HomeMy WebLinkAboutEx8_Drainage Control Plan (PP-06)11
0 m
d
00
ad
0
/
0
0
/
ro
M
Orn o
N
00�
E
to M
W
/ N
LZ0-
A PORTION OF THE NE 1/4 OF SEC 13, TWP 23 N., RGE 4 E., W.M.
l \ \ \ \ TMH
�\ \ TMH \
��� a JB
o / M
v
S\ 130T \\ , H ST
n
SCALE: 1 " = 40'
40 20 0 40 80
CONTOUR INTERVAL = 2'
LEGEND
D------ w-
s
NO.
w
BY
0
•
..............
EXISTING STORM DRAINAGE
EXISTING SANITARY SEWER
EXISTING WATER MAIN
PROPOSED 12"0 STORM DRAINAGE
PROPOSED BASIN LINE
TRACT J
STORM DRAINAGE FACILILTY
DETENTION REQUIRED:
DETENTION PROVIDED
WATER QUALITY REQUIRED
WATER QUALITY PROVIDED
65,000 CF
75,000 CF
4,000 CF (CARTRIDGE)
4,800 CF (CARTRIDGE)
DRAINAGE NOTES:
1. FOOTING AND ROOF DRAIN PIPES NOT SHOWN FOR
CLARITY.
2. THE GEOTECHNICAL REPORT DESCRIBES A LAYERING
OF SOIL TYPES WHICH SUGGESTS GROUND WATER
WILL DISCHARGE AT CERTAIN ELEVATIONS WITHIN THE
SITE. ADDITIONAL GROUNDWATER COLLECTION PIPES
WILL BE REQUIRED. THESE PIPES ARE NOT SHOWN
FOR CLARITY.
3. THE STORM WATER CONTROL VAULT SHALL BE
DESIGNED BY A STRUCTURAL ENGINEER.
4. THE WATER QUALITY SYSTEM WILL UTILIZE A
PROPRIETARY FILTER CARTRIDGE SYSTEM.
REVISIONS
NO.
DESCRIPTION/DATE
BY
0
FIRST SUBMITTAL
03/27/2017
ESM
0. G
OF WASH/ l
� r
FFG 24598
F /STV"
ss�ONgL
ENG�� IT
t�
3
-
U
J
M O
co
co
MLo
v -t
t
L
S Q
^
LL
Q
�
0 l
a a
Lu
U ®LOf
`
C W
U
A
�_0
C C
z
w
G
2! LO
0
W N co
oaoi
G 500
E
z
_ Q
O rn
�o
o
�>
Q
Ei-:2J
O
o
X00_
_
_0
a0
Ov _
�0
Ucou-
E
—
N
O,
L
3 3
q) � L
�O
rn3:
C
W U
•�
:
._ 7
0 0-
Z
0
Z
c/)
N
Lu�
U
J
J
O
I
Z
LLJ
z
z
2
g
0-
3:
0 -
OO
0
J
�
W
�
z
/
W
0
z
W
O0
Q
z
�
Z
w
LL
z
W
—
�
J
J
Z
m
0
Z
<
W
w
WLL.
0
0
JOB NO.:
1938-001-016
DWG. NAME:
PP -06
DESIGNED BY:
PDG
DRAWN BY:
DCL
CHECKED
BY:
DATE:
3/27/2017
DATE OF
PRINT.
PP
-06
6 OF 7 SHEETS