related to air
sparging and soil vapor extraction.
The physical componcnts of the remediation system include two equipment
enclosures constructed in November 1998. The enclosures are approximately 400 square
feet each and contain the aboveground treatment equipment. The northern equipment
enclosure is situated adjacent to the west side of the existing OPLC block valve
enclosure. The southern equipment enclosure is situated west of the existing playground
in Maplewood Park. The equipment enclosures consist of a concrete pad surrounded by
an 8-foot high chain-link fence with sight-obscuring slats. Remediation equipment
within these enclosures runs near continuously. Measures have been taken to control the
level of sound to the extent possible.
Air sparging is the primary method for cleanup of residual fuel at the site. Air
sparging is the controlled injection of air below the water table to treat residual volatile
and biodegradable hydrocarbons in groundwater as well as soil in the water table zone.
The relatively permeable soil types beneath the site are favorable for air sparging.
The air sparging system consists of a series of 2-inch diameter vertical air
sparging wells located within the block valve property (at 3524 Southeast 5th Street), the
north and west sides of Maplewood Park (3400 Southeast 6th Street) and next to the
eastern curb of Newport Avenue southeast (between 3330Newport Avenue Southeast and
3400 Southeast 6th Street). The air sparging wells are about 25 feet deep. The well
monuments are flush with the ground surface, or covered with sod.
The low concentrations of volatile hydrocarbon vapors generated by the air
sparging will continue to be collected through a series of2-inch diameter vapor
extraction wells. Recovered vapors will continue to be routed via underground piping to
a IS-foot-high vent stack situated in the northern equipment enclosure. A Notice of
Construction Permit from the Puget Sound Clean Air Agency exists for the operation of
the vapor recovery system (Order of Approval #7602).
The vapor extraction wells are connected via shallow underground piping (2 to 4
feet below the ground surface) to air compressors situated in the above ground treatment
equipment enclosures. The underground piping is located beneath the following area: (l)
the southern margin of the block valve property, (2) Southeast 5th Street between the
block valve property and Maplewood Park, (3) the north and west sides of Maplewood
Park and (4) the grassed planter strip on the east side of Newport Avenue Southeast
(between 3330 Newport Avenue Southeast and 3400 Southeast 6th Street) (Figure 5).
The remediation system described above began operating in December of 1998
and has generally functioned continuously since. The system will continue to operate
until soil and groundwater impacts are reduced to a level that meets the MTCA Method A
cleanup criteria. Progress has been made, particularly with regard to the reduction of
gasoline-range hydrocarbon impacts to groundwater. The next phase of operations,
estimated to require an additional 2 years to complete, is expected to bring the site to
closure. Once the cleanup is complete and a closure argument has been accepted, the
system will be decommissioned and the equipment enclosures and their contents will be
removed. Until that time, groundwater monitoring will continue to be performed
throughout the neighborhood to evaluate the effectiveness of the remediation system and
to confirm that the system is effectively removing petroleum impacts to the subsurface.
A Temporary Use Permit is being requested to maintain the use of the existing
south and north equipment enclosures in the southeastern portion of the Maplewood Park,
and just north of Maplewood Park across SE 5th Street next to the Olympic Pipe Line
Company (OPLC) block valve enclosure (Figure I). Both remediation equipment
enclosures are located in an R8 zoned area. The Temporary Use Permit LUA-03-084-TP
was issued on September 18, 2003. The permit has expired; however, OPLC is
requesting continued operation of the remediation system at the site at least through 2007
to permit the development of a site closure argument.
Modifications to the existing system are currently being evaluated to target
residual groundwater impacts at the Maplewood site. These modifications have included
the addition of three sparge wells near the north equipment enclosure that will be
accessed via existing conduit as part of an ozone sparge pilot test. The effectiveness of
ozone in breaking down the residual groundwater impact will be evaluated as part of a
process to bring the Maplewood site remediation to closure. The modifications under
consideration will not require any build-outs or changes in the footprint of the north and
south enclosures. The transportation of waste or materials to or from the site is not done
on a regular basis as part of the remediation system operation. The operation of the
remediation system has not affected use of the park, and modifications to the system will
continue to avoid doing so.
Legend
D Remediation System Enclosure
C Site-outline
N
o 50 100 200 W+E
Feet S
FIGURE 1 DEVELOPM
Neighborhood Detail Map r;11Yoff~r0-~NING
Maplewood Incident
Renton, Washington
F£8 ,_
FI,
G07H6-PP60-1 , ... _--------:----l
PR-1()€"Fig1 .mxd '
01 /05/06
I
OPLC I " Delta
Maplewood M .. ~~~i:~:'~n~~~~:l~
200(;
1)
i"')
/ JJO!~ /
",j \
\
1 loot ';CJ1l
i , ,
±
\ \
if' NE WP OR T II VE s f
·0-
U ' ---_____ 1 if' ~ -SS ' ~~~~?~~,--~~~--~~== ---
H," .. [) t ' ' I ~:",,;~ ,,~ .,'" , . ---
22e\
, ""." "",,;:<[""-\ \ ,-------.
, 'I" ,. \ I
'\ \1 II '" " , , I
\ \ \ 5L4 ' . '
.--
.----."--r,,,-',n .... ---"-'-, ' I
. -------
:~;S~~~'~O~' ~~::::::::::~::~::::]3 if'
W.::.e \ -:-=-Nl-11 """'2 ~=;:~:::==:;:,A?C 59'n~ler "".-
, t'-t'· .. t \ ' _-.-,.--0 : "'1
\
' ,.-r:"-:c', -t • . ••• • , ' . , fo' e)7oor cl 4' :'Ic""'ino 10'\ec.
2' ~ Qt> 0
:on<:re ,e 'MJ I
CQ<.!"~t"
o
------~~n --------~
e17
\ ;
\ \ \ \ \ \-y\---
, II
\ I \
." : ~ 7:, Ii 1_
M:! 'I :.... I I
~ 'I II , ,
\ I
(j)
\ r,.,')
L L ._ tonc,~~e
\
~;: ::-;~ -'~ -
rr 1 .~ I't;
,p-' -';
---------
Res:ro:;"""-"'s~~o'l P Q t~:.....-:: ___ \
\
o
, --
\
\
\
'0 '" /
3~.!! I
I
l ~-f\
, \
\
I \
. ~' dIUnlCI L-r tree
40 lut tull
-,I
r
~L
/ ."M.
, • .. Of i . ~.~ \ \ \ \~\ .~"~. \ \ \ " \ \ \ -. ... ..... • .\ \ .-' \ \ 'CPO,
;) ';'''-f' 1\ \ FIGURE 5 O"'OF~ '11li'''''
\ J).''\ \ ... ",""" ... ,," "EB // / .-, ¥Il;
Note : Reference Drawing from Geo
Engineers , September 1, 1998.
Maplewood Incide nt
Renton , Wash ington REeEI
PROJECT NO. PREPARED BY DRAWN BY
OO7H6-PP60-' EB IN A D It
DATE REVIEWED BY FILE NAME e a
PR-l06-Environmental
01/16/06 "95 'OWG ~'" Consu~an's. In c.
Printed: 02-07-2006
Payment Made:
TYOFRENTON
1055 S. Grady Way
Renton, WA 98055
Land Use Actions
RECEIPT
Permit#: LUA06-010
0210712006 11 :09 AM Receipt Number: R0600601
Total Payment: 100.00 Payee: DELTA ENVIRONMENTAL
CONSULTANTS INC
Current Payment Made to the Following Items:
Trans Account Code Description Amount
5954 604.237.00.00.0000 special Deposits 100.00
Payments made for this receipt
Trans Method Description Amount
Payment Check #489926 100.00
Account Balances
Trans Account Code Description Balance Due
3021 303.000.00.345.85 Park Mitigation Fee
5006 000.345.81.00.0002 Annexation Fees
5007 000.345.81.00.0003 Appeals/waivers
5008 000.345.81.00.0004 Binding Site/Short Plat
5009 000.345.81.00.0006 Conditional Use Fees
5010 000.345.81.00.0007 Environmental Review
5011 000.345.81.00.0008 Prelim/Tentative Plat
5012 000.345.81.00.0009 Final Plat
5013 000.345.81.00.0010 PUD
5014 000.345.81.00.0011 Grading & Filling Fees
5015 000.345.81.00.0012 Lot Line Adjustment
5016 000.345.81.00.0013 Mobile Home Parks
5017 000.345.81.00.0014 Rezone
5018 000.345.81.00.0015 Routine Vegetation Mgmt
5019 000.345.81.00.0016 Shoreline Subst Dev
5020 000.345.81.00.0017 Site Plan Approval
5021 000.345.81.00.0018 Temp Use or Fence Review
5022 000.345.81.00.0019 Variance Fees
5024 000.345.81.00.0024 Conditional Approval Fee
5036 000.345.81.00.0005 comprehensive Plan Amend
5909 000.341.60.00.0024 Booklets/ErS/Copies
5941 000.341.50.00.0000 Maps (Taxable)
5954 604.237.00.00.0000 special Deposits
5955 000.05.519.90.42.1 postage
5998 000.231.70.00.0000 Tax
Remaining Balance Due: $0.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00