Century Pacific, LP
Quendall Terminals Project Narrative – December 2015 1
Project Narrative, Revised
Project Overview
The Quendall Terminals project is being updated following the completion of the Final EIS and
mitigation document dated August 2015. The attached supplemental materials have been revised to
conform to the mitigation document.
TEAM
This updated entitlement submittal has been prepared for property owners Altino Properties, Inc. and
J.H. Baxter & Co.
The project developer and applicant is:
Century Pacific, LLLP.
Contact: Campbell Mathewson
The following consultants contributed to preparation of the plans and documents:
KPFF Consulting Engineers – Entitlement Lead, Civil Site Development
Contact: Tom Jones
Lance Mueller & Associates – Architecture and Landscaping
Contact: Lance Mueller
Transpo Group – Transportation and Traffic
Contact: Larry Toedtli (retired)
Anchor QEA – Environmental
Contact: Peter Hummel
Aspect Consulting – Geotechnical
PROJECT SIZE AND LOC ATION
The Quendall Terminals project is located at 4350 Lake Washington Boulevard in the northern portion of
Renton, Washington. The project site is bordered by Lake Washington to the west, the Seahawks
Training Facility to the north, Ripley Lane North to the east, and the Barbee Mill site to the south. The
site area is approximately 21.46 acres (20.3 acre main parcel and an isolated 1.15 acre parcel east of
Ripley Lane). The site includes approximately 1,583 feet of shoreline along Lake Washington.
Century Pacific, LP
Quendall Terminals Project Narrative – December 2015 2
EPA ROLE
Environmental remediation and mitigation of the property will be conducted prior to development. The
Environmental Protection Agency (EPA) is the lead agency for all site remediation, and mitigation
actions, which are to be performed at the Quendall Terminals site under Superfund. The actions selected
by EPA must comply with substantive elements of SEPA and other applicable, relevant, and appropriate
environmental reviews and permitting requirements, though the remediation and mitigation actions are
exempt from procedural requirements of SEPA.
The Quendall Terminals Final EIS (August 2015) addresses the current status of the EPA proceedings.
PERMITS AND ZONIN G
As identified in the Final EIS for the Quendall Terminals project, issued August 2015, the following
permits and approvals are required to complete redevelopment of the site. The permits shown in italics
are those anticipated to complete the City of Renton Land Use Shoreline and Master Site plan
entitlement for the Quendall Terminals project:
City of Renton Permits
Master Site Plan Approval
Shoreline Substantial Development Permit
Binding Site Plan
Site Plan Review
Construction Permits
Building Permits
Utility Approvals
Property Permits & Licenses
The FEIS also identifies the following state and federal permits and approva ls required to complete
redevelopment of the site:
Federal
CERCLA Remediation (for site cleanup/remediation prior to redevelopment)
State of Washington
Dept. of Ecology, Construction Stormwater General Permit
Dept. of Ecology, NPDES Stormwater Discharge Permit
Dept. of Fish and Wildlife, Hydraulic Project Approval
Century Pacific, LP
Quendall Terminals Project Narrative – December 2015 3
Zoning
The applicable zoning classification and comprehensive plan designation for the site is (COR)
Commercial/Office/Residential. The applicable shoreline master program designation for the site is
“urban.”
The Seahawks Training Facility to the north and the Barbee Mill site to the south have the same COR
zoning classification and designation per the City of Renton comprehensive plan.
ACCESS
Interstate 405 provides regional access to the project site via the Lake Washington Boulevard/44th Street
interchange. Lake Washington Boulevard and Ripley Lane (aka Seahawks Way) front the eastern
boundary of the site. Two entrances to the project are proposed from these public rights of way. To the
south an existing entrance to the Barbee Mill site will be used as a primary site access. A second site
access will be provided at the northeast end of the site by connection to Ripley Lane. Both s ite access
points cross a now abandoned Burlington Northern Santa Fe at -grade railroad line. New on-site public
streets and private access tracts will be constructed to provide site access to the buildings.
CURRENT USE
The site is currently vacant with the exception of a small shed used during past logging operations. The
site has been used for various industrial purposes in the past, most recently as a log sorting and storage
yard. Historical industrial uses have included a refinery, and have resulted in hazardous substances and
soil contamination.
Various small docks, structures, and pilings are located at the west edge of the project site along Lake
Washington.
Adjacent Uses
Seahawks Training Facility, a football training facility, to the north.
Barbee Mill, a residential development, to the south.
Pan Abode, an existing cedar home manufacturing facility, to the southeast (as of December 2015,
no longer on site). Future planning includes a hotel (Hawks Landing).
Lake Washington Boulevard, Ripley Lane, and Interstate 405 are to the east.
Lake Washington is located to the west.
PROPOSED USES
The proposed development includes construction of four mixed-use buildings with structured and surface
parking for 1,366 vehicles. The development will include 692 residential units, office space, 20,025 square
feet of retail, and 9,000 square feet of restaurant, and public trails/paths.
Density
The gross site area totals 883,350 SF (20.28 Ac)
Century Pacific, LP
Quendall Terminals Project Narrative – December 2015 4
Deductions for Public Streets total 98,600 SF (2.26 Ac)
Deductions for Private Access total 13,800 SF (0.32 Ac)
This results in a Net Site Area of 770,950 SF (17.70 Ac)
Based on a proposed density of 692 dwelling units provides a net density of 39.1 units/Ac
SPECIAL SITE FEATURE S
The site contains approximately 0.81 acres (35,181 square feet) of wetlands and has approximately 1,583
feet of shoreline along Lake Washington. Site slopes are generally 0 to 5 percent with localized slopes up
to 2H:1V at debris piles and up to 1H:1V at the bank of the lake.
PROPOSED OFF -SITE IMPROVEMENTS
WSDOT has identified future improvements to the I-405/Northeast 44th Street interchange as part of the
WSDOT I-405 Renton to Bellevue improvement project. Project contributions with and without the I-405
improvements are set forth in the EIS. Several additional improvements are proposed or identified by the
project to mitigate project generated impacts. These include:
A southbound left-turn lane, a dedicated westbound right-turn lane, and an eastbound left-turn lane
at the Ripley Lane/Lake Washington Boulevard intersection.
A northbound left-turn lane at the Main Project Access/Barbee Mill/Conner Homes Access
intersection with Lake Washington Boulevard.
Installation of a new traffic signal at the Main Project Access/Barbee Mill/Conner Homes Access
intersection with Lake Washington Boulevard, or at the intersection of Ripley Lane with Lake
Washington Boulevard, as determined by the City.
A westbound left-turn lane at the Hawks Landing Access/Lake Washington Boulevard intersection.
Traffic calming on Lake Washington Boulevard south of N. 41st Street to encourage primary trips to
use I-405 corridor.
Implementation of programs that reduce auto travel to/from the site, including access to future
transit on I-405 or Lake Washington Boulevard.
Construct pedestrian and bicycle facilities in the vicinity of the site.
Note: Improvements listed are based on full build-out, initial phased development will not require all
improvements.
SOILS AND DRAINAGE C ONDITIONS
Soils
Site soils consist of highly heterogeneous shallow alluvial and lacustrine silts, sands and peat
underlain by a coarser sand-gravel alluvium. The shallow alluvial deposits are overlain by years
of fill deposits.
Century Pacific, LP
Quendall Terminals Project Narrative – December 2015 5
Drainage Conditions
Stormwater runoff from the existing site either infiltrates or flows overland to Lake Washington with no
known flooding problems. Stormwater runoff from the proposed development will be collected and
conveyed via a piped stormwater system to new outfalls at Lake Washington. Runoff from pollution-
generating surfaces will be treated prior to discharge to the lake.
SHORELINE
The project site includes approximately 1,583 feet of shoreline along Lake Washington. The existing
shoreline varies from gently sloping wetlands to steep (1H:1V) banks. Various docks and structures are
located along the bank and in the water along the shore.
The shoreline includes a 100-foot average width riparian buffer upland from the ordinary high water
mark. A shoreline restoration plan is being designed and approved under EPA direction. The following
work is anticipated within 200 feet of the Lake Washington shoreline:
Activities related to shoreline restoration, contaminant remediation and mitigation, including capping of
the site, and construction of mixed-use buildings, roads, utilities, retaining walls, hardscape/landscape
areas.
VIEW CORRIDORS
The site is currently vacant, so construction of the proposed development will create potential partial
obstructions from certain vantage points around the site. The design of the project will maintain view
corridors between the proposed buildings.
TREE RETENTION
The Quendall Terminals site will undergo environmental remediation and mitigation for on -site
contaminated soils after Master Site Plan submittal and prior to final design and construction of the
development included in this proposal. The site remediation is under the direction of the EPA and will
include significant removal of on-site trees and placement of fill. The assumed existing conditions for
Master Site Plan design are the post remediation and mitigation conditions.
CONSTRUCTION MITIGAT ION DESCRIPTION
Construction is anticipated to commence following EPA approval of a site cleanup action plan. Full
project buildout is expected two years following the commencement of site remediation and mitigation
construction.
The following construction mitigation measures are anticipated:
No special hours of construction activity are anticipated outside what is allowed under the
current City of Renton Municipal Code.
Century Pacific, LP
Quendall Terminals Project Narrative – December 2015 6
A proposed haul route plan will be developed prior to construction.
A Temporary Erosion Sedimentation Control Plan will be developed prior to construction to
minimize erosion.
A traffic control plan will be developed prior to construction to address traffic and transportation
impacts.
CONSTRUCTION ESTIMAT E
Estimated Fill:
A fill cap is anticipated to be placed over the site as part of EPA site remediation and mitigation. The
combined volume of the fill cap and additional fill required to achieve building grades is estimated to be
approximately 50,000 to 100,000 cubic yards. Actual volumes will be determined by the final EPA site
remediation plan and final site design.
Estimated Costs:
Total estimated construction cost and estimated fair market value:
Construction is estimated to total $390 million
Project Fair Market Value is $390 million