Loading...
HomeMy WebLinkAboutERC Report - Exhibits cover page CITY OF RENTON DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE EXHIBITS Project Name: Earlington Townhomes Project Number: LUA17-000169, ECF, SA-H, MOD, MOD, MOD Date of Meeting May 8, 2017 Staff Contact Clark H. Close Senior Planner Project Contact Evan Mann, ESM Consulting Engineers / 33400 8th Ave S, Ste 205, Federal Way, WA 98003 Project Location 8074 S 132nd St, Renton, WA 98178 Exhibits: Exhibit 1 ERC Report Exhibit 2 Neighborhood Detail Map Exhibit 3 Overall Site Plan (PP-01) Exhibit 4 Preliminary Unit Lot Subdivision (PP-02) Exhibit 5 Boundary & Existing Conditions (PP-03) Exhibit 6 Preliminary Grading Plan (PP-04) Exhibit 7 Preliminary Road & Utility Plan (PP-05) Exhibit 8 Drainage Control Plan (PP-06) Exhibit 9 Preliminary Street Profiles (PP-07) Exhibit 10 Floor Plans (A2, B2-B7) Exhibit 11 Architectural Elevations (E1-E7) Exhibit 12 Landscape Plans (L0-L8) Exhibit 13 Rendering Exhibit 14 Tree Inventory and Retention Plan Exhibit 15 Geotechnical Engineering Feasibility Report for Earlington Townhomes prepared by Associated Earth Sciences, Inc. (dated January 18, 2017) Exhibit 16 Preliminary Technical Information Report prepared by ESM Consulting Engineers, LLC (dated March 27, 2017) Exhibit 17 Arborist Report was prepared by Shoffner Consulting (dated February 23, 2017) Exhibit 18 Wetland and Stream Reconnaissance Report for Earlington Townhomes prepared by Altman Oliver Associates, LLC (dated January 18, 2017) Exhibit 19 Traffic Impact Analysis was provided by Northwest Traffic Experts (TraffEx) (dated December 14, 2016) Exhibit 20 Construction Mitigation Description Exhibit 21 Surface Water Classifications and Wetlands Map Exhibit 22 Renton Fire Authority Memorandum: Thomas Exhibit 23 Plan Review Memorandum: Fowler Exhibit 24 Traffic Concurrency Test Memorandum: Bannwarth Exhibit 25 Advisory Notes to Applicant