Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
EARLINGTON TOWNHOMES - 977-240-299
5/4/2017 Attendees cclose (cclose@rentonwa.gov) Ann Fowler (afowler@rentonwa.gov) lbetlach (lbetlach@rentonwa.gov) tflatley (tflatley@rentonwa.gov) aaskren (aaskren@rentonwa.gov) cparks (cparks@rentonwa.gov) bbannwarth (bbannwarth@rentonwa.gov) cthomas (cthomas@rentonrfa.org) agafour (agafour@rentonwa.gov) Documents A_Master_Land_Use_Permit_Application_Form_20170327_v1.pdf C_Letter_of_Understanding_Geologic_Risk_20170327_v1.pdf CA_Density_Worksheet_20170327_v1.pdf CM_Construction_Mitigation_Description_20170327_v1.pdf ECF_Environmental_Checklist_20170327_v1.pdf L_Draft_Legal_Documents_20170327_v1.pdf L_Plat_Certificate_Title Report_20170327_v1.pdf MAP_Neighborhood_Detail_Map_20170327_v1.pdf NOA_Affidavit_of_Installation_of_Public_Information_Sign_20170327_v1.pdf NOA_Affidavit_of_Installation_of_Public_Outreach_Sign_20170327_v1.pdf NOA_Proof_of_Neighborhood_Meeting_20170327_v1.pdf NOA_Signed_Affidavit_20170327_v1.pdf P_Architectural_Elevations_20170327_v1.pdf P_Floor_Plans_20170327_v1.pdf P_Landscape_Plan_Conceptual_20170327_v1.pdf P_Rendering_20170327_v1.pdf P_Site_Plans_20170327_v1.pdf P_Tree_Retention_Land_Clearing_Plan_20170327_v1.pdf PN_Project_Narrative_and_Modification_Requests_20170327_v1.pdf PRE_Pre-Application_Meeting_Summary_161116_v1.pdf RS_Drainage_Report_20170327_v1.pdf RS_Geotechnical_Report_20170118_v1.pdf RS_Traffic_Study_20161214_v1.pdf RS_Wetland_Assessment_20170118_v1.pdf TR_Arborist_Report_20170223_v1.pdf TR_Tree_Retention_Worksheet_20170327_v1.pdf W_Waiver_Form_20170327_v1.pdf ECF_Environmental Checklist_20170428_v2.pdf Record Message Date Time Document Page Label 1 cclose: Joined Session 4/11/2017 12:38 PM 2 cclose: Added 'A_Master_Land_Use_Permit_Application_Form_20170327_v1 .pdf' 4/11/2017 12:38 PM A_Master_Land_Use_Permit_ Application_Form_20170327_ v1.pdf 3 cclose: Added 'C_Letter_of_Understanding_Geologic_Risk_20170327_v1.pdf' 4/11/2017 12:38 PM C_Letter_of_Understanding_ Geologic_Risk_20170327_v1. pdf 4 cclose: Added 'CA_Density_Worksheet_20170327_v1.pdf'4/11/2017 12:38 PM CA_Density_Worksheet_2017 0327_v1.pdf 5 cclose: Added 'CM_Construction_Mitigation_Description_20170327_v1.pdf' 4/11/2017 12:38 PM CM_Construction_Mitigation_ Description_20170327_v1.pdf 6 cclose: Added 'ECF_Environmental_Checklist_20170327_v1.pdf' 4/11/2017 12:38 PM ECF_Environmental_Checklist _20170327_v1.pdf 7 cclose: Added 'L_Draft_Legal_Documents_20170327_v1.pdf'4/11/2017 12:38 PM L_Draft_Legal_Documents_20 170327_v1.pdf 8 cclose: Added 'L_Plat_Certificate_Title Report_20170327_v1.pdf' 4/11/2017 12:38 PM L_Plat_Certificate_Title Report_20170327_v1.pdf 9 cclose: Added 'MAP_Neighborhood_Detail_Map_20170327_v1.pdf' 4/11/2017 12:38 PM MAP_Neighborhood_Detail_M ap_20170327_v1.pdf 10 cclose: Added 'NOA_Affidavit_of_Installation_of_Public_Information_Sign_20 170327_v1.pdf' 4/11/2017 12:38 PM NOA_Affidavit_of_Installation_ of_Public_Information_Sign_2 0170327_v1.pdf 11 cclose: Added 'NOA_Affidavit_of_Installation_of_Public_Outreach_Sign_2017 0327_v1.pdf' 4/11/2017 12:38 PM NOA_Affidavit_of_Installation_ of_Public_Outreach_Sign_201 70327_v1.pdf 12 cclose: Added 'NOA_Proof_of_Neighborhood_Meeting_20170327_v1.pdf' 4/11/2017 12:38 PM NOA_Proof_of_Neighborhood _Meeting_20170327_v1.pdf 13 cclose: Added 'NOA_Signed_Affidavit_20170327_v1.pdf'4/11/2017 12:38 PM NOA_Signed_Affidavit_20170 327_v1.pdf Message Date Time Document Page Label 14 cclose: Added 'P_Architectural_Elevations_20170327_v1.pdf'4/11/2017 12:38 PM P_Architectural_Elevations_2 0170327_v1.pdf 15 cclose: Added 'P_Floor_Plans_20170327_v1.pdf'4/11/2017 12:38 PM P_Floor_Plans_20170327_v1. pdf 16 cclose: Added 'P_Landscape_Plan_Conceptual_20170327_v1.pdf' 4/11/2017 12:38 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 17 cclose: Added 'P_Rendering_20170327_v1.pdf'4/11/2017 12:38 PM P_Rendering_20170327_v1.p df 18 cclose: Added 'P_Site_Plans_20170327_v1.pdf'4/11/2017 12:38 PM P_Site_Plans_20170327_v1.p df 19 cclose: Added 'P_Tree_Retention_Land_Clearing_Plan_20170327_v1.pdf' 4/11/2017 12:38 PM P_Tree_Retention_Land_Clea ring_Plan_20170327_v1.pdf 20 cclose: Added 'PN_Project_Narrative_and_Modification_Requests_20170327 _v1.pdf' 4/11/2017 12:38 PM PN_Project_Narrative_and_M odification_Requests_201703 27_v1.pdf 21 cclose: Added 'PRE_Pre-Application_Meeting_Summary_161116_v1.pdf' 4/11/2017 12:38 PM PRE_Pre-Application_Meeting _Summary_161116_v1.pdf 22 cclose: Added 'RS_Drainage_Report_20170327_v1.pdf'4/11/2017 12:39 PM RS_Drainage_Report_201703 27_v1.pdf 23 cclose: Added 'RS_Geotechnical_Report_20170118_v1.pdf'4/11/2017 12:39 PM RS_Geotechnical_Report_201 70118_v1.pdf 24 cclose: Added 'RS_Traffic_Study_20161214_v1.pdf'4/11/2017 12:39 PM RS_Traffic_Study_20161214_ v1.pdf 25 cclose: Added 'RS_Wetland_Assessment_20170118_v1.pdf'4/11/2017 12:39 PM RS_Wetland_Assessment_20 170118_v1.pdf 26 cclose: Added 'TR_Arborist_Report_20170223_v1.pdf'4/11/2017 12:39 PM TR_Arborist_Report_2017022 3_v1.pdf Message Date Time Document Page Label 27 cclose: Added 'TR_Tree_Retention_Worksheet_20170327_v1.pdf' 4/11/2017 12:39 PM TR_Tree_Retention_Workshe et_20170327_v1.pdf 28 cclose: Added 'W_Waiver_Form_20170327_v1.pdf'4/11/2017 12:39 PM W_Waiver_Form_20170327_v 1.pdf 29 cclose: Left Session 4/11/2017 12:47 PM 30 cclose: Joined Session 4/11/2017 12:50 PM 31 cclose: Set status to Reviewing 4/11/2017 12:50 PM 32 cclose: Left Session 4/11/2017 12:50 PM 33 Ann Fowler: Joined Session 4/12/2017 2:18 PM 34 Ann Fowler: Set status to Reviewing 4/12/2017 2:18 PM 35 Ann Fowler: Set status to Waiting 4/12/2017 2:18 PM 36 Ann Fowler: Set status to Reviewing 4/12/2017 2:29 PM 37 Ann Fowler: Left Session 4/12/2017 3:00 PM 38 lbetlach: Joined Session 4/12/2017 3:33 PM 39 lbetlach: Set status to Reviewing 4/12/2017 3:33 PM 40 lbetlach: Set status to Waiting 4/12/2017 3:34 PM 41 lbetlach: Set status to Reviewing 4/12/2017 3:34 PM 42 lbetlach: Set status to Finished 4/12/2017 3:34 PM 43 lbetlach: Set status to Waiting 4/12/2017 3:34 PM 44 lbetlach: Set status to Reviewing 4/12/2017 3:34 PM 45 lbetlach: Set status to Reviewing 4/12/2017 3:34 PM 46 lbetlach: Set status to Finished 4/12/2017 3:34 PM 47 lbetlach: Set status to Reviewing 4/12/2017 3:34 PM 48 lbetlach: Set status to Waiting 4/12/2017 3:34 PM 49 lbetlach: Set status to Reviewing 4/12/2017 3:34 PM 50 lbetlach: Set status to Finished 4/12/2017 3:34 PM 51 lbetlach: Set status to Reviewing 4/12/2017 3:40 PM 52 lbetlach: Set status to Finished 4/12/2017 3:42 PM 53 lbetlach: Left Session 4/12/2017 4:08 PM 54 tflatley: Joined Session 4/13/2017 5:14 PM 55 tflatley: Set status to Reviewing 4/13/2017 5:14 PM Message Date Time Document Page Label 56 tflatley: Left Session 4/13/2017 5:22 PM 57 tflatley: Joined Session 4/14/2017 3:52 PM 58 tflatley: Add Text Box 4/14/2017 3:58 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 59 tflatley: Edit Text Box (Landscape Plans do not show any details in the right ow way such as overhead utilities, street lights, fire hydrants.) 4/14/2017 3:59 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 60 tflatley: Add Text Box 4/14/2017 4:00 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 61 tflatley: Edit Text Box 4/14/2017 4:02 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 62 tflatley: Add Text Box 4/14/2017 4:02 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 63 tflatley: Edit Text Box (Required to show overhead utilities, street lights and other infrastructure on the landscape plan. There are overhead utilitiy lines along S. 132nd Street.) 4/14/2017 4:02 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 64 tflatley: Delete Text Box 4/14/2017 4:02 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 65 tflatley: Edit Text Box 4/14/2017 4:03 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 66 tflatley: Add Text Box 4/14/2017 4:03 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 67 tflatley: Edit Text Box (Landscape Plans do not show any details in the right ow way such as overhead utilities, street lights, fire hydrants.) 4/14/2017 4:03 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 68 tflatley: Move Text Box 4/14/2017 4:03 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 69 tflatley: Delete Text Box 4/14/2017 4:03 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 Message Date Time Document Page Label 70 tflatley: Add Text Box 4/14/2017 4:04 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 8 71 tflatley: Edit Text Box (Do not use oak as a street tree in Renton. Along Renton Avenue please install Ginkgos. Along 132nd Street please install small-maturing trees that will remain below the electrical lines, for example, Snow Cloud Serviceberry.) 4/14/2017 4:06 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 8 72 tflatley: Add Length Measurement (720.09)4/14/2017 4:07 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 73 tflatley: Delete Length Measurement 4/14/2017 4:07 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 74 tflatley: Add Length Measurement (720.09)4/14/2017 4:09 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 75 tflatley: Recalculate Measurements 4/14/2017 4:17 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 76 tflatley: Add Length Measurement (723.35)4/14/2017 4:17 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 77 tflatley: Add Length Measurement (397.70)4/14/2017 4:19 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 7 78 tflatley: Add Length Measurement (711.57)4/14/2017 4:21 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 6 79 tflatley: Add Length Measurement (4 ft)4/14/2017 4:23 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 80 tflatley: Add Length Measurement (34 ft)4/14/2017 4:23 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 81 tflatley: Add Length Measurement (37 ft)4/14/2017 4:23 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 Message Date Time Document Page Label 82 tflatley: Add Length Measurement (311 ft)4/14/2017 4:24 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 83 tflatley: Add Length Measurement (716.46)4/14/2017 4:26 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 3 84 tflatley: Delete Length Measurement 4/14/2017 4:27 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 85 tflatley: Delete Length Measurement 4/14/2017 4:27 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 86 tflatley: Delete Length Measurement 4/14/2017 4:27 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 7 87 tflatley: Delete Length Measurement 4/14/2017 4:28 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 88 tflatley: Delete Length Measurement 4/14/2017 4:28 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 89 tflatley: Delete Length Measurement 4/14/2017 4:28 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 90 tflatley: Delete Length Measurement 4/14/2017 4:28 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 3 91 tflatley: Delete Length Measurement 4/14/2017 4:28 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 1 92 tflatley: Delete Length Measurement 4/14/2017 4:28 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 6 93 tflatley: Add Text Box 4/14/2017 4:42 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 3 94 tflatley: Edit Text Box (No oaks as street trees. Use only Ginkgo along Renton Avenue) 4/14/2017 4:43 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 3 Message Date Time Document Page Label 95 tflatley: Paste 4/14/2017 4:44 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 4 96 tflatley: Move Markups 4/14/2017 4:44 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 4 97 tflatley: Paste 4/14/2017 4:44 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 98 tflatley: Move Text Box 4/14/2017 4:44 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 5 99 tflatley: Paste 4/14/2017 4:44 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 6 100 tflatley: Move Text Box 4/14/2017 4:44 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 6 101 tflatley: Edit Text Box (No oaks as street trees. Use only small-maturing trees along 132nd Street Recommend Snow Cloud Serviceberry) 4/14/2017 4:46 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 6 102 tflatley: Paste 4/14/2017 4:46 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 7 103 tflatley: Move Text Box 4/14/2017 4:46 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 7 104 tflatley: Paste 4/14/2017 4:47 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 105 tflatley: Move Text Box 4/14/2017 4:47 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 106 tflatley: Paste 4/14/2017 4:47 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 7 107 tflatley: Move Text Box 4/14/2017 4:47 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 7 Message Date Time Document Page Label 108 tflatley: Paste 4/14/2017 4:47 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 109 tflatley: Move Text Box 4/14/2017 4:47 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 110 tflatley: Add Text Box 4/14/2017 4:48 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 111 tflatley: Edit Text Box (All Street Trees: At least: 40 feet from street intersections) 4/14/2017 4:49 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 112 tflatley: Edit Text Box (All Street Trees: At least: 40 feet from street intersections or stop signs 30 feet from street lights/utility poles 6 feet from fire hydrants 60 feet on-center) 4/14/2017 4:50 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 113 tflatley: Move Text Box 4/14/2017 4:50 PM P_Landscape_Plan_Conceptu al_20170327_v1.pdf 9 114 tflatley: Set status to Finished 4/14/2017 4:50 PM 115 tflatley: Left Session 4/14/2017 4:50 PM 116 aaskren: Joined Session 4/17/2017 11:53 AM 117 aaskren: Set status to Reviewing 4/17/2017 11:53 AM 118 aaskren: Set status to Finished 4/17/2017 12:21 PM 119 aaskren: Left Session 4/17/2017 12:21 PM 120 cparks: Joined Session 4/20/2017 10:46 AM 121 cparks: Set status to Reviewing 4/20/2017 10:53 AM 122 cparks: Set status to Waiting 4/20/2017 10:53 AM 123 cparks: Set status to Reviewing 4/20/2017 10:54 AM 124 cparks: Set status to Waiting 4/20/2017 10:56 AM 125 cparks: Set status to Reviewing 4/20/2017 1:16 PM 126 cparks: Set status to Finished 4/20/2017 1:59 PM 127 cparks: Left Session 4/20/2017 1:59 PM Message Date Time Document Page Label 128 Ann Fowler: Joined Session 4/21/2017 10:26 AM 129 Ann Fowler: Left Session 4/21/2017 10:55 AM 130 Ann Fowler: Joined Session 4/21/2017 12:43 PM 131 Ann Fowler: Add Length Measurement (35'-7")4/21/2017 3:43 PM P_Site_Plans_20170327_v1.p df 5 132 Ann Fowler: Delete Length Measurement 4/21/2017 3:43 PM P_Site_Plans_20170327_v1.p df 5 133 Ann Fowler: Add Length Measurement (91'-10")4/21/2017 3:43 PM P_Site_Plans_20170327_v1.p df 5 134 Ann Fowler: Edit Length Measurement (89'-11")4/21/2017 3:44 PM P_Site_Plans_20170327_v1.p df 5 135 Ann Fowler: Left Session 4/21/2017 3:51 PM 136 Ann Fowler: Joined Session 4/21/2017 3:52 PM 137 Ann Fowler: Reconnected 4/24/2017 7:59 AM 138 Ann Fowler: Delete Length Measurement 4/24/2017 7:59 AM P_Site_Plans_20170327_v1.p df 5 139 bbannwarth: Joined Session 4/24/2017 8:59 AM 140 cthomas: Joined Session 4/24/2017 9:03 AM 141 cthomas: Set status to Reviewing 4/24/2017 9:04 AM 142 lbetlach: Joined Session 4/24/2017 9:07 AM 143 lbetlach: Set status to Reviewing 4/24/2017 9:07 AM 144 lbetlach: Set status to Waiting 4/24/2017 9:07 AM 145 lbetlach: Set status to Reviewing 4/24/2017 9:07 AM 146 lbetlach: Set status to Finished 4/24/2017 9:07 AM 147 lbetlach: Set status to Reviewing 4/24/2017 9:07 AM 148 lbetlach: Set status to Finished 4/24/2017 9:07 AM 149 lbetlach: Left Session 4/24/2017 9:08 AM 150 cthomas: Set status to Finished 4/24/2017 10:23 AM 151 cthomas: Left Session 4/24/2017 10:23 AM Message Date Time Document Page Label 152 Ann Fowler: Add Area Measurement (15,827 sf)4/24/2017 11:31 AM P_Site_Plans_20170327_v1.p df 5 153 Ann Fowler: Delete Area Measurement 4/24/2017 11:32 AM P_Site_Plans_20170327_v1.p df 5 154 bbannwarth: Add Length Measurement (4.1 ft)4/24/2017 11:40 AM P_Site_Plans_20170327_v1.p df 1 155 bbannwarth: Add Length Measurement (4.5 ft)4/24/2017 11:40 AM P_Site_Plans_20170327_v1.p df 1 156 bbannwarth: Move Length Measurement 4/24/2017 11:40 AM P_Site_Plans_20170327_v1.p df 1 157 bbannwarth: Delete Length Measurement 4/24/2017 11:40 AM P_Site_Plans_20170327_v1.p df 1 158 bbannwarth: Delete Length Measurement 4/24/2017 11:40 AM P_Site_Plans_20170327_v1.p df 1 159 bbannwarth: Add Length Measurement (5.5 ft)4/24/2017 11:41 AM P_Site_Plans_20170327_v1.p df 1 160 bbannwarth: Add Length Measurement (4.9 ft)4/24/2017 11:41 AM P_Site_Plans_20170327_v1.p df 1 161 bbannwarth: Delete Length Measurement 4/24/2017 11:41 AM P_Site_Plans_20170327_v1.p df 1 162 bbannwarth: Delete Length Measurement 4/24/2017 11:42 AM P_Site_Plans_20170327_v1.p df 1 163 bbannwarth: Add Length Measurement (6.9 ft)4/24/2017 11:50 AM P_Site_Plans_20170327_v1.p df 4 164 bbannwarth: Add Length Measurement (3.2 ft)4/24/2017 11:52 AM P_Site_Plans_20170327_v1.p df 4 Message Date Time Document Page Label 165 bbannwarth: Delete Length Measurement 4/24/2017 11:52 AM P_Site_Plans_20170327_v1.p df 4 166 bbannwarth: Delete Length Measurement 4/24/2017 11:53 AM P_Site_Plans_20170327_v1.p df 4 167 bbannwarth: Add Length Measurement (8.5 ft)4/24/2017 12:34 PM P_Site_Plans_20170327_v1.p df 1 168 bbannwarth: Add Length Measurement (377.4 ft)4/24/2017 12:34 PM P_Site_Plans_20170327_v1.p df 1 169 bbannwarth: Add Length Measurement (20.6 ft)4/24/2017 12:38 PM P_Site_Plans_20170327_v1.p df 1 170 Ann Fowler: Left Session 4/24/2017 12:41 PM 171 aaskren: Joined Session 4/24/2017 12:46 PM 172 aaskren: Left Session 4/24/2017 12:46 PM 173 Ann Fowler: Joined Session 4/24/2017 2:02 PM 174 Ann Fowler: Left Session 4/24/2017 2:31 PM 175 bbannwarth: Disconnected 4/24/2017 2:44 PM 176 Ann Fowler: Joined Session 4/24/2017 2:50 PM 177 Ann Fowler: Left Session 4/24/2017 3:24 PM 178 Ann Fowler: Joined Session 4/24/2017 3:31 PM 179 Ann Fowler: Reconnected 4/25/2017 7:42 AM 180 Ann Fowler: Add Length Measurement (442'-10")4/25/2017 7:50 AM P_Site_Plans_20170327_v1.p df 4 181 Ann Fowler: Delete Length Measurement 4/25/2017 7:50 AM P_Site_Plans_20170327_v1.p df 4 182 Ann Fowler: Add Length Measurement (119'-10")4/25/2017 7:50 AM P_Site_Plans_20170327_v1.p df 4 183 agafour: Joined Session 4/25/2017 8:44 AM 184 Ann Fowler: Delete Length Measurement 4/25/2017 8:51 AM P_Site_Plans_20170327_v1.p df 4 Message Date Time Document Page Label 185 agafour: Add PolyLine 4/25/2017 8:54 AM P_Site_Plans_20170327_v1.p df 5 186 agafour: Edit PolyLine 4/25/2017 8:54 AM P_Site_Plans_20170327_v1.p df 5 187 agafour: Add PolyLine 4/25/2017 8:55 AM P_Site_Plans_20170327_v1.p df 5 188 agafour: Add PolyLine 4/25/2017 8:55 AM P_Site_Plans_20170327_v1.p df 5 189 agafour: Add PolyLine 4/25/2017 8:55 AM P_Site_Plans_20170327_v1.p df 5 190 agafour: Add PolyLine 4/25/2017 8:56 AM P_Site_Plans_20170327_v1.p df 5 191 agafour: Edit PolyLine 4/25/2017 8:56 AM P_Site_Plans_20170327_v1.p df 5 192 agafour: Add PolyLine 4/25/2017 8:57 AM P_Site_Plans_20170327_v1.p df 5 193 agafour: Add PolyLine 4/25/2017 8:57 AM P_Site_Plans_20170327_v1.p df 5 194 agafour: Add PolyLine 4/25/2017 8:59 AM P_Site_Plans_20170327_v1.p df 5 195 agafour: Add PolyLine 4/25/2017 9:01 AM P_Site_Plans_20170327_v1.p df 5 196 agafour: Edit PolyLine 4/25/2017 9:01 AM P_Site_Plans_20170327_v1.p df 5 197 agafour: Undo 4/25/2017 9:01 AM P_Site_Plans_20170327_v1.p df 5 Message Date Time Document Page Label 198 agafour: Add Line 4/25/2017 9:01 AM P_Site_Plans_20170327_v1.p df 5 199 agafour: Delete Line 4/25/2017 9:01 AM P_Site_Plans_20170327_v1.p df 5 200 agafour: Move PolyLine 4/25/2017 9:01 AM P_Site_Plans_20170327_v1.p df 5 201 agafour: Edit PolyLine 4/25/2017 9:02 AM P_Site_Plans_20170327_v1.p df 5 202 agafour: Add PolyLine 4/25/2017 9:03 AM P_Site_Plans_20170327_v1.p df 5 203 agafour: Edit PolyLine 4/25/2017 9:03 AM P_Site_Plans_20170327_v1.p df 5 204 Ann Fowler: Add Length Measurement (177'-2")4/25/2017 9:03 AM P_Site_Plans_20170327_v1.p df 4 205 Ann Fowler: Add Length Measurement (183'-7")4/25/2017 9:03 AM P_Site_Plans_20170327_v1.p df 4 206 Ann Fowler: Add Length Measurement (177'-5")4/25/2017 9:04 AM P_Site_Plans_20170327_v1.p df 4 207 Ann Fowler: Add Length Measurement (168'-3")4/25/2017 9:04 AM P_Site_Plans_20170327_v1.p df 4 208 Ann Fowler: Add Length Measurement (59'-7")4/25/2017 9:04 AM P_Site_Plans_20170327_v1.p df 4 209 Ann Fowler: Add Length Measurement (125'-11")4/25/2017 9:04 AM P_Site_Plans_20170327_v1.p df 4 210 Ann Fowler: Move Length Measurement 4/25/2017 9:04 AM P_Site_Plans_20170327_v1.p df 4 Message Date Time Document Page Label 211 Ann Fowler: Edit Length Measurement (158'-10")4/25/2017 9:05 AM P_Site_Plans_20170327_v1.p df 4 212 Ann Fowler: Edit Length Measurement (153'-5")4/25/2017 9:05 AM P_Site_Plans_20170327_v1.p df 4 213 Ann Fowler: Edit Length Measurement (166'-11")4/25/2017 9:05 AM P_Site_Plans_20170327_v1.p df 4 214 Ann Fowler: Edit Length Measurement (169'-1")4/25/2017 9:05 AM P_Site_Plans_20170327_v1.p df 4 215 Ann Fowler: Delete Length Measurement 4/25/2017 9:06 AM P_Site_Plans_20170327_v1.p df 4 216 Ann Fowler: Edit Length Measurement (140'-2")4/25/2017 9:06 AM P_Site_Plans_20170327_v1.p df 4 217 agafour: Edit PolyLine 4/25/2017 9:14 AM P_Site_Plans_20170327_v1.p df 5 218 agafour: Move PolyLine 4/25/2017 9:14 AM P_Site_Plans_20170327_v1.p df 5 219 agafour: Edit PolyLine 4/25/2017 9:14 AM P_Site_Plans_20170327_v1.p df 5 220 agafour: Move PolyLine 4/25/2017 9:15 AM P_Site_Plans_20170327_v1.p df 5 221 agafour: Undo 4/25/2017 9:15 AM P_Site_Plans_20170327_v1.p df 5 222 agafour: Edit PolyLine 4/25/2017 9:15 AM P_Site_Plans_20170327_v1.p df 5 223 agafour: Delete PolyLine 4/25/2017 9:15 AM P_Site_Plans_20170327_v1.p df 5 Message Date Time Document Page Label 224 agafour: Add PolyLine 4/25/2017 9:16 AM P_Site_Plans_20170327_v1.p df 5 225 Ann Fowler: Delete Length Measurement 4/25/2017 9:18 AM P_Site_Plans_20170327_v1.p df 4 226 Ann Fowler: Delete Length Measurement 4/25/2017 9:18 AM P_Site_Plans_20170327_v1.p df 4 227 Ann Fowler: Delete Length Measurement 4/25/2017 9:18 AM P_Site_Plans_20170327_v1.p df 4 228 Ann Fowler: Delete Length Measurement 4/25/2017 9:18 AM P_Site_Plans_20170327_v1.p df 4 229 Ann Fowler: Delete Length Measurement 4/25/2017 9:18 AM P_Site_Plans_20170327_v1.p df 4 230 agafour: Add Length Measurement (39 ft)4/25/2017 9:22 AM P_Site_Plans_20170327_v1.p df 5 231 agafour: Delete Length Measurement 4/25/2017 9:22 AM P_Site_Plans_20170327_v1.p df 5 232 agafour: Add Length Measurement (351 ft)4/25/2017 9:23 AM P_Site_Plans_20170327_v1.p df 5 233 agafour: Move Length Measurement 4/25/2017 9:23 AM P_Site_Plans_20170327_v1.p df 5 234 agafour: Delete Length Measurement 4/25/2017 9:23 AM P_Site_Plans_20170327_v1.p df 5 235 agafour: Add Length Measurement (389 ft)4/25/2017 9:24 AM P_Site_Plans_20170327_v1.p df 5 236 agafour: Edit Length Measurement (389 ft)4/25/2017 9:24 AM P_Site_Plans_20170327_v1.p df 5 Message Date Time Document Page Label 237 agafour: Edit Length Measurement (385 ft)4/25/2017 9:24 AM P_Site_Plans_20170327_v1.p df 5 238 agafour: Move Length Measurement 4/25/2017 9:24 AM P_Site_Plans_20170327_v1.p df 5 239 agafour: Edit Length Measurement (385 ft)4/25/2017 9:24 AM P_Site_Plans_20170327_v1.p df 5 240 agafour: Move Length Measurement 4/25/2017 9:25 AM P_Site_Plans_20170327_v1.p df 5 241 Ann Fowler: Reconnected 4/25/2017 9:40 AM 242 agafour: Set status to Reviewing 4/25/2017 10:04 AM 243 agafour: Left Session 4/25/2017 10:04 AM 244 agafour: Joined Session 4/25/2017 10:16 AM 245 agafour: Add Text Box 4/25/2017 10:28 AM P_Site_Plans_20170327_v1.p df 5 246 agafour: Move Text Box 4/25/2017 10:28 AM P_Site_Plans_20170327_v1.p df 5 247 agafour: Edit Text Box (Adequate horizontal and vertical separation between the new water main and other utilities (storm sewer pipes and vaults, sanitary sewer, power, gas, electrical) shall be provided for the operation and maintenance of the water main. Based on the preliminary utilities plan submitted with the land use application ( reference civil plan by ESM, page PP-05 dated 3/27/17), the horizontal separation between the proposed water mains and the proposed storm drains in the alley sections doe 4/25/2017 10:28 AM P_Site_Plans_20170327_v1.p df 5 248 agafour: Move Text Box 4/25/2017 10:28 AM P_Site_Plans_20170327_v1.p df 5 Message Date Time Document Page Label 249 agafour: Edit Text Box (Adequate horizontal and vertical separation between the new water main and other utilities (storm sewer pipes and vaults, sanitary sewer, power, gas, electrical) shall be provided for the operation and maintenance of the water main. Based on the preliminary utilities plan submitted with the land use application ( reference civil plan by ESM, page PP-05 dated 3/27/17), the horizontal separation between the proposed water mains and the proposed storm drains in the alley sections doe 4/25/2017 10:28 AM P_Site_Plans_20170327_v1.p df 5 250 agafour: Add Cloud 4/25/2017 10:29 AM P_Site_Plans_20170327_v1.p df 5 251 agafour: Delete Cloud 4/25/2017 10:29 AM P_Site_Plans_20170327_v1.p df 5 252 agafour: Add Cloud 4/25/2017 10:29 AM P_Site_Plans_20170327_v1.p df 5 253 agafour: Add Popup 4/25/2017 10:29 AM P_Site_Plans_20170327_v1.p df 5 254 agafour: Edit Cloud 4/25/2017 10:29 AM P_Site_Plans_20170327_v1.p df 5 255 agafour: Add Highlight 4/25/2017 10:30 AM P_Site_Plans_20170327_v1.p df 5 256 agafour: Add Highlight 4/25/2017 10:30 AM P_Site_Plans_20170327_v1.p df 5 257 agafour: Add Highlight 4/25/2017 10:30 AM P_Site_Plans_20170327_v1.p df 5 258 agafour: Add Highlight 4/25/2017 10:30 AM P_Site_Plans_20170327_v1.p df 5 259 agafour: Add Highlight 4/25/2017 10:30 AM P_Site_Plans_20170327_v1.p df 5 Message Date Time Document Page Label 260 agafour: Add Highlight 4/25/2017 10:30 AM P_Site_Plans_20170327_v1.p df 5 261 agafour: Add Highlight 4/25/2017 10:30 AM P_Site_Plans_20170327_v1.p df 5 262 agafour: Add Arrow 4/25/2017 10:31 AM P_Site_Plans_20170327_v1.p df 5 263 agafour: Move PolyLine 4/25/2017 10:31 AM P_Site_Plans_20170327_v1.p df 5 264 agafour: Undo 4/25/2017 10:31 AM P_Site_Plans_20170327_v1.p df 5 265 agafour: Rotate PolyLine 4/25/2017 10:31 AM P_Site_Plans_20170327_v1.p df 5 266 agafour: Undo 4/25/2017 10:31 AM P_Site_Plans_20170327_v1.p df 5 267 agafour: Set status to Finished 4/25/2017 10:35 AM 268 agafour: Left Session 4/25/2017 10:35 AM 269 Ann Fowler: Left Session 4/25/2017 10:47 AM 270 agafour: Joined Session 4/25/2017 1:34 PM 271 agafour: Left Session 4/25/2017 3:44 PM 272 Ann Fowler: Joined Session 4/25/2017 3:47 PM 273 cclose: Joined Session 4/25/2017 3:57 PM 274 Ann Fowler: Left Session 4/25/2017 3:58 PM 275 tflatley: Joined Session 4/25/2017 4:55 PM 276 tflatley: Left Session 4/25/2017 4:56 PM 277 tflatley: Joined Session 4/25/2017 4:59 PM 278 tflatley: Left Session 4/25/2017 5:02 PM 279 cclose: Session Expired 4/25/2017 5:03 PM 280 cclose: Reconnected 5/2/2017 8:18 AM Message Date Time Document Page Label 281 cclose: Added 'ECF_Environmental Checklist_20170428_v2.pdf' 5/2/2017 8:19 AM ECF_Environmental Checklist_20170428_v2.pdf 282 cclose: Left Session 5/2/2017 8:32 AM 283 cclose: Joined Session 5/4/2017 3:59 PM 284 cclose: Set status to Finished 5/4/2017 4:09 PM