Loading...
HomeMy WebLinkAboutEx22_Renton Fire Authority Memorandum_ThomasFIRE & EMERGENCY SERVICES DEPARTMENT M E M O R A N D U M DATE: April 24, 2017 TO: Clark Close, Senior Planner FROM: Corey Thomas, Plans Review Inspector SUBJECT: Earlington/Minter Townhomes Environmental Impact Comments: 1. The fire impact fees are applicable at the rate of $795.10 per townhome unit. This fee is paid at building permit issuance. Code Related Comments: 1. The fire flow requirement for the proposed townhomes is 3,750 gpm if built with non-rated construction and no fire sprinkler systems. The fire flow would drop to 1,750 with one hour rated construction and approved fire sprinkler systems (NFPA 13D type systems are acceptable). Four fire hydrants are required. One within 150-feet and three within 300-feet of each of the proposed buildings. There are some existing hydrants within 300-feet of the proposed homes. It appears water main extensions and additional hydrants will be required. Insufficient fire flow exists at this location at present time. 2. Fire department apparatus access roadways are required to be minimum 20 -feet wide fully paved, with 25-feet inside and 45-feet outside turning radius. Fire access roadways shall be constructed to support a 30-ton vehicle with 75-psi point loading. Access is required within 150-feet of all points on all buildings. Dead end streets that exceed 150-feet in length require an approved turnaround. Cul-de-sac turnarounds with 90-feet diameters are required for streets over 300-feet long. Proposed landscape islands are not allowed in the cul-de-sac.