Five copies of each item below and an electronic copy of each
UPDATED DOCUMENTS
Project Narrative
Density Worksheet
Tree Retention Worksheet
UPDATED PLANS
Site Plan
Parking Level Plans
Typical Architectural Elevations
Conceptual Landscape Plan
Tree Inventory Plan
Topographic Survey (from 2009)
Conceptual Grading and Drainage Plans
Conceptual Utility Plans
PREVIOUSLY SUBMITTED REPORTS FOR REFERENCE
Original Environmental Checklist (SEPA)
Urban Center Overlay District C Statement
Neighborhood Detail Map
Flood Hazard Map
Preliminary Geotechnical Study
Storm Drainage Report (TIR)
Sewer Report
Title Report
Historical and Cultural Report (Larson, March 1997)
Wetland Assessment, Lake Study, Habitat Data, and Conceptual Restoration Report