Loading...
HomeMy WebLinkAboutExhibit 5_S_Generalized Utilities_170425_v1CEDAR RIVER COMMERCIAL WATERWAY -our — OHW OHW OHW W NONNA 10 ,t z O? N Q 2 O c C Z 2 � r � r � o z O? N Q z REVISION BY APPROVED t\) 60 Z OOCnC) BY �Ct7 DATE ® BO�,�� �c� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED ticc 0 0 DATE 3.24.17 SUBTITLE UTILITIES PLAN, GENERALIZED N 01 N p� SYMBOL DATE 3.24.17 ORIG I O�Z� TWN SS — No0 CHECKED SHEET C293 wo ma A � RT SD 01.14.16 o N Cry 2 ��o —100' SSB 00' B EXPANSION 101 T ENGINEER TWN 3.24.17 c�co APPROVED BY DEPT. DATE RECORD DRAWING RT TWN 09.21.16 0� z O? N Q z REVISION BY APPROVED t\) 60 Z OOCnC) BY �Ct7 DATE ® BO�,�� �c� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED ticc 0 0 DATE 3.24.17 SUBTITLE UTILITIES PLAN, GENERALIZED N 01 N p� SYMBOL DATE 3.24.17 ORIG I O�Z� TWN SS — No0 CHECKED SHEET C293 wo ma A � RT SD 01.14.16 o / —100' SSB 00' B ENGINEER TWN 3.24.17 c�co APPROVED BY DEPT. DATE RECORD DRAWING RT TWN 09.21.16 0� Co `7 CHECKED X06 No. W3441886 COMP N0. B APRON D UTILITY REPLACEMENT PROJECT PHASE 2 / TWN zCD ~� n O? N Q z REVISION BY APPROVED t\) 60 SYM OOCnC) BY eEnn oNon� ONOG„8 BLDG 5-403 100' SSB E LI D( RD 1 / U RP(Bo w E o JA �rn 4W A- 1 H, F 1V 10 FW FWII FW CITY OF RENT01 C/)i I� Sly `^' -73SJS ATH LETI C FIELDScu fzq CD 00 I w 1 00 r-1-7 200' SSB200' SSB 2 BI 200' SSB m ” = I / 1, I 41-,11 �o r� � N 11 r-'7 n Co J, LIF E l 771E � I F ATI IAA N I /lTr. E z z CD o �vN vv o' PROPERTY UNE vN� Nn Noo 40 11 i 0 0 0 tc3c� )o J"W —ss A A--- -W--FW —FW 10F FWD =F100' s BLDG 5-112 \ \ \ \VA Nos z 20e L �. GR POSITION D-10 0 -GR 4' _ o @ cs N /E—E- 4 E LA A s FW F 10p' SSB 1OC' SHORELINE SETBACK 00' SSB 2010' SSB Ord 0 JB/AG_ _ 0 Oi — SSB \ II I >> II -r \ BLDG 5-13-J— m I MARCH 24, 2017 SCALE: 1 " = 20' 20 10 0 10 20 40 I SCALE: 1:20 ' LEGEND I I 0 I t E==—_ — _ —_ — S S 4}'A �S�s _Ss— — - _ _ REPLACE 7 LF C W Z AA A A, EXISTING 24" DI PIPE A REPLACEMENT OF o _ FW- 840 SF OF EXISTING FW � MATCH EXISTING SLOPE �N s ASPHALT PAVEMENT _ REPLACE 7 LF 3S$ - — — - EXISTING 12" DI PIPE's__ MATCH EXISTING SLOPEo- STs STORM DRAINAGE LINES TO FUEL SPILL CONTAINMENT SYSTEM • TYPE 2 CATCH BASIN, SOLID LID BOEING COMPRESSED AIR BOEING ELECTRICAL BOEING WATER BOEING FIRE WATER BOEING DATA PROPERTY LEASE LINE 00' SSB 100' SHORELINE SETBACK 200' SSB 200' SHORELINE SETBACK NOTES: IMPERVIOUS SURFACE AREAS: NEW IMPERVIOUS SURFACE AREA: THIS PROJECT RESULTS IN NO NEW IMPERVIOUS SURFACE REPLACED IMPERVIOUS SURFACE: REPLACED ASPHALT PAVEMENT = 840 SF REPLACED CONCRETE PAVEMENT = 750 SF TOTAL REPLACED PAVEMENT = 1,590 SF -200' SHORELINE BUFFER 34� KEY PLAN � SCALE: NONE m "' U'V' 'NU' L. 20 10 0 10 20 40 PLANS PREPARED USING NGVD 29 AS THE PLAN V I VERTICAL DATUM. TO CONVERT TO NAVD 88 SCALE: 1:20 SCALE: 1 " = 20' I � ADD 3.556 FEET TO ALL ELEVATIONS. = O W L z REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ® BO�,�� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN WH DATE 3.24.17 SUBTITLE UTILITIES PLAN, GENERALIZED CURRENT REVISION W3441886 SYMBOL DATE 3.24.17 ORIG 737 MAX FLIGHTLINE UTILITIES—APRON D Cl PROJECT O�Z� TWN 12.21.15 CHECKED SHEET C293 wo ma A � RT SD 01.14.16 ENGINEER TWN 3.24.17 TITLE APRON D FUEL SPILL CONTAINMENT SITE 05- I D CIVIL MASTER RENTON, INA APPROVED BY DEPT. DATE t E==—_ — _ —_ — S S 4}'A �S�s _Ss— — - _ _ REPLACE 7 LF C W Z AA A A, EXISTING 24" DI PIPE A REPLACEMENT OF o _ FW- 840 SF OF EXISTING FW � MATCH EXISTING SLOPE �N s ASPHALT PAVEMENT _ REPLACE 7 LF 3S$ - — — - EXISTING 12" DI PIPE's__ MATCH EXISTING SLOPEo- STs STORM DRAINAGE LINES TO FUEL SPILL CONTAINMENT SYSTEM • TYPE 2 CATCH BASIN, SOLID LID BOEING COMPRESSED AIR BOEING ELECTRICAL BOEING WATER BOEING FIRE WATER BOEING DATA PROPERTY LEASE LINE 00' SSB 100' SHORELINE SETBACK 200' SSB 200' SHORELINE SETBACK NOTES: IMPERVIOUS SURFACE AREAS: NEW IMPERVIOUS SURFACE AREA: THIS PROJECT RESULTS IN NO NEW IMPERVIOUS SURFACE REPLACED IMPERVIOUS SURFACE: REPLACED ASPHALT PAVEMENT = 840 SF REPLACED CONCRETE PAVEMENT = 750 SF TOTAL REPLACED PAVEMENT = 1,590 SF -200' SHORELINE BUFFER 34� KEY PLAN � SCALE: NONE m "' U'V' 'NU' L. 20 10 0 10 20 40 PLANS PREPARED USING NGVD 29 AS THE PLAN V I VERTICAL DATUM. TO CONVERT TO NAVD 88 SCALE: 1:20 SCALE: 1 " = 20' I � ADD 3.556 FEET TO ALL ELEVATIONS. SHORELINE PERMIT MARCH 24 2017 741"D O W L SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE ® BO�,�� ACCEPTABILITY THIS DESIGN AND/OR SPECIFICATION IS APPROVED DRAWN WH DATE 3.24.17 SUBTITLE UTILITIES PLAN, GENERALIZED CURRENT REVISION W3441886 SYMBOL DATE 3.24.17 ORIG 737 MAX FLIGHTLINE UTILITIES—APRON D Cl PROJECT RT TWN 12.21.15 CHECKED SHEET C293 A APRON D Cl PROJECT — SITE DCN -01 RT SD 01.14.16 ENGINEER TWN 3.24.17 TITLE APRON D FUEL SPILL CONTAINMENT SITE 05- I D CIVIL MASTER RENTON, INA APPROVED BY DEPT. DATE RECORD DRAWING RT TWN 09.21.16 CHECKED X06 No. W3441886 COMP N0. B APRON D UTILITY REPLACEMENT PROJECT PHASE 2 TWN TWN 04.06.17 APPROVED APPROVED DWG NO. 05—APRON—D—C293 m