Loading...
HomeMy WebLinkAboutHEX Agenda LUA09-151 Quendall TerminalsHEX_AGENDA_04.18.2017 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT HEARING EXAMINER PUBLIC HEARING APRIL 18, 2017 AGENDA COMMENCING AT 10:00 A.M. COUNCIL CHAMBERS, 7TH FLOOR, RENTON CITY HALL 1055 S GRADY WAY, RENTON, WA 98057 THE APPLICATION(S) LISTED ARE IN ORDER OF APPLICATION NUMBER ONLY AND NOT NECESSARILY THE ORDER IN WHICH THEY WILL BE HEARD. ITEMS WILL BE CALLED FOR HEARING AT THE DISCRETION OF THE HEARING EXAMINER. PROJECT NAME: Quendall Terminals PROJECT NUMBER: LUA09-151, ECF, EIS, SA-M, SM, DA PROJECT DESCRIPTION: The applicant is requesting Master Plan Review, Binding Site Plan, Shoreline Substantial Development Permit and SEPA Environmental Review for a mixed -use development located at 4350 Lake Washington Blvd. The site is 21.46 acres and is zoned Commercial/Office/Residential (COR) and located within the Urban Shoreline designation. The 21.46-acre site would be divided into 7 lots of which 4 would contain 6 - 7 story mixed-use buildings. Overall, the development would consist of 800 residential units (resulting in a net residential density of 46.4 units/acre), 245,000 square feet of office, 21,600 square feet of retail and 9,000 square feet of restaurant. The applicant has proposed to dedicate 3.65 acres for public right-of-way, which would provide access to the 7 proposed lots. Surface and structured parking would be provided for 2,171 vehicles. The site contains approximately 0.81 acres of wetlands and 1,583 linear feet of shoreline along Lake Washington. The subject site has received a Superfund designation from the U.S. Environmental Protection Agency (EPA) and the property owners are currently working on a remediation plan with EPA. Proposed improvements include remediation of existing contamination, stormwater and sewer improvements. 2/15/10 - ERC issued Determination of Significance. Comment period en ds March 5, 2010. 12/10/10 - Issued Draft EIS. Comment period ends January 10, 2011. 1/5/11 - Comment period extended to January 25, 2011. 1/21/11 - Comment period extended to February 9, 2011 2/14/11 - Scheduled for ERC DEIS comment discussion.