Loading...
HomeMy WebLinkAboutQuendall Terminals Table of Contents revised Table of Contents December 2015 Quendall Terminals Master Site Plan Update December 2015 TABLE OF CONTENTS Five copies of each item below and an electronic copy of each UPDATED DOCUMENTS  Project Narrative  Density Worksheet  Tree Retention Worksheet UPDATED PLANS  Site Plan  Parking Level Plans  Typical Architectural Elevations  Conceptual Landscape Plan  Tree Inventory Plan  Topographic Survey (from 2009)  Conceptual Grading and Drainage Plans  Conceptual Utility Plans PREVIOUSLY SUBMITTED REPORTS FOR REFERENCE  Original Environmental Checklist (SEPA)  Urban Center Overlay District C Statement  Neighborhood Detail Map  Flood Hazard Map  Preliminary Geotechnical Study  Storm Drainage Report (TIR)  Sewer Report  Title Report  Historical and Cultural Report (Larson, March 1997)  Wetland Assessment, Lake Study, Habitat Data, and Conceptual Restoration Report