Loading...
HomeMy WebLinkAbout340.8f TO MF r' L_ f-'\ I N BOXES u V11114. r r«E- DRAINING GRAVEL NOTES: 1. ALL DOUBLE CHECK VALVE ASSEMBLIES (DCVA's) MUST BE LISTED ON LATEST LIST OF "BACKFLOW PREVENTION ASSEMBLIES APPROVED FOR INSTALLATION IN WASHINGTON STATE", PUBLISHED BY STATE OF WASHINGTON DEPARTMENT OF HEALTH. 2. THE OWNER/APPLICANT MUST OBTAIN A SEPARATE CITY OF RENTON PLUMBING PERMIT FOR THE INSPECTION OF THE INSTALLATION OF THE DCVA AND PIPING. THE OWNER SHALL FURNISH, INSTALL AND MAINTAIN THE DCVA AND ALL PIPING AND APPURTENANCES SHOWN ON THIS PLAN. 3. THE DCVA MUST BE TESTED BY A STATE CERTIFIED BACKFLOW ASSEMBLY TESTER AFTER ITS INITIAL INSTALLATION, AFTER REPAIRS AND ANNUALLY THEREAFTER AT OWNER'S EXPENSE. A COPY OF THE TEST REPORT SHALL BE SENT OR FAXED TO CITY OF RENTON WATER UTILITY ENGINEERING DEPT., ATTN: WATER UTILITY CROSS—CONNECTION CONTROL SPECIALIST, FAX NO. 425-430-7241. 4. DCVA AND METER BOX SHALL BE LOCATED ON PRIVATE PROPERTY AND AS NEAR AS POSSIBLE TO THE WATER METER. Y s4" TO 2" DOUBLE CHECK VALVE STD. PLAN — 340.8 n + PUBLIC WORKS ASSEMBLY FOR IRRIGATION OR 1 oI DEPARTMENT RESIDENTIAL FIRE SPRINKLER MARCH 2010